Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.5 LAccepted-AOC AT LOYABAD PO BANSJORA DIST DHANBAD | DHANBAD | JHARKHAND | 818142 | ₹5.5 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹5.5 LRejected-Finance 0 2 12 SIJUA TETULMURI DHANBAD DHANBAD JHARKHAND 828121 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | ₹5.5 L | L-2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical ANGAR PATHRA P O KATRASGARH DIST DHANBAD DHANBAD JHARKHAND INDIA 828113 | DHANBAD | JHARKHAND | 828113 | - | - | Rejected-Technical Reject |
Tender Value
₹6.5 L
EMD Value
₹8,200
Closing Date
8 Dec 2025, 6:00 pmClosed
AREA MANAGER (ENM) KATRAS AREA
OFFICE OF THE GENERAL MANAGER BCCL KATRAS AREA IV ENM DEPT. Post-SIJUA PIN-828121 JHARKHAND
DISAMANTLING OF 4000 GPM KIRLOSKAR PUM AND 2000 GPM GRW PUMP SET FROM SURFACE AND INSTALLATION OF COMPPLETE PUMP SET ON PONTOON WITH TRANSPORATATION PUMP OF FROM INSATALLATION POINT TO EAST MOST SIDE OF AKWMC,OCP
2025_BCCL_348318_1
BCCL/KA/IV/ENM/E-TEN/25-26/100 DT.28.11.2025
Open Tender
Electrical and Maintenance Works
15 days
AKWMCAND kc2pit KATRAS AREA IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,200
16 Dec 2025
28 Nov 2025
9 Dec 2025
28 Nov 2025
8 Dec 2025
28 Nov 2025
28 Nov 2025 - 2 Dec 2025
eProcurement System of Coal India Limited Created By: VIKASH KUMAR Created Date/Time: 15-Dec-2025 03:44 PM Tender Title: DISAMANTLING OF 4000 GPM KIRLOSKAR PUM AND 2000 GPM GRW PUMP SET FROM SURFACE AND INSTALLATION OF COMPPLETE PUMP SET ON PONTOON WITH TRANSPORATATION PUMP OF FROM INSATALLATION POINT TO EAST MOST SIDE OF AKWMC,OCP Tender ID: 2025_BCCL_348318_1
Tender Inviting Authority: AREA MANAGER(E&M) NIT REF.NO.BCCL/KA-IV/AM(E&M)/e-TENDER/2025-26/100
Name of Work:- (1) DISAMANTLING OF 4000 GPM KIRLOSKAR PUM AND 2000 GPM GRW PUMP SET FROM SURFACE AND INSTALLATION OF COMPPLETE PUMP SET ON PONTOON WITH TRANSPORATATION OF PUMP FROM INSATALLATION POINT TO EAST MOST SIDE OF AKWMC,OCP.(2) BREAK DOWN 7.5 HP,SUBMERSINLE PUMP MOTOR SET LIFTTING FROM BORE HOLE AND OTHER LOWERING INSTALLATION AT T.B WARD 48 UNIT UNDER KATRAS AREA.(3) DSM-3 PUMP 2(TWO) NOS.DISMANTLING TRANSPORTING FROM COAL DUMP COLONY AND DSM-2 PUMP FROM RHK TILATAND TO KCC WORK SHOP AND AFTER REPAIRING BRINGING TO CDC AND RHK AND INSTALLATION THE SAME AT CDC AND RHK UNDER KATRAS AREA.(4) DISMANTLING,REMOVING 1.5" DIA BLOCKED PIPE 195 FT AND NEW 1.5" DIA PVC PIPE LAYING AND JOINTING AFTER EARTH/TRENCH CUTTING AT NEAR SUB-STATION KCC, UNDER KATRAS AREA.(5) 7.5 H.P SUBMERSIBLE PUMP MOTOR SET WITH 2" PIPE 17 NOS.CABLE AND DISMANTLING AND LIFTTING FROM NO.1 OLD WEIGH BRIDGE SIDE NEW BORE HOLE AND OTHER 7.5 H.P SUBMERSIBLE PUMP WITH ITS ACCESSORIES LOWERING AND INSTALLATIONAT COAL DUMP COLONY,UNDER KA.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Chouhan Engineering Works (GSTN-20AEIPC8751J1ZM) BID ID -1201857 550308.01 -.02 550197.95 Five Lakh Fifty Thousand One Hundred and Ninty Seven
2.00 UNIVERSAL ENTERPRISES (GSTN-20ALCPS4394L2ZT) BID ID -1202496 550308.01 0.00 550308.01 Five Lakh Fifty Thousand Three Hundred and Eight
Lowest Amount Quoted BY: Chouhan Engineering Works(550197.95)
BOQ Summary Details Tender Title: DISAMANTLING OF 4000 GPM KIRLOSKAR PUM AND 2000 GPM GRW PUMP SET FROM SURFACE AND INSTALLATION OF COMPPLETE PUMP SET ON PONTOON WITH TRANSPORATATION PUMP OF FROM INSATALLATION POINT TO EAST MOST SIDE OF AKWMC,OCP Tender ID: 2025_BCCL_348318_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Chouhan Engineering Works (BID ID -1201857) 550197.95 L1
2 UNIVERSAL ENTERPRISES (BID ID -1202496) 550308.01 L2
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.40 MB
BOQ_361030.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid