Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 194 METHIBARI SALBARI PO SUKNA PIN 734 009 DIST DARJEELING | DARJEELING | WEST BENGAL | 734009 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹49.5 L
EMD Value
₹99,056
Closing Date
23 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of the Project Manager, Jaldhaka Hydel Proj
Office of the Project Manager, Jaldhaka Hydel Project, Kalimpong-734503
Replacement of Sill Beams of the Log Gates and Main Gates at Apron Nos. 2, 3 and 4, Thorough Concreting of Apron No. 2, Replacement of Bottom Rubber Seals of Five Spillway Gates, Including Construction of a Temporary Walkway of Bindu Barrage, JHP
2026_WBSED_1048409_1
PM/JHP/CIVIL/e-TENDER/26-27/36 dt.03.11.2026
Open Tender
Miscellaneous Services
Percentage
70 days
Jaldhaka Hydel Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹99,056
25 Nov 2026
9 Nov 2026
25 Nov 2026
9 Nov 2026
23 Nov 2026
9 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of empty cement bags in good condition. | 7,000 | nos. | 3.33 | ₹23,310 |
| 2 | Filling empty cement bags with local sand stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. | 7,000 | nos. | 3.54 | ₹24,780 |
| 3 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.
[Rate provided is exclusive of the cost of stone boulders and sausage crate] | 50 | M3 | 430.26 | ₹21,513 |
| 4 | Labour for dumping boulder in pocket crates within a lead of 150 m [Mode of measurement is volume of pocket crate] | 500 | M3 | - | - |
| 5 | Supply, delivery and stacking of boulder (size 150 mm & above) at site collected from river bed.. [Deduction of shrinkage is to be made as applicable] | 470 | M3 | - | - |
| 6 | Weaving wire mattress as directed with wire of 4 mm dia. And making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G. I. wire.
(With 100mm x 100mm mesh). | 2,750 | M2 | 203.01 | ₹5,58,277.5 |
| 7 | Supply of Polythene sheet at site. | 50 | kg | 150 | ₹7,500 |
| 8 | Dismantling of sorrounding concrete of Sill beam of Log gate and spillway gate. | 120 | Cum | 4,547.07 | ₹5,45,648.4 |
| 9 | Fabrication , supply, erection and commissioning of embeded parts consisting of seal beam, slide track / roller track, side seal seats and guide path with all accessories for spillway vertical service gate / stoplog gate/ other vertical lift element of dams and barrages made of MS material consisting of angle , channel, beam, plate, flat, etc. conforming to IS : 2062 - 2011/latest revision manufactured as per approved drawing and direction including cost of Materials, Machinaries , Manpower, Cutting, Aligning, Anchoring, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as per specification (without painting).
For Seal beam. | 4,000 | kg | 161 | ₹6,44,000 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 8,700 | KG | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_2567057.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .