Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30,573.24Accepted-Finance | ₹30,573.24 | L1 | Accepted-Finance Found in order |
| 2 | L2₹31,455.76+₹882.52 (2.89%)Accepted-Finance | ₹31,455.76+₹882.52 (2.89%) | L2 | Accepted-Finance Found in Order |
| 3 | L3₹33,094.74+₹2,521.50 (8.25%)Accepted-Finance | ₹33,094.74+₹2,521.50 (8.25%) | L3 | Accepted-Finance Found In order |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
4 Aug 2026, 6:00 pmClosed
Executive Engineer CID Division PDC Bemina.
Srinagar
Annual Maintenance of Assets of sub division Pulwama including Gem Purchase.
2026_SPDC_313306_4
E-nit no 02 of 2026-27
Open Tender
Civil Works
Percentage
365 days
South kashmir
Please refer Tender documents.
5 documents required · 5 mandatory
₹400
CPAO Wing PDC Bemina.
₹2,000
Office of the Executive Engineer CID Division
6 Aug 2026
24 Jun 2026
5 Aug 2026
24 Jun 2026
4 Aug 2026
24 Jun 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | cum | 6,540.45 | ₹6,540.45 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 1 | sqm | 286.35 | ₹286.35 |
| 3 | Supplying and fixing of river staff gauge with clearly marked graduations (in meters), made of corrosion-resistant plate, fixed on MS iron post/angle frame already embedded in concrete bed, including fabrication, painting, lettering, nuts & bolts, and complete in all respects. | 1 | each | 3,000 | ₹3,000 |
| 4 | Manual channelisation at gauge site by clearing, dressing and shaping of stream bed to ensure smooth and uniform flow towards the staff gauge, including removal of boulders, debris, silt, minor excavation, leveling, and disposal of excavated material within lead, complete in all respects. | 1 | job | 10,000 | ₹10,000 |
| 5 | Taking cross-sections at gauge site including measurement of river/stream cross-section using levelling instrument/total station, recording of bed levels, water level, width, and preparation of field notes and drawings, complete in all respects. | 1 | each | 10,000 | ₹10,000 |
| 6 | Providing ponies for shifting survey equipment and allied items from road site to actual site and from one camp site to other | 1 | per day | 1,000 | ₹1,000 |
| 7 | Providing and fixing nickel plated M.S. pipe curtain rods with nickel plated brackets 25 mm dia (heavy type) | 1 | metre | 192 | ₹192 |
| 8 | Carriage of materials by mechanical transport | 1 | Trip | 500 | ₹500 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.52 MB
BOQ_1013964.xls
BOQ • 0.28 MB
Extension022026AMC.pdf
PDF • 0.66 MB
ExtensionNotice01.pdf
PDF • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .