Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.6 L+₹23,040.04 (9.81%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.6 L+₹25,163.73 (10.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.9 L+₹54,134.09 (23.1%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹3.4 L+₹1.1 L (45.1%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
29 Aug 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Rajouri
Construction and Renovation of Outer wall of newly established Mission Yuva Office ward No 08 City Rajouri
2026_PWDJK_321541_15
e NIT NO 69 of 2026-27 Dated 19-08-2026
Open Tender
Civil Works
Percentage
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer
₹8,000
3 Sept 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
29 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge | 21 | Cum | 479.3 | ₹10,065.3 |
| 0.0 | Providing and laying in position Cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) | 3.5 | Cum | 4,826.5 | ₹16,892.75 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 11.03 | Cum | 4,774.46 | ₹52,662.29 |
| 0.0 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 15.62 | cum | 7,571.55 | ₹1,18,267.61 |
| 0.0 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 15.62 | Cum | 1,455.65 | ₹22,737.25 |
| 0.0 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 126 | Sqm | 283.8 | ₹35,758.8 |
| 0.0 | Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete | - | - | - | - |
| 0.9 | Foundations, footings, bases of columns etc | 41 | Sqm | 286.35 | ₹11,740.35 |
| 0.0 | Finishing walls with 100% Premium acrylic emulsion paint havingVOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives. New work (Two or more coats applied @ 1.43 litre/10 sqm. Over & including priming coat of exterior primer applied @ 0.90 litre/10 sqm." | 126 | Sqm | 157.3 | ₹19,819.8 |
| 0.0 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 200 | Kg | 181.6 | ₹36,320 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1074318.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .