Tender Value
₹48.7 L
EMD Value
₹49,000
Closing Date
11 Sept 2026, 6:00 pmClosed
Executive Engineer, Rajkot Irrigation Division, Rajkot.
AJI-III IRRIGATION SCHEME. Strengthening work of Aqueduct at Ch. 7170m & Ch. 4560 of LBMC of Aji-III Irrigation Scheme
339598
SBD-17 of 2026-27
Open
Civil - All
Works
Rajkot
4 documents required · 4 mandatory
₹1,500
Executive Engineer, Rajkot Irrigation Division Rajkot
₹49,000
27 Aug 2026
27 Aug 2026
27 Aug 2026
11 Sept 2026
27 Aug 2026
NAME OF WORK :-
Strenthening Work of Aqueduct at Ch. 7170 m & Ch. 4560 of LBMC of Aji-III Irrigation Scheme.
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Removing plaster including racking out joints 20mm deep etc complete 1548.00 Sqm. 71.00 Rupees: Seventy One
a) cement plaster. Only.
2 Excavation in all sort of strata and formations incl. depositing the unuseful 90.00 Cum 180.00 Rupees: One Hundred
excavated stuff as and where directed incl sorting and stacking useful Eighty Only.
materials as directed upto 30 mt lead etc. complete incl. dewatering. (Depth
(For all type canal & foundation trenches of C.D. works)
(B) IN SOFT ROCK.
3 Preparation of spillway Piers and allied works foundations incl. removal of 3062.00 Sqm. 8.90 Rupees: Eight & Ps.
loose weathered material incl. hard rock by wedging, chiseling with all Ninty Only.
labours,tools and materials for cleaning the Existing reinforcement of
surfaces with sand blasting, compressed air and water jetting as required
4 Providing, cutting, bending, binding and fixing in position as per drawing 18.50 M.T. 76574.00 Rupees: Seventy Six
.TMT BAR , reinforcement for R.C.C. works and anchor bars incl cost of Thousand Five Hundred
black annealed 16 to 18 BWG M.S.. Wire etc.complete with all lead and lift. Seveny Four Only.
5 Prov. and Laying in position Controlled cement concrete using cement, sand 248.00 Cum 5125.00 Rupees: Five Thousand
and crushed aggregate by mass and machine mix for R.C.C/CC work One Hundred Twenty
including necessary formworks centring scaffolding compaction by Five Only.
mechanical vibrator, curing as directed with all lead & lift etc complete
Excluding the cost of reinforcement
FOR SKIN CONC., FRICTION BLOCKS, ST, BASIN
a) Concrete grade M-20 and MSA- 20mm
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
6 Providing and fixing in position I.R.C. Fabrics of mesh 6"x6" & 10 gauge, 2190.00 Sqm. 283.00 Rupees: Two Hundred
reinforcement with necessary nailing in position, overlap etc as directed with Eighty Three Only.
all lead and lift etc. complete.
7 Providing 40 mm thick guniting in cement mortar (1:2) for spillway works by 2190.00 Sqm. 640.00 Rupees: Six Hundred
using guniting equipment and air compressor and Accessories incl. finishing, Forty Only.
curing etc complete with cost of materials and labours but Excluding cost of
IRC Fabric reinforcement with all lead and lift.
8 Back filling with selected earth brought from out side borrow area or from 60.00 Cum 141.00 Rupees: One Hundred
excavated useful material including watering ramming, consolidation with Forty One Only.
pnuematic temping and all lead and lift etc complete
Rupees: Forty Eight Lac Seventy Thousand Eight Hundred Eight & Ps. Eighty Only
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the estimated
rates mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate
of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of contractor. Rajkot Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender P 1 to 14.pdf
2- SBD Aquaduct Rep - Aji-3 P 1 to 188.pdf
3 Sch B - Aquaduct Rep - Aji-3 P 189 to 190.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .