| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance KOKKATTU BUILDING KOKKATTU BUILDING HOC JUNCTION AMBALAMUGAL ERNAKULAM KERALA 682302 | ERNAKULAM | KERALA | 682302 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹2.7 L (1.80%)Admitted-Finance | ₹1.5 Cr+₹2.7 L (1.80%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹57.3 L (38.7%)Admitted-Finance KARNATAKA | RAICHUR | KARNATAKA | 584123 | ₹2.1 Cr+₹57.3 L (38.7%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹74.0 L (50.0%)Admitted-Finance IX 526 527 HILL PALACE ROAD KARINGACHIRA IRUMPANAM P O TRIPUNITHURA ERNAKULAM KERALA 682309 | ERNAKULAM | KERALA | 682309 | ₹2.2 Cr+₹74.0 L (50.0%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 Cr+₹77.4 L (52.3%)Admitted-Finance IV 47A CHITRAPUZHA KRL ROAD IRIMPANAM ERNAKULAM KERALA 682309 UDYAM KL 02 0001500 33AAECA8044R1ZA B 32AAECA8044R1ZC R MSME STATUS AS VERIFIED | ERNAKULAM | KERALA | 682309 | ₹2.3 Cr+₹77.4 L (52.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Aarkay Erectors Pvt.Ltd. L5 | HITECH STEEL FABRICATORS AND ERECTORS L1 | APRA INFRAPROJECTS L6 | C P SAIDHU L2 | S.Thartius Enginnering contractors L3 | S K BOILERS PVT LTD L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Fabrication and Erection of Sulphuric acid storage tanks-2 nos of 5000MT capacity at FACT-CD, Ambalamedu. | |||||||||
| 1.01 | Fabrication and Erection of Tanks:
Collection/Transportation of free issue materials,
Fabrication, erection, welding, testing & calibration of 2 nos Sulphuric Acid Storage Tank at FACT-CD as per the scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached. Erection shall be by jacking up method. | 300 | MT | 1,21,50,000 ₹1,43,37,000 | 78,00,000 ₹92,04,000 Lowest | 1,29,00,000 ₹1,52,22,000 | 78,00,000 ₹92,04,000 Lowest | 1,13,40,000 ₹1,33,81,200 | 1,32,00,000 ₹1,55,76,000 |
| 1.02 | Fabrication and Erection of Structurals:
Collection/Transportation of free issue materials,
Fabrication, erection & welding of supports stairway, platforms and ladders pipe supports, etc required for 2 nos Sulphuric Acid Storage Tank, Pipe Supports and platforms at FACT-CD as per the scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached. | 85 | MT | 34,42,500 ₹40,62,150 | 20,40,000 ₹24,07,200 Lowest | 40,80,000 ₹48,14,400 | 28,05,000 ₹33,09,900 | 27,75,250 ₹32,74,795 | 28,05,000 ₹33,09,900 |
| 1.03 | Bottom Plate Painting:
Surface preparation by Wire brush cleaning and applying 1 coat (20 microns/coat) of synthetic Zinc Phosphate primer and one coat of (80microns) Bituminous paint on bottom side of the bottom plate as per scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached | 850 | M2 | 1,53,000 ₹1,80,540 | 1,02,000 ₹1,20,360 | 2,97,500 ₹3,51,050 | 84,150 ₹99,297 Lowest | 1,73,400 ₹2,04,612 | 2,55,000 ₹3,00,900 |
| 1.04 | Shell Painting:
Surface preparation by Shot/Grit blasting to SA 2½, application of 2 coats of 50 microns each per coat of Alkyd High build zinc phosphate primer and 3
coats (25 micron per coat) of finish paint of acid alkali
heat resistant paint on all the external shell surfaces as per scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached. | 2,200 | M2 | 9,30,600 ₹10,98,108 | 11,00,000 ₹12,98,000 | 15,40,000 ₹18,17,200 | 7,26,000 ₹8,56,680 Lowest | 12,67,200 ₹14,95,296 | 7,70,000 ₹9,08,600 |
| 1.05 | Painting of Structurals::
Surface preparation by Wire brush cleaning and appying 2
coats (20 microns/coat) of Alkyd High build zinc phosphate primer and two coats of (25 microns) finish epoxy resin based enamel paint as per scope of work detailed in Special Conditions of Contract, General Conditions
of Contract, drawings and specification sheets attached.
Chequred plates shall be finish painted with alkyd antiskid
abrasion resistant synthetic floor paint. | 2,000 | M2 | 8,46,000 ₹9,98,280 | 3,60,000 ₹4,24,800 | 11,00,000 ₹12,98,000 | 1,98,000 ₹2,33,640 Lowest | 5,04,000 ₹5,94,720 | 6,00,000 ₹7,08,000 |
| 1.06 | Shot/Grit blasting on the internal surface
Shot/Grit blasting on the internal surfaces of the tank to
remove mill scales and slag as per the scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached. | 3,050 | M2 | 13,72,500 ₹16,19,550 | 10,06,500 ₹11,87,670 Lowest | 21,35,000 ₹25,19,300 | 10,06,500 ₹11,87,670 Lowest | 12,07,800 ₹14,25,204 | 10,67,500 ₹12,59,650 |
| 1.07 | Miscellaneous jobs:
Providing assistance for miscellaneous jobs wherever
required in connection with fabrication, Erection &
commissioning of storage facility. | 100 | MDY | 2,07,000 ₹2,44,260 | 1,35,000 ₹1,59,300 | 1,45,000 ₹1,71,100 | 1,50,000 ₹1,77,000 | 1,32,000 ₹1,55,760 | 1,20,000 ₹1,41,600 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
18 Dec 2020, 11:00 amClosed
SM(Mat)-C
Contracts Department, Corporate Materials, FACT
Fabrication and erection of 2 nos. sulphuric acid tank of 5000 MT capacity at FACT CD-Ambalamedu
2020_FACT_597620_1
06082/2020-2021/E22431
Open Tender
Miscellaneous Works
Item Rate
150 days
FACT CD, Ambalamedu
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹2 L
Yes
27 Jan 2021
18 Nov 2020
19 Dec 2020
18 Nov 2020
18 Dec 2020
18 Nov 2020
Fabrication and Erection of Sulphuric acid storage tanks-2 nos of 5000MT capacity at FACT-CD, Ambalamedu.
Fabrication and Erection of Tanks: Collection/Transportation of free issue materials, Fabrication, erection, welding, testing & calibration of 2 nos Sulphuric Acid Storage Tank at FACT-CD as per the scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached. Erection shall be by jacking up method.
Fabrication and Erection of Structurals: Collection/Transportation of free issue materials, Fabrication, erection & welding of supports stairway, platforms and ladders pipe supports, etc required for 2 nos Sulphuric Acid Storage Tank, Pipe Supports and platforms at FACT-CD as per the scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached.
Bottom Plate Painting: Surface preparation by Wire brush cleaning and applying 1 coat (20 microns/coat) of synthetic Zinc Phosphate primer and one coat of (80microns) Bituminous paint on bottom side of the bottom plate as per scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached
Shell Painting: Surface preparation by Shot/Grit blasting to SA 2½, application of 2 coats of 50 microns each per coat of Alkyd High build zinc phosphate primer and 3 coats (25 micron per coat) of finish paint of acid alkali heat resistant paint on all the external shell surfaces as per scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached.
Painting of Structurals:: Surface preparation by Wire brush cleaning and appying 2 coats (20 microns/coat) of Alkyd High build zinc phosphate primer and two coats of (25 microns) finish epoxy resin based enamel paint as per scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached. Chequred plates shall be finish painted with alkyd antiskid abrasion resistant synthetic floor paint.
Shot/Grit blasting on the internal surface Shot/Grit blasting on the internal surfaces of the tank to remove mill scales and slag as per the scope of work detailed in Special Conditions of Contract, General Conditions of Contract, drawings and specification sheets attached.
Miscellaneous jobs: Providing assistance for miscellaneous jobs wherever required in connection with fabrication, Erection & commissioning of storage facility.
C P SAIDHU
S.Thartius Enginnering contractors
S K BOILERS PVT LTD
Aarkay Erectors Pvt.Ltd.
APRA INFRAPROJECTS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .