| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-Finance VPO NAINIAHAN TEHSIL SHILLAI DISTT SIRMOUR HP | NAINIAHAN | SIRMOUR | HIMACHAL PRADESH | ₹19.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹20.0 L+₹24,616 (1.25%)Rejected-Finance | ₹20.0 L+₹24,616 (1.25%) | L2 | Rejected-Finance L2 |
| 3 | L3₹21.3 L+₹1.5 L (7.75%)Rejected-Finance | ₹21.3 L+₹1.5 L (7.75%) | L3 | Rejected-Finance L3 |
| 4 | L4₹21.3 L+₹1.6 L (7.86%)Rejected-Finance | ₹21.3 L+₹1.6 L (7.86%) | L4 | Rejected-Finance L4 |
| 5 | L5₹22.1 L+₹2.4 L (11.9%)Rejected-Finance | ₹22.1 L+₹2.4 L (11.9%) | L5 | Rejected-Finance L5 |
Tender Value
₹27.7 L
EMD Value
₹55,500
Closing Date
31 Aug 2026, 5:00 pmClosed
Er. Yogesh Sharma
Executive Engineer Division HPPWD Shillai
(SH- Construction of Two Rooms with Verandah on First Floor)
2026_PWD_141919_3
NIT 4219-4318 DATED 22.08.2026
Open Tender
Civil Works - Buildings
Percentage
60 days
Shillai
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹55,500
7 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
31 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in walls (any thickness) , including attached pilasters,buttresses, plinth & string courses, fillets, columns, pillars, piers, abutments, posts & struts etc. above plinth level upto floor five level, excluding cost of centring, shuttering, finishing & reinforcement in 1:1.5:3 ( One cement : one & half coarse sand : three graded stone aggregate 20 mm nominal size ), including all leads, lifts & carriage of materials & to the entire satisfaction of the Engineer-in-Charge. | 6.05 | Per Cubic Metre | 9,386.7 | ₹56,789.54 |
| 2 | Reinforced cement concrete in beams, suspended floors, roofs having slope upto 15 degree landing, balconies, shelves,Chajjas,Lintels,bands, plain windows sills, staircases & spiral cases above plinth level upto floor five level, excluding cost of centring, shuttering, finishing & reinforcement in 1:1.5:3 ( One cement : one & half coarse sand : three graded stone aggregate 20 mm nominal size ), including all leads & lifts & carriage of materials & to the entire satifaction of the Engineer-in-Charge. | 40.56 | Per Cubic Metre | 9,803.67 | ₹3,97,636.86 |
| 3 | Centring & shuttering including strutting, propping etc. & removal of form work for :- Foundations, footing, bases of columns, etc. for mass concrete, including all leads, lifts & carriage of materials & to the entire satisfaction of the Engineer-in-Charge . | 39.56 | Per Square Metre | 218.65 | ₹8,649.79 |
| 4 | Centring & shuttering including strutting, propping etc. & removal of form work for :-Suspended floors, roofs, landings, balconies & access platform, including all leads, lifts & carriage of materials & to the entire satisfaction of the Engineer-in-Charge. | 90.06 | Per Square Metre | 583.95 | ₹52,590.54 |
| 5 | Centring & shuttering including strutting, propping etc. & removal of form work for :-Lintels,beams, plinth beams, girders, bressumers & cantilevers, including all leads, lifts & carriage of materials & to the entire satisfaction of the Engineer-in-Charge. | 165.25 | Per Square Metre | 478.2 | ₹79,022.55 |
| 6 | Centring & shuttering including strutting, propping etc. & removal of form work for :-Columns, pillars, piers, Abutments, posts & struts, including all leads, lifts & carriage of materials & to the entire satisfaction of the Engineer-in-Charge . | 94.54 | Per Square Metre | 560.85 | ₹53,022.76 |
| 7 | Centring & shuttering including strutting, propping etc. & removal of form work for :-Edges of slabs & breaks in floors & wall under 20cm wide, including all leads, lifts & carriage of materials & to the entire satisfaction of the Engineer-in-Charge. | 48.42 | Per Runing Metre | 123.3 | ₹5,970.19 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position & binding all complete upto all floor level Thermo-Mechanically Treated bars of grade Fe-500 D or more including all leads,lifts & carriage of materials & to the entire satisfaction of the Engineer-in-Charge. | 4,963.5 | Per Kilogram | 104.75 | ₹5,19,926.63 |
| 9 | Brick work with common burnt clay F.P.S. ( Non-modular ) bricks of class designation 7.5 in foundation & plinth in cement mortar 1 : 6 ( One cement : Six coarse sand ), including all leads,lifts & carriage of materials & to the entire satisfaction of Engineer-in-Charge. | 17.99 | Per Cubic Metre | 7,044.9 | ₹1,26,737.75 |
| 10 | Brick work with common burnt clay F.P.S. ( Non-modular ) bricks of class designation 7.5 in super- structure above plinth level upto floor V level in cement mortar 1 : 6 ( One cement : six coarse sand ) including all leads,lifts & carriage of materials & to the entire satisfaction of Engineer-in-Charge. | 22.13 | Per Cubic Metre | 9,595.1 | ₹2,12,339.56 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
SBDGSSSNANIDHARjob3.pdf
Tender Documents • 3.11 MB
BOQ_210659.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .