Loading…
Loading…
Tender Value
₹94.1 L
EMD Value
₹1.9 L
Closing Date
30 Sept 2026, 11:00 am
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (WMS)
TENDERS
27 conditions · 5 needing a document upload
Contractor should have GST Registration and Certificate should be submitted along with tender. The Tenderer should be GST Compliant. No Bills will be acceptable without GST Registration, which is mandatory after starting of GST Implementation. Responsibility for remitting the GST lies with the Tenderer. This GST will be reimbursed on submission of proof of payment to the Government at prevailing rates for this work
The contractor should have PAN card, they should attach copy of PAN card
The contractor has to submit the certificates required as per Tender document in support of their legal authority to participate in the tender in favor of the individual to sign the tender on behalf of the tenderer and create liability against them
The tenderer should submit the copy of ANNEXURE-V online
The tenderer should submit the copy of ANNEXURE-VA (if Applicable)
The tenderer should submit the copy of an undertaking that the tenderer is notblacklisted or debarred by Railways or any other Ministry /Department of Govt.of India from participation in tender on the date of opening of bids [PDF file tobe uploaded].
The tenderer should submit the copy of filled up & duly signed PART-I, PART-II & PARTIII(A) of Tender Document [PDF file to be uploaded]
STATUTORY VARIATION CLAUSE: Any addition or variation of statutorytaxes, levies and duties after the date of opening of tender shall be paid to thecontractor after production of necessary document proof. Similarly benefit ofreduction/ abolition of duties, taxes or levies, if any, should be passed on toRailway.
The Tenderer shall have the Valid ESI& EPF registration. The copy of ESI &EPF registration shall submit along with their offer
If the Bid of a Tenderer is seriously unbalanced in relation to the Engineers estimate of the cost of work to be performed under the contract, the Railwaysmay require the tenderer to produce detailed price analysis for any or all itemsof the Tender Schedule, to demonstrate the internal consistency of thoseprices with the construction methods and schedule proposed.
The tender advertised value is inclusive of GST and all other taxes and duties/levies.
The tenderer should submit the copy of filled up & duly signed(NEFT)MANDATE FORM-NEW along with tender
The tenderer should submit the copy of an undertaking that the tenderer abide all special conditions of Tender (PART-III(B)) along with the tender documents [PDF file to be uploaded].
The tenderer has to submit documents along with tender (as Applicable) as per clause no. 14 of Tender form (Second Sheet) of tender document
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. Hard copy may be perused in the office of the Chief Administrative Officer/ Construction/ South Coast Railway / Visakhapatnam- 530003 In submitting his tender it would be deemed that the tenderer has kept himself fully Informed of the provision of the IRS General conditions of Contract including all corrections and Amendments issued up to date and claim that he is not aware of any amendment or correction slip to the IRS GCC shall not be entertained.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through www.ireps.gov.in [II] Prospective Bidders shall keep watch for CORRIGENDUM upto 15 days prior to the deadline for submission of bids. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer. [III]To give prospective bidders a reasonable time on account of CORRIGENDUM in preparing their bids, the Railways may at their discretion extend as necessary, the deadline for submission of Tender document. Railways decision will be final and no correspondence will be entertained from prospective bidders.
Comprehensive Annual Maintenance Contract of 500 Ton Hydraulic Wheel Press (Make: BBM) at Carriage Repair Shop, Tirupati for a period of Five years
04-MNP-WHEELPRESS-26-27~SCOR
04-MNP-WHEELPRESS-26-27
Single
Works - General
60 Months
Tirupati, Andhra Pradesh
₹0
₹1.9 L
8 Sept 2026
8 Sept 2026
16 Sept 2026
5 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Quarterly maintenance of Comprehensive Annual Maintenance Contract of 500 Ton Hydraulic Wheel Press for 1st year (as per quarterly scope of work) (Work done in each quarter will be treated as one unit) | — | 4.00 | — | — | |
| Quarterly maintenance of Comprehensive Annual Maintenance Contract of 500 Ton Hydraulic Wheel Press for 2nd year (as per quarterly scope of work) (Work done in each quarter will be treated as one unit) | — | 4.00 | — | — | |
| Quarterly maintenance of Comprehensive Annual Maintenance Contract of 500 Ton Hydraulic Wheel Press for 3rd year (as per quarterly scope of work) (Work done in each quarter will be treated as one unit) | — | 4.00 | — | — | |
| Quarterly maintenance of Comprehensive Annual Maintenance Contract of 500 Ton Hydraulic Wheel Press for 4th year (as per quarterly scope of work) (Work done in each quarter will be treated as one unit) | — | 4.00 | — | — | |
| Quarterly maintenance of Comprehensive Annual Maintenance Contract of 500 Ton Hydraulic Wheel Press for 5th year (as per quarterly scope of work) (Work done in each quarter will be treated as one unit) | — | 4.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
WheelPressFinalTS-IREPS.pdf TENDER SCHEDULE
ATTACHMENT
WheelPressFinalTS-IREPS.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .