Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-AOC 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹26.4 L+₹25,623.70 (0.98%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L2 | Rejected-Finance higher than L1 | |
| 3 | L3₹26.5 L+₹33,370.40 (1.28%)Rejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L3 | Rejected-Finance higher than L1 |
Tender Value
Refer Docs
EMD Value
₹54,000
Closing Date
9 Nov 2024, 12:00 pmClosed
EXECUTIVE ENGINEER
UTL BLDG, BESIDE DPS, NEW TOWN, KOL-156
Comprehensive Annual maintenance of Ductable Package AC Units, VRF Units and Cooling Towers at Janaswasthya Karigari Bhavan (Nijalaya) under NTKMD, PHE Dte.
2024_PHED_762013_3
PHE/NTKMD/e-14 of 2024-25
Open Tender
Project Work
Item Wise
365 days
WORK
Please refer Tender documents.
4 documents required · 4 mandatory
₹54,000
9 Dec 2024
5 Oct 2024
11 Nov 2024
5 Oct 2024
9 Nov 2024
5 Oct 2024
Amount
Comprehensive maintenance service of Ductable Spilt Water Cooled Package AC Units of Cumulative Capacity 461.5 TR of Voltas made as per the scope of work mentioned below : i) 17 TR Ductable Package AC Units (Model : DPUWSC170CDR407) --- 21 nos. ii) 11 TR Ductable Package AC Units (Model : DPUWSC110 --- 5 nos. iii) 5.5 TR Ductable Package AC Units (Model : DPUWSC55) --- 9 nos. [ w.e.f NOV'2024 to OCT'2025]
Comprehensive maintenance service of VRF AC Units of Cumulative Capacity 10 HP of Voltas made as per the scope of work mentioned below : i) 5 HP VRF Air-Conditioning Units (Model : VXV-H140/NR1) --- 2 nos. [ w.e.f NOV'2024 to OCT'2025]
Comprehensive maintenance service of Paharpur made Cooling Towers as per the scope of work mentioned below : i) 1900 USGPM Cooling Towers --- 2 nos. [ w.e.f NOV'2024 to OCT'2025]
Scope of work 1) Thorough checking and servicing the air-conditioning plant / unit quarterly. 2) Attending the plant when called upon by you. (as & when required) 3) Cleaning of air-filters once in every three month. 4) Cleaning the evaporator & condenser coils once or twice in a yr. as necessary. 5) Repairing / overhauling the components of the equipment at site / in authorised service station including replacement of worn out parts when found necessary. 6) Replenishing refrigerant required as a result of leak in system arising out of wear & tear. 7) Repair / replacement of microprocessor controls as per need of site. 8) Lubricating the bearings of motor & fans when found necessary. 9) Checking the refrigerant system and adjusting settings & controls as per requirement. 10) Replacement of compressor for failure due to normal wear & tear. 11) Checking motor and starters, checking the operation of controls, adjusting as per requirement. 12) Taking a set of working parameter readings of the units to understand the healthiness of the system and suggesting improvements if any. 13) All the electrical panels related to AC units including VFD & Cooling Towers are included in the scope of Voltas.
GST @18% of Total Value in Amount
CESS @1% of Total Value in Amount
B T PROJECTS PRIVATE LIMITED (BID ID -5734823)
WEST BENGAL ENGINEERING CO. (BID ID -5733642)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .