Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Individual L1 |
|---|---|---|---|---|
| 1.00parapet work | ||||
| 1.00 | OD23314/2025-2026:Engaging laborers for demolishing old damaged parapet and also for removal of rubbish, grass, brush wood, trees and saplings etc from the structures up to a distance of 50 m outside the thodu etc. complete as per instruction of engineers at site | 30 | no | 1,114.76 ₹33,442.8 Lowest |
| 1.00 | OD23324/2025-2026:Removing the collapsed and fallen parapet parts from thodu and dumping it on contractor chosen place without causing hazard to environment | 1 | Day | 14,258.54 ₹14,258.54 Lowest |
| 1.00 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 201 | kg | 232.81 ₹46,794.81 Lowest |
| 1.00 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 12.36 | kilogram | 120.2 ₹1,486.15 Lowest |
| 1.00 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 0.66 | cum | 10,054.73 ₹6,636.12 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 8.92 | sqm | 397.78 ₹3,548.2 Lowest |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 49.29 | cum | 265.38 ₹13,081.64 Lowest |
Tender Value
₹1.1 L
EMD Value
₹2,723
Closing Date
10 Sept 2025, 6:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, Minor Irrigation Subdivision, Manjeshwar - 671323
GENERAL-Monsson Preparedness 2025- VCB in Perla- Soorambyil road-Reconstruction of parapet to VCB cum Bridge in Enmakaje GP in Kasaragod District-General Civil Work
2025_Irrig_787753_2
IRR/IA/TR/5607/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
30 days
Perla Swarga
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,723
Yes
14 Nov 2025
29 Aug 2025
12 Sept 2025
29 Aug 2025
10 Sept 2025
29 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1307566.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .