Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.3 CrAccepted-AOC 419 AAPKA BAZAR GURGAON HARYANA 122001 | GURGAON | GURGAON | HARYANA | 122001 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹85.2 Cr+₹17.0 Cr (24.8%)Rejected-AOC ENKAY TOWN PLAZA B I BLOCK PALAM VIHAR GURUGRAM HR 122017 | GURUGRAM | GURUGRAM | HARYANA | 122017 | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹76.5 Cr
EMD Value
₹1.0 Cr
Closing Date
27 Mar 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGM (E-C),CHQ-NER
O/o Executive Director Engg ER AND NER, CHQ NER, 2nd Floor, NATS Complex AAI, New Delhi 110037
RE CARPETING OF RUNWAY TAXIWAYS GRADING OF OPERATIONAL AREA DEVELOPMENT OF DRAINAGE SYSTEM AND ASSOCIATED WORKS CIVIL AND ELECTRICAL AT MBB AIRPORT AGARTALA
2023_AAI_147392_1
CHQ/NER/ENGG/AGARTALA/22-23/01
Open Tender
Construction Works
Item Rate
450 days
AGARTALA
AS PER TENDER DOCUMENTS
4 documents required · 4 mandatory
₹11,800
₹1.0 Cr
Yes
14 Jul 2025
3 Mar 2023
5 Apr 2023
4 Mar 2023
27 Mar 2023
21 Mar 2023
4 Mar 2023 - 13 Mar 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 2,510 | Cum | - | - |
| 2 | Supply and filling selected earth obtained from approved external sources (excluding rock) including royalty in layers not exceeding 20 cm in depth breaking clods, watering and consolidation of each layer by roller and rolling every third and top most layer with power roller of minimum 8 tonnes and dressing up in embankments or roads plinth filling or filling of ground depressions including of all leads and lifts to meet requirement of table 300 - 2 of Morth (refer Morth specification section - 305) | 35,165 | Cum | - | - |
| 3 | Excavation of soil using hydraulic excavator of 0.90cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and disposed of the excavated earth, transporting to the embankment location including loading and unloading with all lifts and leads within airport premises excluding the survey work as per direction of Engineer-in-charge (ref. MORTH Specification section-301) | 4,58,835 | Cum | - | - |
| 4 | Construction of embankment with available excavated earth deposited at site from other locations with spreading, neatly leveling/ grading and compacting layer by layer to achieve the desired levels and compactions to meet the requirement of table 300-2 of MORTH specification etc. complete in all respects excluding the survey work as per direction of Engineer-in-Charge.(ref. MORTH Specification section-305) | 4,55,515 | Cum | - | - |
| 5 | Carrying out Topographical and contour surveying, traversing , contouring & coordinating all permanent and semi-permanent feature by Total station survey instrument and Auto Level as required including mobilization and demobilization of the survey team after completion of survey work at Airport premises of operational area and newly acquired in different plots as per direction of the Engineer in-charge. The following steps shall be taken up:
i) Carrying out site survey and taking reduced level 3m x 3m grid.
ii) Submission of sets of contour map in suitable scale and size with marking import ants (3 (three) nos. coloured hard copies & 1(one)soft copy.
iii) Submission of level sheet in Excel format (Hard copy & soft copy) with quantity calculation for cutting & filling earth as per the gradient which shall be decided by the Engineer in charge.
iv) The requisite all survey works for execution of earthwork, quantity work out for Running/Final Bill shall also be included in the scope of survey work. | 480 | Acres | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering (a) All work up to plinth level (i) 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 1,090 | Cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering (a) All work up to plinth level (i) 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 40 mm nominal size) | 105 | Cum | - | - |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced Cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. (a) All works upto plinth level (i) Concrete of M25 grade with minimum cement content of 330 kg /cum | 3,350 | Cum | - | - |
| 9 | Add for using extra cement in the items of design mix over and above the specified cement content therein. | 2,033 | Quintal | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 3,485 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_161627.xls
BOQ Document • 0.33 MB
116167585.pdf
Tender Document • 0.24 MB
Tenderdocument.pdf
Tender Document • 19.20 MB
116167587.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .