Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.5 Laccepted-aoc | ₹7.5 L | accepted-aoc |
Tender Value
₹7.5 L
EMD Value
₹7,600
Closing Date
27 Jul 2026, 4:00 pmClosed
Executive Engineer, RWS & S Division,Guntur
Guntur
Augmentation of PWS Scheme in Namburu Village of Pedakakani Mandal of Est.Cost Rs.10.00 Lakhs
960121
11 ZPGF 15th Finance Tide (DW) 2026-27 EE RWS S Guntur
OPEN - NCB
Water Supply
GUNTUR, ANDHRA PRADESH
8 documents required · 8 mandatory
₹267
₹7,600
1 Sept 2026
11 Jul 2026
11 Jul 2026
Supply and delivery of 110mm dia HDPE 6 Kg.cm2 Pipe line as per IS 4984/2016 including cost, conveyance for 1.00 Rmt , the rate including overheads and contractor's profit @13.615%
Supply and delivery of 75mm dia HDPE 6 Kg.cm2 Pipe line as per IS 4984/2016 including cost, conveyance for 1.00 Rmt , the rate including overheads and contractor's profit @13.615%
Earth work excavation for Pipe line trenches 110mm dia HDPE 6kg /cm2 (2/3 machinery and 1/3 manual ) in all soils except rocky soils including lowering , laying and jointing of pipes with required fittings /specials true to alignment and gradient, refilling with already excavated earth, watering ,tamping and removing surplus earth and testing to required hydraulic test pressure etc.complete excluding cost of specials/fittings for finished item of work The rate is inclusive of cost of overheads and contractors profit @13.615% .
Earth work excavation for Pipe line trenches 75mm dia HDPE 6kg /cm2 (2/3 machinery and 1/3 manual ) in all soils except rocky soils including lowering , laying and jointing of pipes with required fittings /specials true to alignment and gradient, refilling with already excavated earth, watering ,tamping and removing surplus earth and testing to required hydraulic test pressure etc.complete excluding cost of specials/fittings for finished item of work The rate is inclusive of cost of overheads and contractors profit @13.615% .
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including overheads and contractors profit @13.615%
Filling the Foundation with sand including cost,conveyance ,watering and ramming etc complete. The rate is including overheads and contractors profit @13.615%
CC (1:4:8) mix using 40 mm HBG metal including cost and conveyance of all material etc complete . The rate is inclusive of overheads and contractors profit @13.615%
Vibrated Cement concrete (1:1.5:3) using 20mm HBG metal including cost and conveyance of all material and labour charges,excluding cost of the steel including overhead& contractor's profit @13.615% for column footing
Vibrated Cement concrete (1:1.5:3) using 20mm HBG metal including cost and conveyance of all material and labour charges,excluding cost of the steel including overhead& contractor's profit @13.615% for columns
Vibrated Cement concrete (1:1.5:3) using 20mm HBG metal including cost and conveyance of all material and labour charges,excluding cost of the steel including overhead& contractor's profit @13.615% for beams
Brick masonry with CM (1:6) using second class bricks including cost and conveyance of all the mareial and labour charges etc. The rate is including over heads & contractor's profit @13.615%
Vibrated Cement concrete (1:1.5:3) using 20mm HBG metal including cost and conveyance of all material and labour charges,excluding cost of the steel including overhead& contractor's profit @13.615% for bed blocks
Vibrated Cement concrete (1:1.5:3) using 20mm HBG metal including cost and conveyance of all material and labour charges,excluding cost of the steel including overhead& contractor's profit @13.615% for Lintel beam
Vibrated Cement concrete (1:1.5:3) using 20mm HBG metal for sun shades of size 75mm thick at one end 50mm other end and 600 mm width including cost and conveyance of all material and labour charges,excluding cost of the steel including overhead& contractor's profit @13.615% for sun shades
Vibrated Cement concrete (1:1.5:3) using 20mm HBG metal including cost and conveyance of all material and labour charges,excluding cost of the steel including overhead& contractor's profit @13.615% for roof slab of 150mm thick
Brick masonry with CM (1:6) using second class bricks including cost and conveyance of all the mareial and labour charges etc. The rate is including over heads & contractor's profit @13.615%
Flush pointing with CM (1:3) including cost and conveyance of all materials & labour charges etc. the rate is including overheads & contracto's profit @ 13.615%
Cement plastering with CM (1:5) 12mm thick including cost and conveyance of all material and labour charges etc complete . The rate is including overheads & contractor's profit @13.615%
Acco proof plastering with CM (1:5) 12mm thick including cost and conveyance of all material and labour charges etc complete . The rate is including overheads & contractor's profit @13.615%
Flooring with CC (1:4:8) using 40mm HBG metal for 100mm thick and top plastering with CM (1:3) ,20mm thick including cost and conveyance of all material and labour charges etc complete . The rate is including overheads & contractor's profit @13.615%
Synthetic Enamel painting in two coats over primary coat including cost and conveyance of all material and labour charges etc complete. The rate is including overheads and contractor's profit @13.615%
Painting with white cement two coats including cost and conveyance of all material and labour charges etc complete for inside ceiling.The rate is including overheads & contrctor's profit @13.615%
Snowcem painting including cost and conveyance of all material and labour charges etc complete for outside . The rate is including overheads & contractor's profit @13.615%
Providing High Yield Deformed (HYSD) /Thermo Mechanically Treated (TMT) /Mild Steel (MS) steel bars(Fe 500 grade as per ISI 1786-1979 )of difference diameters for RCC works,including labour charges for straightening, cutting, bending to required sizes and sapers, placing in position with cover bolcks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental ,operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all mterials etc,.completd for finished item of work in all floors ( APSS No 126 ) etc complete including over heads and contractors profit @ 13.615%. FE-500
Total Number of item Twenty four (24) only
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Namburu Schedule - Rs 10.00 Lakhs.xlsx
TENDER_DOCUMENT • 0.06 MB
NIT Vol - I-Namburu.doc
TENDER_DOCUMENT • 0.17 MB
NITVol -II-Namburu.doc
TENDER_DOCUMENT • 0.14 MB
Ponnuru AS.pdf
TENDER_DOCUMENT • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .