| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹4.0 L+₹49,210.70 (14.1%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹4.1 L+₹57,479.50 (16.4%)Accepted-Finance | L3 | Accepted-Finance Accepted |
Tender Value
₹3.6 L
EMD Value
₹7,281
Closing Date
9 Jan 2025, 3:00 pmClosed
EE-II Works SVPMC
EE-II Works SVPMC
Heightening of existing drain from culvert to Shri Sheikh Habib at Mazar Pahad Nariyal Bagicha Ward No.11
2025_PMBC_17073_1
18/EE-II/WKS/MC/2024-25
Open Tender
Construction Works
Works
90 days
Mazar Pahad Ward No 11
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹7,281
10 Jan 2025
2 Jan 2025
9 Jan 2025
2 Jan 2025
9 Jan 2025
2 Jan 2025
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Centering and shuttering including strutting, propping etc. and removal of form for a) Walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : a)1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. a) Thermo-Mechanically Treated bars of grade Fe-500D or more
Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derivedfrom natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
12 mm cement plaster of mix : a) 1:4 (1 cement: 4 fine sand)
M/s Rakib Construction (BID ID -50337)
SALAMAT (BID ID -50342)
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .