| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | L1 | Accepted-Finance L1 | |
| 2 | L2₹6.9 L+₹7,934.27 (1.17%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.0 L+₹22,097.11 (3.25%)Rejected-Finance VILLAGE KHURAHAL PO DHAWAL TEHSIL SUNDER NAGAR DISTT MANDI HP | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Mahender Singh L3 | Shivani Thakur L2 | Rajesh Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work lift up to 1.5 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick jumper work. | 58.2 | cum | 399 ₹23,221.8 Lowest | 410 ₹23,862 | 400 ₹23,280 |
| 2.00 | Providing and laying cement concrete 1:6:12 (1cement:6 sand:12graded stone agg.40mm nominal size)and curing complete excluding cost of form work in foundation and plinth.COMPLETE IN ALL RESPECT AS PER THE DIRECTION & TO THE ENTIRE SATISFACTION OF THE ENGINEER-IN-CHARGE. | 2.91 | cum | 6,530 ₹19,002.3 | 6,500 ₹18,915 Lowest | 6,500 ₹18,915 Lowest |
| 3.00 | Prov. Form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring , shuttering, strutting & propping etc. with wooden battens & ballies , height of propping & centring below supporting floor to ceiling not exceeding 4 mtrs.& removal of the same for insitu reinforced concrete & plain concrete work in : I)Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses and the like :COMPLETE IN ALL RESPECT AS PER THE DIRECTION & TO THE ENTIRE SATISFACTION OF THE ENGINEER-IN-CHARGE. | 118.58 | Sqm | 450 ₹53,361 | 399 ₹47,313.42 Lowest | 400 ₹47,432 |
| 4.00 | Providing and laying cement concrete 1:5:10 (1Cement:5Sand:10 graded stone aggregate, 40 mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually be 150mm to 300 mm as per HP.PWD specifications. | 57.7 | cum | 6,210 ₹3,58,317 | 6,100 ₹3,51,970 | 6,000 ₹3,46,200 Lowest |
| 5.00 | Providing and laying cement concrete work 1:1 ½ :3 (1 Cement :1 ½ Sand : 3 graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :- In foundations and plinth with in all leads and lifts as per directions of Engineer-in-charge. | 20.01 | cum | 9,551 ₹1,91,115.51 | 9,555 ₹1,91,195.55 | 9,500 ₹1,90,095 Lowest |
| 6.00 | Providing ,Laying tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete including the cost of binding wire in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 600.3 | Kg | 95 ₹57,028.5 | 91 ₹54,627.3 | 90 ₹54,027 Lowest |
Tender Value
₹5.9 L
EMD Value
₹11,872
Closing Date
19 Nov 2025, 5:00 pmClosed
EE Jal Shakti Division Larji
EE Jal Shakti Division Larji
(SH- C/O Retaining wall plum concrete 1 5 10 to protection for existing structure and pump house Raulbehar) Under PDNA
2025_HPIPH_120197_11
NIT No. 9170-9269 dt. 11.11.2025
Open Tender
Civil Works
Item Rate
60 days
Bhunter
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE Jal Shakti Division Larji
₹11,872
28 Nov 2025
12 Nov 2025
20 Nov 2025
12 Nov 2025
19 Nov 2025
12 Nov 2025
Amount
Excavation in foundation trenches etc. in earth work lift up to 1.5 mtrs. Stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick jumper work.
Providing and laying cement concrete 1:6:12 (1cement:6 sand:12graded stone agg.40mm nominal size)and curing complete excluding cost of form work in foundation and plinth.COMPLETE IN ALL RESPECT AS PER THE DIRECTION & TO THE ENTIRE SATISFACTION OF THE ENGINEER-IN-CHARGE.
Prov. Form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring , shuttering, strutting & propping etc. with wooden battens & ballies , height of propping & centring below supporting floor to ceiling not exceeding 4 mtrs.& removal of the same for insitu reinforced concrete & plain concrete work in : I)Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses and the like :COMPLETE IN ALL RESPECT AS PER THE DIRECTION & TO THE ENTIRE SATISFACTION OF THE ENGINEER-IN-CHARGE.
Providing and laying cement concrete 1:5:10 (1Cement:5Sand:10 graded stone aggregate, 40 mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually be 150mm to 300 mm as per HP.PWD specifications.
Providing and laying cement concrete work 1:1 ½ :3 (1 Cement :1 ½ Sand : 3 graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :- In foundations and plinth with in all leads and lifts as per directions of Engineer-in-charge.
Providing ,Laying tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete including the cost of binding wire in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge
Shivani Thakur (BID ID -582189)
Mahender Singh (BID ID -582192)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Form8.pdf
Tender Documents • 1.43 MB
Terms.pdf
Tender Documents • 0.35 MB
BOQ_176073.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .