Loading…
Loading…
Tender Value
₹6.3 Cr
EMD Value
₹6.3 L
Closing Date
14 Oct 2026, 6:00 pm
Municipal Commissioner, Ahmedabad.
DESIGN AND SITC OF ODOUR REMOVALS FOR H2S AMMONIA, VOLATILE ORGANIC COMPOUND, ACTIVATED CARBON ETC. AND TEN YEARS OF OPERATION & COMPREHENSIVE MAINTENANCE FOR VASTRAL SPS OF AHMEDABAD MUNICIPAL CORPORATION (AMC).
347587
2026-27
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹12,000
Municipal Commissioner, Ahmedabad
₹6.3 L
22 Sept 2026
22 Sept 2026
22 Sept 2026
14 Oct 2026
22 Sept 2026
estimated cost, as mentioned above. Amount of my / our tender works out for Rs. ________________ (in figures)
Estimated amount put to tender Rs. Estimated amount put to tender Rs.
Signature of Contractor
Company’s seal :
SUMMARY OF COST
Name Design and SITC of Odour Removals for H2S Ammonia, Volatile
of Organic Compound, Activated Carbon etc. and Ten Years of
Work Operation & Comprehensive Maintenance for Vastral SPS of
Ahmedabad Municipal Corporation (AMC).
A. ODOUR CONTROL CAPITAL COST WORK
B. OPERATION & MAINTENANCE WORK
TOTAL ESTIMATE OF CAPITAL WORK WITH
TEN YEARS OF O&M (A+B) (WITHOUT GST)
Name Design and SITC of Odour Removals for H2S Ammonia, Volatile Organic Compound,
of Activated Carbon etc. and Ten Years of Operation & Comprehensive Maintenance for Vastral
Work: SPS of Ahmedabad Municipal Corporation (AMC).
ODOUR CONTROL SYSTEM WORK
Amount Total Amount
Amount Total Amount
Sr. No. Items Description Unit Qty.
ODOUR CONTROL SYSTEM - FOR SPS
SITC of Two Stage Odour Control System for
SPS of min. capacity as specified below and
inlcuding all GRP/FRP covers at top of SPS units
(sump/wetwell, screen chamber, inlet chamber
,etc.) and GRP/FRP ducts/piping for drawing air
from SPS units upto odour control system for
1 required treatment, all required other piping, Nos. 1 4,27,74,507.00
accessories, for sewage having average 100 ppm
concentration H2S, designed to handle airflow
with outlet parameter guaranteed for less than
ppm and shall be provided as per Specifications
& any other as required to complete the work in
all respects for satisfactory installation and
operation of Odour Control System.
Minimum Design Airflow Rate- 20,500 m3/h
TOTAL ESTIMATE OF ODOUR SYSTEM WORK (WITHOUT GST)
AHMEDABAD MUNICIPAL CORPORATION (AMC)
STP DEPARTMENT (S O E&M)
ESTIMATE: OPERATION & MAINTENANCE
Name Design and SITC of Odour Removals for H2S Ammonia, Volatile Organic Compound,
of Activated Carbon etc. and Ten Years of Operation & Comprehensive Maintenance for
Work: Vastral SPS of Ahmedabad Municipal Corporation (AMC).
Item Item of Work Dura Unit Rate Per Amount per
No. - Month in Year
tion Rs. in Rs.
1.1.1 The works of this schedule comprises of the 12 Months 59,220.00
supply of all spare parts as required
including the supply of all labour (including
reliever to ensure presence of specified type
and no. of manpower per shift), materials,
consumables ( except electrical power ),
equipment, tools and tackles and
comprehensive operations, repair and
maintenance of Odour Control System in
AT VASTRAL SPS during the Ten Year
of O&M period from the date of successful
Total Staff salary for O&M period (of
months) for Operation, security, repairing
and maintenance for the complete O&M
a) Technician cum operator- (ITI-
Wireman/Electrician/Fitter/ Experience
(3nos - One for each shift of 8 hours.)
1.1.2 During Second Year: 12 Months 65,142.00
Total of Manpower, Operator as above
1.1.3 During Third Year: 12 Months 71,657.00
Total of Manpower, Operator as above
1.1.4 During Fourth Year: 12 Months 78,823.00
Total of Manpower, Operator as above
1.1.5 During Fifth Year: 12 Months 86,706.00
Total of Manpower, Operator as above
1.1.6 During Sixth Year: 12 Months 95,377.00
Total of Manpower, Operator as above
1.1.7 During Seventh Year: 12 Months 1,04,915.00
Total of Manpower, Operator as above
1.1.8 During Eighth Year: 12 Months 1,15,407.00
Total of Manpower, Operator as above
1.1.9 During Ninth Year: 12 Months 1,26,948.00
Total of Manpower, Operator as above
1.1.10 During Tenth Year: 12 Months 1,39,643.00
Total of Manpower, Operator as above
2 Comprehensive Maintenance
2.1.1 Comprehensive repairing, spares and 12 Months - -
maintenance of entire works alongwith
administration & managements charges
including running office, cost of lubricants,
consumables, spares, tools, statutory
periodical approvals & testing of
equipments etc. required in all except
supply of elect. power and sewage during
O&M period for First Year of O&M period.
2.1.2 Total of Comprehensive Maintenance, 12 Months 53,587.00
repairing, Spares, Consumables etc. for
2.1.3 Total of Comprehensive Maintenance, 12 Months 58,946.00
repairing, Spares, Consumables etc. for
2.1.4 Total of Comprehensive Maintenance, 12 Months 64,841.00
repairing, Spares, Consumables etc. for
2.1.5 Total of Comprehensive Maintenance, 12 Months 71,326.00
repairing, Spares, Consumables etc. For
2.1.6 Total of Comprehensive Maintenance, 12 Months 78,459.00
repairing, Spares, Consumables etc. for
2.1.7 Total of Comprehensive Maintenance, 12 Months 86,305.00
repairing, Spares, Consumables etc. for
2.1.8 Total of Comprehensive Maintenance, 12 Months 94,936.00
repairing, Spares, Consumables etc. for
2.1.9 Total of Comprehensive Maintenance, 12 Months 1,04,430.00
repairing, Spares, Consumables etc. for
2.1.10 Total of Comprehensive Maintenance, 12 Months 1,14,876.67
repairing, Spares, Consumables etc. for
TOTAL O&M WORK COST FOR 10 YEARS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. Technical Specification.pdf
02. Financial Bid - Vastral SPS.pdf
03. Tender Drawings- Vastral SPS.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .