Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.4 LAccepted-AOC | L1 | Accepted-AOC SINGLE IN RETENDER |
| Sl No | Description | Qty | Unit | IRSHAD C.A L1 |
|---|---|---|---|---|
| 1.00Building Proper | ||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 2.43 | cum | 3,554.76 ₹8,623.85 Lowest |
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 52 | sqm | 165.08 ₹8,584.16 Lowest |
| 1.00 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 128.2 | kg | 5.66 ₹725.61 Lowest |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 26.16 | cum | 2,061.9 ₹53,945.49 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 123.12 | sqm | 976.38 ₹1,20,211.91 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 189.46 | sqm | 738.54 ₹1,39,922.31 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 238.07 | sqm | 930.58 ₹2,21,547.83 Lowest |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 50.47 | sqm | 989.34 ₹49,931.99 Lowest |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 71.3 | metre | 220.85 ₹15,746.61 Lowest |
Tender Value
₹59.3 L
EMD Value
₹50,000
Closing Date
17 Mar 2026, 3:00 pmClosed
Executive Engineer
D Building Division Alappuzha
Re Tender LAC ADS B Ed College Kerala University College of Teacher Education Kunnam Construction of New Building for Kerala University College of Teacher Education, Kunnam Phase 1 General Civil Work
2026_PWD_840431_2
PWD/BLDG/TR/9450/2023_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
360 days
Alappuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
7 Sept 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building Proper | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 2.43 | cum | - | - |
| 1.002 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 52 | sqm | - | - |
| 1.003 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 128.2 | kg | - | - |
| 1.004 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 26.16 | cum | - | - |
| 1.005 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 123.12 | sqm | - | - |
| 1.006 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 189.46 | sqm | - | - |
| 1.007 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 238.08 | sqm | - | - |
| 1.008 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 50.47 | sqm | - | - |
| 1.009 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 71.3 | metre | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1430259.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
pre.pdf
Tender Documents • 0.26 MB
affi.pdf
Tender Documents • 0.02 MB
epay.pdf
Tender Documents • 0.14 MB
SBDCOLLEGE.pdf
Tender Documents • 3.30 MB
BOQ_1430259.xls
BOQ • 0.35 MB
FormOfTender.pdf
Other Document • 0.56 MB
NITCOLLEGE.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .