| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53,325.40Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹59,035+₹5,709.60 (10.7%)Accepted-AOC | L2 | Accepted-AOC L2 | |
| 3 | L3₹60,866.80+₹7,541.40 (14.1%)Accepted-AOC | L3 | Accepted-AOC L3 | |
| 4 | L4₹66,819.30+₹13,493.90 (25.3%)Accepted-AOC | L4 | Accepted-AOC L4 |
| Sl No | Description | Qty | Unit | Saju K P L3 | Sumesh M.S L4 | GOGIL KRISHNAN L1 | SYAM SANKER L2 |
|---|---|---|---|---|---|---|---|
| 1.00Disconnection of public tap | |||||||
| 1.00 | 100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | 6 | Disconnection | 948.55 ₹5,691.3 | 1,041.32 ₹6,247.92 | 850 ₹5,100 Lowest | 900 ₹5,400 |
| 1.00 | 100.51.2:Disconnecting water connection from service mains along Concrete road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | 35 | Disconnection | 973.7 ₹34,079.5 | 1,068.92 ₹37,412.2 | 850 ₹29,750 Lowest | 900 ₹31,500 |
| 1.00 | 100.51.3:Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | 15 | Disconnection | 966.88 ₹14,503.2 | 1,061.44 ₹15,921.6 | 950 ₹14,250 Lowest | 950 ₹14,250 Lowest |
| 2.00New public tap connection | |||||||
| 2.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | 0.15 | cum | 1,048.49 ₹157.27 Lowest | 1,151.03 ₹172.65 | 2,000 ₹300 | 1,200 ₹180 |
| 2.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.09 | cum | 5,658.27 ₹509.24 Lowest | 6,211.66 ₹559.05 | 8,060 ₹725.4 | 6,500 ₹585 |
| 2.00 | OD174591/2023-2024:Providing 20mm (3/4 inch) connection from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5m using 25mm ( 3/4 inch ) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges,including the cost of 15mm PVC Tap using 25mm Indian Standard Class 6 uPVC pipes and specials. | 1 | no | 5,809.27 ₹5,809.27 | 6,377.43 ₹6,377.43 | 2,000 ₹2,000 Lowest | 7,000 ₹7,000 |
| 2.00 | OD174621/2023-2024:Providing vertical stand post using 63mm 6kg PVC pipe for FHTC's including cutting, filling, available earth/sand and fixing position etc. including necessary earth work excavation for fixing stand post etc. as per direction | 1 | no | 117.02 ₹117.02 Lowest | 128.45 ₹128.45 | 1,200 ₹1,200 | 120 ₹120 |
Tender Value
₹74,227
EMD Value
₹1,856
Closing Date
3 Jan 2025, 2:00 pmClosed
Assistant Executive Engineer
KWA AEE, PTA Sub Division
DEPOSIT-Public Tap disconnection-Kodumon Grama Panchayat - Disconnecting public tap connections.-Pipeline Work
2024_KWA_719735_1
22/2024-25/AEE/PH/PTA
Open Tender
Civil Works - Water Works
Item Rate
120 days
Pathanamthitta
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹1,856
21 Aug 2025
24 Dec 2024
4 Jan 2025
24 Dec 2024
3 Jan 2025
24 Dec 2024
Amount
Disconnection of public tap
100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.51.2:Disconnecting water connection from service mains along Concrete road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.51.3:Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
New public tap connection
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD174591/2023-2024:Providing 20mm (3/4 inch) connection from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5m using 25mm ( 3/4 inch ) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges,including the cost of 15mm PVC Tap using 25mm Indian Standard Class 6 uPVC pipes and specials.
OD174621/2023-2024:Providing vertical stand post using 63mm 6kg PVC pipe for FHTC's including cutting, filling, available earth/sand and fixing position etc. including necessary earth work excavation for fixing stand post etc. as per direction
SYAM SANKER (BID ID -2046141)
Saju K P (BID ID -2045007)
Sumesh M.S (BID ID -2045892)
Bidder Name
Saju K P
GOGIL KRISHNAN
SYAM SANKER
Sumesh M.S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .