| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹26.6 L+₹7.8 L (41.7%)Rejected-Finance | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹28.2 L+₹9.4 L (50.3%)Rejected-Finance | L3 | Rejected-Finance Being not L1 | |
| 4 | L4₹30.2 L+₹11.4 L (60.7%)Rejected-Finance D NO 38 39 86 3 4 SAIKRUPA RESIDENCY 104 AREA BAPUJI NAGAR MARRIPALEM VISAKHAPATNAM 530 007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | L4 | Rejected-Finance Being not L1 | |
| 5 | L5₹32.6 L+₹13.8 L (73.2%)Rejected-Finance D NO 35 14 13 1 R P PETA KANCHARAPALEM VISAKHAPATNAM 530 008 | VISAKHAPATANAM | ANDHRA PRADESH | 530008 | L5 | Rejected-Finance Being not L1 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
15 Mar 2021, 6:00 pmClosed
Garrison Engineer Utility-I Visakhapatnam
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
REPAIRS AND DEHYDRATION OF TRANSFORMERS OF VARIOUS CAPACITY AND REPAIR MAINT OF EARTHING / LIGHTENING CONDUCTORS OF VARIOUS POCKETS OF DOLPHIN HILL AREA UNDER AGE E/M NO - I GE (U-I) VISAKHAPATNAM
2021_MES_422647_1
8288/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Garrison Engineer Utility-I Visakhapatnam
CLASS D
9 documents required · 9 mandatory
₹500
Garrison Engineer Utility-I
₹98,000
Yes
17 Apr 2021
16 Feb 2021
16 Mar 2021
16 Feb 2021
15 Mar 2021
2 Mar 2021
Amount
M & L for shifting Transformer of capacity 200 KVA ~ 750KVA from its position at any substation at Dolphin Hill under AGE EM -I using cranes after disconnecting all the cables from HV/LV sides, securing the cable ends properly by insulating covering material, detaching all the earthing connections, transporting it to workshop for repair and transporting it back to the substation at Dolphin Hill and re-instating the transformer including all the cable connection, earthing connection , after doing insulation resistance test and restoring the electric supply as before all complete as specified and directed.
M & L for shifting Transformer/RMU Unit of any capcity from its position at any substation at Dolphin Hill under AGE EM -I using cranes after disconnecting all the cables from HV/LV sides, securing the cable ends properly by insulating covering material, detaching all the earthing connections, and transporting it to any other sub-station as directed by Engineer-in-charge in the interest of restoring electric supply and re-instating the transformer including all the cable connection, earthing connection , after doing insulation resistance test and restoring the electric supply as before all complete as specified and directed.
M&L for Dehydration and Filtration of oil in transformers / Voltage stabilizers / Oil insulaed RMUs installed at various locations to achieve di-electric strength not less than 60 KV at 2.5mm gap as per relevant IS with portable dehydration cum filtration plant, testing of the oil for the di-electric strength before filtration and after filtration complete all as directed by the Engineer-in-Charge.
Supply and topping up of transformer oil with di-electric strength not less than 60 KV in to the conservator tank/ body tank of the transformer etc complete all as directed by the Engineer-in-Charge.Make: Power oil/ Transol/ Sabitha Chemicals
Supply and replace silica Gel into breather of transformers complete all as directed
M & L for re-winding of HT 11/0.433 KV distribution transformer of capacity 200 ~ 750 KVA of any make by opening the Transformer core, HV windings, Insulating strips safely, inspecting the damaged winding , and re-winding the HV winding with new copper wires of same guagewith new DPC insulation to the copper conductor , heating the core chamber to a suitable operating temperature etc as directed by Engr-in-charge, and assembling the cores, windings etc in the transformer completely all complete as specified.
M & L for re-winding of HT 11/0.433 KV distribution transformer of capacity 200 ~ 750 KVA of any make by opening the Transformer core, LV windings, Insulating strips safely, inspecting the damaged winding , and re-winding the LV winding with new copper wires of same guagewith new DPC insulation to the copper conductor , heating the core chamber to a suitable operating temperature etc as directed by Engr-in-charge, and assembling the cores, windings etc in the transformer completely all complete as specified.
Supply and replace HT porcelain bushings for transformers of capacity 400 ~ 750 KVA all complete as specified and directed.
Supply and replace LT porcelain bushings for transformers of capacity 400 ~ 750 KVA all complete as specified and directed.
Supply and replace HV Gun metal stud for bushing in transformers of capacity 400 ~ 750 KVA all complete as specified and directed.
Supply and replace LV Gun metal stud for bushing in transformers of capacity 400 ~ 750 KVA all complete as specified and directed.
Supply and replace HT porcelain bushings for transformers of capacity 63 ~ 315 KVA all complete as specified and directed.
Supply and replace LT porcelain bushings for transformers of capacity 63 ~ 315 KVA all complete as specified and directed.
Supply and replace HV Gun metal stud for bushing in transformers of capacity 63 ~ 315 KVA all complete as specified and directed.
Supply and replace LV Gun metal stud for bushing in transformers of capacity 63 ~ 315 KVA all complete as specified and directed.
Dismantling Existing earthing and providing new new maintenance free chemical earthing complete with 40mm X 300mm advance chemical earthing pipe with (Strip in pipe Technology) with 50 kg of back fill compound buried directly in ground (Rocky soil) with earth pit not less than 2.5 Mtr deep below the normal ground level with top edge of plate not less than 1.5 Mtr below normal GL connected to existing copper strip as earth strip by means of SS bolts,nuts,check nuts and washers all as per IS 3043-1987 all as specified or indicated including testig on completion and as directed.The earth resistance shall be measured using fall of potential method as per Para 37 of IS:3043 & combined resistance should be less than 1 Ohms. NOTE:- The unit rate shall be deemed to include for Excavation & Earth work in any type of soil,PCC (1:3:6) type chamber,RCC 1:2:4 type B-1 cover 50mm thick reinforced with 8mm dia CTD Bars@75mm c/c both ways,MS handle 12mm dia and funnel.
M&L Earthing complete with galvanised steel earth plate electrode 600x600x6mm thick, buried directly and preferably vertically in ground (earth pit not less than 2.25 mtr deep below ground level ) with top edge of the plate not less than 1.5 mtr below normal ground level, connected to galavanised earth strip 32x6mm as earthing lead by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No 3, connected to earthing point of outdoor panel boards all as specified including earth work and excavation in any type of soil, PCC 1:3:6 type C1 chamber & RCC 1:2:4 type B1 cover 40mm thick, with 8mm dia steel deformed (TMT bars) reinforcement at 150mm c/c both ways, 20mm dia GI medium grade pipe for watering , water funnel, complete all as specified and testing on completion.
Supply and replace for GI earth strip of size 32 x 6 mm on walls, in pipes all complete as specified and directed
M & L for preparing old painted transformer surface with coarse cloth / wire brush, and spray painting transformer surface with synthetic enamel paint of smoke grey colour to a smooth finish appearance after applying one coat of zinc oxide primer for transformer capacity of 63 ~ 315 KVA all complete as specified and directed
M & L for preparing old painted transformer surface with coarse cloth / wire brush, and spray painting transformer surface with synthetic enamel paint of smoke grey colour to a smooth finish appearance after applying one coat of zinc oxide primer for transformer capacity of 400 ~ 750 KVA as specified and directed
M & L for for repair/servicing of 12KV RMU units outdoor type of any make including the following works:- i) Opeing of front covers of the RMU panel and cleaning the mechanisms for dust, oxidation, and decarburization by applying suitable CRC solution ii) Checking and repairing of all electrical mechanisms iii) Lubricating all moving mechanical parts with petroleum jelly, cleaning all cable bushings, bushing insulators with CRC solution iv) Checking and carrying out minor repairs to all gearboxes, auxilliary switches, spring mechanisms, switches etc all as directed v) Checking and tightening all mechanical connections, electrical connections
M & L for supply, filling/charging and testing non-flamable SF6 gas in 12 KV RMUs and/or VCB switchgears of any make, as per deficiency upto required pressure, including cleaning dust & rust by blower/cotton clothes, and searching for any existing gas leakage in the system including transportation of the switchgear/RMU to OEM's factory after disconnecting all the incomming and out going cables from the machine and making suitable standby arrangements all complete as specified and directed. Make :Stallion / Honeywell or as approved
S & replace CT of 200-100/5-5 Amps ratio, 11 KV operation, resin cast type, single phase including, indoor application disconnecting the old/damaged ones at sites including changing relay settings according to the CTs all complete as specified and directed.
S & replace CT of 50-100/5 Amps ratio, 11 KV operation, resin cast type, single phase indoor application including disconnecting the old/damaged ones at site including changing replay settings according to the CTs all complete as specified and directed.
M & L for repairing defects and configuring settings for differential Transformer protection self powered relay control system of suitable rating and current capacity for 12KV operation all complete as specified and directed.
S & replace insulated fuse links for RMUs of any type, 12kV operation,rated current capacity = 40/63/80Amps all complete as specified and directed.
Supply and replace fuse link holder assembly for RMUs, 12 KV/24KV operation all complete. Make : CG/ABB
M & L for for repairing defects and configuring settings of microprocessor based over current relays, numerical/programmable type along with replacing damaged control wiring for 12 kV RMUs outdoor type of any make all complete as specified.
Decarburizing/cleaning of 12kV VCB switchgear any make Bus bar chamber with disconnecting electrical connections, by spraying CRC solution and ensure proper decarburizing up to proper megger value , refixing the same after applying Becktol Red solution to the bus bar insulator, Bus bar spouts, Circuit spouts & checking all the connections, tightening the nuts , bolts complete incl replacement of defective rusted bolts & nuts all as specified and directed.
Supply and replace existing FCBC 110V/30A 3 phase battery charger suitable for 110V /100AH VRLA Batteries (55 Nos) including disconnectting existing control wiring and reconnecting after installation and configuring all settings as required at site all complete as specified and described.
S&F insulated synthetic mat nominal 3.0 mm thick conforming to IS: 15652-2006,ISI marked suitable upto 33 KV colour Blue standard roll from from 5m/10m to minimum joints and wedth of each mat shall be 1.0 Mt complete all as specified and directed by Engr-in-Charge ( MAKE:-PREMIERPOLYFILM Ltd/SUNTEX INSULATICA/DUNLOP).
Supply and replace cable bushings busbar extension type(obround bushings) for CG lucy RMU unit 11 KV operation, 630 Amps current carrying capacity, all complete as specified and directed.
Supply and replace copper Shunt trip coil 24VAC/DC-240VAC/DC all complete as specifeid and directed. Make : ABB
M & L for repairing defects and configuring settings of Earth fault Indicators with LED indicators powered from CTs, auxiliary relay, voltage range = 1 - 38KV, Trip current = 50A, Automatic/Manual push button operated all complete as specified and directed.
Supply and replace Heat shrink type insulating bushing boot for obround type/busbar extension type bushing all complete as specified and directed.
Supply and replace Busbar coupling with length range = 453mm ~ 750mm along with heatshrink busbar insulation all complete as specified and directed.
Supply and replace Time limit Fuses(TLF) alongwith configured to enable auto tripping of the circuit breaker from remote devices like Bukholtz, and LV breakers, all complete as specified and directed.
Supply and replace Cable jointing kit for 11 KV (Earthed) grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 185 Sqmm all complete as specified and directed. Make : Raychem / Denson/ 3M
Supply and replace Cable jointing kit for 11 KV (Earthed) grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 240 Sqmm all complete as specified and directed. Make : Raychem / Denson/ 3M
Supply and replace Cable jointing kit for 11 KV (Earthed) grade cable for outdoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 185 sqmm all complete as specifeid and directed. Make : Raychem / Denson/ 3M
Supply and replace Cable jointing kit for 11 KV (Earthed) grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 240 Sqmm all complete as specified and directed. Make : Raychem / Denson/ 3M.
Supply and replace Cable jointing kit for 11 KV (Earthed) grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 185 Sqmm all complete as specified and directed. Make : Raychem / Denson/ 3M
Excavation in trenches in hard/dense soil not exceeding 1.5 Mtr in wide and not exc. 1.5m in depth for taking out / laying of under ground cable in trenches or cable ducts all complete all as specified.
Returning, filling in including spreading, levelling, watering and well ramming in layers, not exceeding 25 cm thick in soil after repairing / jointing and laying and testing of cables complete all as specified
Removing surplus soil to a distance not exceeding 50 Mtr and deposited at a level not exceeding 1.5 mtr above from the starting point complete all as specified
M&L natural river sand as cushioning of cables including spreading and punning down all as per clause No 19.75 of SSR part -I all as specified. Note : Punned thickness shall be measured for payment purpose.
Supply and laying un-reinforced precast concrete cable cover, class HVP, type 1 with peak, size 300mm x 180mm x 40mm HV class with 'ELECTRIC' embossed on the top side in trenches along the electric cable as protection all complete as specified and directed.
M&L Cutting the tarmac / hard standings and excavating in trenches across the road with a size not exceeding 0.45 mtr wide and 0.6 depth for laying cable including making good the excavated portion by means of PCC 1:3:6, type C1 using 20mm graded aggregates matching with the surroundings all as directed.
M&L for 100mm dia GI pipe medium grade galvanised for cable protection and sealing both ends including taking out old pipe complete all as specified. MAKES : TATA/JINDAL/UTKARSH / SURYA ROSHINI
Taking down or out existing cable of sizes 3 core 185/240 sqmm 11KV XLPE conductor from the trenches / ducts/ along walls / poles / through poles / under roads/ inside sub station including segregation the serviceable cable by cutting down defective portion after testing by meggar (insulation tester ) , stacking and rolling unserviceable cable for further disposal all as directed by Engineer in charge
Relaying only serviceable cable obtained from taking out in same or new location or through cable ducts inside sub station of size 3 core 185/240 sqmm in trenches / ducts / along walls / poles / under road etc all complete as pecified and directed.
Supply and laying or fixing or passing through pipe or in cable ducts, 11000 volts grade XLPE(FRLS) insulated Heavy duty (earthed),screened, PVC bedded, galvanised steel strip or wire armoured, electric power cables (heavy duty) with aluminium conductor 240 sq mm 3 core size including dismantling old one complete all as specified and directed by Engineer-in-Charge. MAKE: Havells / Gloster / KEI Industries Ltd / Polycab / Asian Cables / Finolex
Supply and laying or fixing or passing through pipe or in cable ducts, 11000 volts grade XLPE(FRLS) insulated Heavy duty (earthed),screened, PVC bedded, galvanised steel strip or wire armoured, electric power cables (heavy duty) with aluminium conductor 185 sq mm 3 core size including dismantling old one complete all as specified and directed by Engineer-in-Charge. MAKE: Havells / Gloster / KEI Industries Ltd / Polycab / Asian Cables / Finolex
Supply and replace Batteries 110V/100AH consisting of 55 cells including battery rack including disconnecting and reconnecting the batteries with the exisitng FCBC battery charger including all the control wiring and electricla connection all complete as specified and described.
M & L for cement concrete in foundations, filling and mass concreting type D2 (1:4:8) with 40mm graded aggregates for pole foundations and copings etc all complete a sspecified and directed.
M & L for cement concrete in foundations, filling and mass concreting type C1 (1:3:6) with 20mm graded aggregates for pole foundations and copings etc all complete a sspecified and directed.
M & L for Lightning arresters expulsion type complete with all fittings, transmission class, discharge capacity 65 kilo amp for 11KV supply system all complte as specifeid and directed.
M & L for L.T. lightning arresters for outdoor use, non-liner resistor type, horn gap and choking coil, maximum working pressure 1100 volts all complete as specified and directed.
Supply & fix high voltage HT electrical insulation tape, self bonding/fusing, industrial grade ISI marked of size 38mm x 9.15 x 0.75mm, operating temperature 90 degree celcius applicable for voltge upto 36KV, 9Mtr long roll all as specified and directed
M/s NATIONAL ENGINEERING CONSTRUCTIONS CO
UV POWER TECH
VENKATESWARA ENGINEERS AND CONTRACTORS
M/S CHANDRA ENGINEERS AND CONTRACTORS
M.V.K.ENTERPRISES
SRIESWARI ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .