| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC | ₹3.5 Cr | L1 | Accepted-AOC Agreement executed by L1 |
| 2 | L2₹3.6 Cr+₹13.6 L (3.92%)Rejected-AOC | ₹3.6 Cr+₹13.6 L (3.92%) | L2 | Rejected-AOC Agreement executed by L1 |
| Sl No | Description | Qty | Unit | Abdul Gafoor K L1 | V ABDUL AZEEZ L2 |
|---|---|---|---|---|---|
| 1.00BRIDGE PROPER | |||||
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 181.44 | cum | 80 ₹14,515.2 Lowest | 100 ₹18,144 |
| 1.00 | OD324301/2025-2026:Bailing out water with 5 HP Engine and pumpset including conveyance of plant to the site, erection charges, cost of fuel, hire and working charges etc complete. | 200 | hour | 190 ₹38,000 Lowest | 200 ₹40,000 |
| 1.00 | 12.1.B.2:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth 3 M to 6 M- Mechanical Means | 147.57 | cum | 98 ₹14,462.06 Lowest | 150 ₹22,135.8 |
| 1.00 | OD281333/2024-2025:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-800 mm (Taken from BR/2021/515/RE 1) | 116.8 | metre | 9,000 ₹10,51,200 Lowest | 14,000 ₹16,35,200 |
| 1.00 | 12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | 9.65 | MT | 1,40,000 ₹13,51,420 | 1,03,000 ₹9,94,259 Lowest |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 12.32 | MT | 1,08,000 ₹13,30,884 | 97,000 ₹11,95,331 Lowest |
| 1.01 | 12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap | 9.07 | cum | 9,500 ₹86,184 Lowest | 9,800 ₹88,905.6 |
| 1.01 | 12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump | 72.58 | cum | 9,300 ₹6,74,956.8 Lowest | 10,500 ₹7,62,048 |
| 1.01 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 71.05 | cum | 10,500 ₹7,45,983 Lowest | 11,200 ₹7,95,715.2 |
Tender Value
₹3.5 Cr
EMD Value
₹1 L
Closing Date
2 Jul 2026, 11:00 amClosed
Superintending Engineer, PWD Bridges,North Circle
Superintending Engineer, PWD Bridges,North Circle
GENERAL Re Construction of Puthuppalam Bridge at km 7/040 of Pattambi Amayur Road- Pattambi LAC Palakkad District General Civil Work 1
2026_PWD_853895_2
PWD/BR/TR/3694/2025_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
540 days
pattambi
Please refer Tender documents.
9 documents required · 9 mandatory
₹8,270
Yes
₹1 L
Yes
11 Aug 2026
23 Jun 2026
4 Jul 2026
23 Jun 2026
2 Jul 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BRIDGE PROPER | |||||
| 1.001 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 1 | cum | - | - |
| 1.002 | OD324301/2025-2026:Bailing out water with 5 HP Engine and pumpset including conveyance of plant to the site, erection charges, cost of fuel, hire and working charges etc complete. | - | hour | - | - |
| 1.003 | 12.1.B.2:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth 3 M to 6 M- Mechanical Means | 0.8 | cum | - | - |
| 1.004 | OD281333/2024-2025:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-800 mm (Taken from BR/2021/515/RE 1) | 1 | metre | - | - |
| 1.005 | 12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | - | MT | - | - |
| 1.006 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | - | MT | - | - |
| 1.007 | 12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap | 1 | cum | - | - |
| 1.008 | 12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump | 0.4 | cum | - | - |
| 1.009 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 0.4 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1449032.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
sbd.pdf
Tender Documents • 6.07 MB
BOQ_1449032.xls
BOQ • 0.35 MB
nit.pdf
Other Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .