Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.4 L
EMD Value
₹32,900
Closing Date
22 Oct 2026, 2:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE
EXECUTIVE ENGINEER, LUCKNOW DIVISION SHARDA NAHAR,
Construction of Rain-chute on Left Gomti Bund D/S of Amar Shaheed Path. (Lot-01)
2026_UPIDC_1196940_1
07/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Left gomti Bund D/S of Amar Shaheed Path
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹32,900
Yes
15 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick jungle and throny bushes without uprooting manually including disposal of refuse as per direction of Engineer-in-Charge. | 875 | sqm | - | - |
| 2 | Dismantling existing boulder pitching & relaying manually as per direction of Engineer-in-Charge. | 64.13 | cum | - | - |
| 3 | Earth work in excavation of foundation for pucca work with all lead & lift including cost of labour, T & P etc. for proper completion of work a per direction of Engineer-in-Charge. | 124.13 | cum | - | - |
| 4 | Earth Work by power transport in filling for maintaining undulating bank between rainchute & river including lead upto 1 km, all lift and dressing to profile required for proper completion of work. | 875 | cum | - | - |
| 5 | Centering & shuttering for concrete work including Rent of shuttering material, labour and T&P etc for proper completion of work. | 117.82 | sqm | - | - |
| 6 | Providing and Laying PCC in M10 grade concrete (1:3:6) in foundation including cost of material, labour, T&P etc for proper completion of work. | 23.5 | cum | - | - |
| 7 | Providing and Laying RCC in M20 grade concrete (1:1.5:3) including cost of material, labour, T&P etc for proper completion of work. | 49.57 | cum | - | - |
| 8 | Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire required for proper completion of work including cost of all material, labour T&P etc. | 2.77 | MT | - | - |
| 9 | B/W 1:3 C.M. with class 150 brick with cement and coarse sand including cost of material, labour, T&P etc for proper completion of work. | 13.88 | cum | - | - |
| 10 | Pointing work in 1:2 with cement and coarse sand including cost of material, labour, T&P etc for proper completion of work. | 164.71 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.37 MB
BIDDOCUMENTNIT072026.pdf
Tender Documents • 1.92 MB
BOQ_2261252.xls
BOQ • 0.29 MB
TSEarthwork.pdf
Additional Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .