Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance | ₹3.5 L | L1 | Accepted-Finance LOWEST RATE ACCEPTED |
| 2 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | SATHEESH M L2 | HARIHARAN K L3 | A SURESHKUMAR L1 |
|---|---|---|---|---|---|---|
| 1.00Toilet | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 9.62 | cum | 320.51 ₹3,081.7 | 321.49 ₹3,091.13 | 318.27 ₹3,060.17 Lowest |
| 1.00 | OD474295/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 11.43 | cum | 5,452.12 ₹62,334.09 Lowest | 5,463.82 ₹62,467.85 | 5,501.93 ₹62,903.57 |
| 1.00 | OD474294/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for superstructure above plinth level including all cost of materials, labour charges etc. | 4.91 | cum | 6,238.33 ₹30,630.2 | 6,257.43 ₹30,723.98 | 5,697.55 ₹27,974.97 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.01 | cum | 7,068.01 ₹7,117.49 | 7,089.65 ₹7,139.28 | 7,018.01 ₹7,067.14 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 3.84 | sqm | 679.71 ₹2,610.09 | 681.8 ₹2,618.11 | 674.34 ₹2,589.47 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 11.96 | sqm | 856.44 ₹10,243.02 | 855.07 ₹10,226.64 | 850.21 ₹10,168.51 Lowest |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 14.4 | metre | 203.26 ₹2,926.94 | 203.88 ₹2,935.87 | 201.27 ₹2,898.29 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.62 | cum | 9,345.24 ₹5,822.08 | 9,373.86 ₹5,839.91 | 9,279.91 ₹5,781.38 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 219.78 | kilogram | 99.45 ₹21,857.12 | 98.44 ₹21,635.14 Lowest | 98.75 ₹21,703.28 |
Tender Value
₹3.7 L
EMD Value
₹9,278
Closing Date
28 Feb 2026, 5:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER LIDEW KUTTIKKOL
TOILET CONSTRUCTION
2026_LSGD_838451_7
ET/6/AE/LIDEW/KKL/25-26
Open Tender
Civil Works - Roads
Item Rate
KUTTIKOL
Please refer Tender documents.
3 documents required · 3 mandatory
₹820
Yes
₹9,278
Yes
4 Jul 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Toilet | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | OD474295/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 1 | cum | - | - |
| 1.003 | OD474294/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for superstructure above plinth level including all cost of materials, labour charges etc. | - | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.007 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - |
| 1.008 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.16 MB
BOQ_1413061.xls
BOQ • 0.32 MB
forms.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .