Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| Sl No | Description | Qty | Unit | JAISAL A L2 | MAHESH P L1 |
|---|---|---|---|---|---|
| 1.00Appendix A Puliyassery kurukkan kunnu road | |||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 34.56 | cum | 50 ₹1,728 Lowest | 51 ₹1,762.56 |
| 1.00 | OD140277/2025-2026:Filling with Quarry muck filling up low low laying and water logged areas with local materials / quarry muck spreading in layers , levelling the top at site and consolidation by ramming , etc. comp0lete for improving the CBR value of subgrade. | 17.28 | cum | 850 ₹14,688 | 778 ₹13,443.84 Lowest |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 25.92 | cum | 6,900 ₹1,78,848 | 6,800 ₹1,76,256 Lowest |
| 2.00Appendix B Aanapara kurukkankunnu edavazhi | |||||
| 2.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 21.25 | cum | 50 ₹1,062.5 Lowest | 51 ₹1,083.75 |
| 2.00 | OD140252/2025-2026:Filling with Quarry muck filling up low low laying and water logged areas with local materials / quarry muck spreading in layers , levelling the top at site and consolidation by ramming , etc. comp0lete for improving the CBR value of subgrade. | 10.62 | cum | 900 ₹9,562.5 | 778 ₹8,266.25 Lowest |
| 2.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 15.94 | cum | 6,800 ₹1,08,378.4 Lowest | 6,800 ₹1,08,378.4 Lowest |
| 3.00Appendix C Nedukallingha valluvakunnu road | |||||
| 3.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 33 | cum | 50 ₹1,650 Lowest | 51 ₹1,683 |
Tender Value
₹6.3 L
EMD Value
₹15,831
Closing Date
29 Aug 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE
O/o AE, KUNNAMANGALAM GP, PINCODE 673571
ROAD WORK
2025_LSGD_789821_3
AE/LIDEW/KGM/2025-26
Open Tender
Civil Works - Roads
Item Rate
270 days
KUNNAMANGALAM
8 documents required · 8 mandatory
₹1,400
Yes
₹15,831
Yes
5 Nov 2025
22 Aug 2025
30 Aug 2025
22 Aug 2025
29 Aug 2025
22 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1301437.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .