Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | ₹24.9 L Quoted ₹41 | L1 | Accepted-AOC Rs. 2490000.00 monthly rent |
| 2 | L2₹45+₹4 (9.76%)Rejected-Finance 511 AADHARSHILA EAST BLOCK AWADHPURI BHOPAL 462022 M P | NA | NA | 462022 | ₹45+₹4 (9.76%) | L2 | Rejected-Finance Due to Higher Rate |
| 3 | L3₹48+₹7 (17.1%)Rejected-Finance | ₹48+₹7 (17.1%) | L3 | Rejected-Finance Due to Higher Rate |
| 4 | L3₹48+₹7 (17.1%)Rejected-Finance | ₹48+₹7 (17.1%) | L3 | Rejected-Finance Due to Higher Rate |
| 5 | L4₹54+₹13 (31.7%)Rejected-Finance | ₹54+₹13 (31.7%) | L4 | Rejected-Finance Due to Higher Rate |
Tender Value
Refer Docs
EMD Value
₹6 L
Closing Date
5 Apr 2022, 5:00 pmClosed
Managing Director
Head Office, Madhya Pradesh Warehousing And Logistics Corporation Office Complex, Block-A Gautam Nagar, Bhopal, Madhya Pradesh 462023
CONSTRUCTION AND OPERATION OF GODOWN ON EXISTING CONSTRUCTED CAP/CONVERTIBLE CAP OF THE CORPORATION ON BUILD, OPERATE AND TRANSFER BASIS AT Pipariya Lakhnadon ,Distt. Seoni M.P.
2022_MPWLC_185931_1
BOT/22/6123/Pipariya_Lakhnadon
Open Tender
Miscellaneous Services
Item Wise
5475 days
Pipariya Lakhnadon, Distt. Seoni
As per tender document
2 documents required · 2 mandatory
₹5,900
₹6 L
Bhopal
20 Aug 2022
21 Feb 2022
7 Apr 2022
21 Feb 2022
5 Apr 2022
25 Feb 2022
23 Feb 2022
FINANCIAL BID FOR LOCATION Gadariyatola Distt. Umariya
I/we hereby offer minimum guarantee period for "Construction, operation and Transfer of ........... MT capacity of godowns on existing Constructed Pakka CAP/Convertible CAP of the MPWLC" for the storage of food grains/coarse grains/ sugar/ paddy etc. including preservation, comprehensive insurance, watch & ward, ancillary facilities such as office room, toilets, water tank, labour, rest shed, electric room, pump room, lorry weigh bridge, computer systems along with internet facility, fire arrangement and associated manpower for all operations connected with the maintenance of these facilities on fixed charges of Rupees 83/- Per MT per Month in the following manners :- For rest of the concession period the godown will be taken on AUB basis. The total concession period will be 15 Years. I/We hereby also agree that the expenses on property tax, minor / major maintenance of roads & buildings, water and electric installation and charges thereof, maintenance of weigh bridge, computer facilities their usage and other charges and as well as other local taxes / statutory charges associated with the operation and facilities provided as per terms of the agreement will be borne by me/us.
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .