| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹87.4 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹87.8 L+₹43,183.31 (0.49%)Rejected-AOC KALPAKANCHERY 676 551 | MALAPPURAM | KERALA | 676551 | 2 | Rejected-AOC Reject | |
| 3 | 3₹88.4 L+₹1.0 L (1.18%)Rejected-AOC | 3 | Rejected-AOC Reject |
Tender Value
₹1.1 Cr
EMD Value
₹50,000
Closing Date
25 Mar 2023, 4:00 pmClosed
BaijuT P
Forest Industries Travancore Limited , Aluva
Construction of VCB cum Bridge
2023_FITL_567584_1
FIT/CP-55/2022-23
Open Tender
Civil Works - Others
Item Rate
90 days
Puttamanna, Malappuram
Refer Tender Document
8 documents required · 8 mandatory
₹5,900
₹50,000
Forest Industries Travancore Limited Thaikkattukar
19 Jun 2023
18 Mar 2023
27 Mar 2023
18 Mar 2023
25 Mar 2023
18 Mar 2023
18 Mar 2023 - 21 Mar 2023
20 Mar 2023
Amount
Construction of VCB cum Bridge
60.1.1 : RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od384912/2022_2023 : Granular sub base by providing local material by spreading in uniform layers with motor grader on prepared surfaces mixing bu mix in place mrthodwith rotavatorat once and compacting with a smooth wheel roller to achive sesired density.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
od384941/2022_2023 : DR packing under foundation with departmental rubble including all labour charges. etc. complete- as per departmental officers at site.
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
10.26.3 : Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
60.63.1 : FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers.
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
60.5 : MS Rings - 100mm dia
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
60.6 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
od385158/2022_2023 : Providing and fixing granite of any colour and shade for name board of required size lain over base of cements mortar 1:4 (1 cement and 4 couse sand)including ll charges ec complete at all levels including leering and fixing
MOHAMMED RIYAS K
MUNEER P P
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .