Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.1 LAccepted-AOC VILLAGE BAGGA PO SIANJ TEHSIL CHACHYOT DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | 1 | Accepted-AOC rates are within estimates cost | |
| 2 | 2₹23.7 L+₹67,611 (2.93%)Rejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171002 | 2 | Rejected-Finance higher bid | |
| 3 | 3₹25.4 L+₹2.3 L (9.99%)Rejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | 3 | Rejected-Finance highest bid |
Tender Value
₹16.3 L
EMD Value
₹32,697
Closing Date
8 Feb 2022, 10:20 amClosed
DFO Nachan
Nachan Forest Division at Gohar
construction of Jal Bhandaran Structure at Nagalani Nalla in Nachan Forest Range of Nachan Forest Division
2022_FD_56174_1
8619B
Open Tender
Civil Works - Water Works
Item Wise
150 days
Nachan at Gohar
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
Payable To
₹32,697
Yes
17 Feb 2022
29 Jan 2022
8 Feb 2022
29 Jan 2022
8 Feb 2022
30 Jan 2022
29 Jan 2022 - 29 Jan 2022
Amount
Excavation in foundation trenches etc. in earth work lift upto 1.50 mtrs. Stacking the excavated soil and then returning the stacked soil in 15cm layers when required into plinth, sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 mtrs. in jumper work.
Providing and laying cement concrete 1:3:6 (1cement: 3 sand: 6 stone aggregate 40mm nominal size) and curing complete excluding the cost of form work & steel in foundation and plinth.
Providing and laying cement concrete work 1:1.5:3 (1 cement : 1.5 sand :3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : Wall (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level :
Providing and laying cement concrete work 1:1.5:3 (1 cement : 1.5 sand :3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : Lintels, beams girders bressumers and cantilevers upto floor two level :
Providing form work of ordinary timber planking so as to give a rough finish including, shutter, strutting, propping and centering etc. height of propping and centering, supporting floor to complete not exceeding upto floor 4 mtrs and removal of same.
LABH CHAND
MANOJ KUMAR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .