| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Fee/PreQual/Technical/Finance | -32.40% | ₹6.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.0 L+₹24,001.85 (3.55%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹7.0 L+₹24,001.85 (3.55%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.4 L+₹64,004.92 (9.47%)Admitted-Fee/PreQual/Technical/Finance | -26.00% | ₹7.4 L+₹64,004.92 (9.47%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.4 L+₹1.7 L (24.6%)Admitted-Fee/PreQual/Technical/Finance | -15.77% | ₹8.4 L+₹1.7 L (24.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹9.1 L+₹2.3 L (34.6%)Admitted-Fee/PreQual/Technical/Finance | -9.00% | ₹9.1 L+₹2.3 L (34.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
10 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Construction of Pre-fab Hut with toilet at Lar.
2026_PWDJK_319412_1
NIT No.47-2026-27
Open Tender
Civil Works
Percentage
30 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RnB Division Ganderbal
₹20,000
17 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
10 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 15.65 | Cum | 256.85 | ₹4,019.7 |
| 2 | P/L, of dry stone soling duly hand packed for foundation and backfilling with ramming, dressing, and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete. | 3.57 | Cum | 950 | ₹3,391.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) complete. | 2.71 | Cum | 5,202.9 | ₹14,099.86 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) complete. | 3.51 | Cum | 7,788.4 | ₹27,337.28 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) complete. | 8.54 | Cum | 8,422.45 | ₹71,927.72 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 70.25 | Sqm | 628.95 | ₹44,183.74 |
| 7 | Reinforcement for RCC work including straightening ,cutting ,bending, placing in position and binding all complete (Thermo Mechanically treated bars) etc complete. | 3.16 | Qtls | 12,320 | ₹38,931.2 |
| 8 | Supply & laying of GSB under floors in trenches, plinth, sides of foundations etc consolidating each layer by ramming ,watering, compacting, all inclusive leads, lifts, loading, un-loading, cost and carriage of material all complete. | 11.47 | Cum | 850 | ₹9,749.5 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 3.91 | Cum | 150 | ₹586.5 |
| 10 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) all complete. | 36.09 | Sqm | 283.8 | ₹10,242.34 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1057952.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .