| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC | ₹1.4 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.5 CrRejected-AOC | ₹1.5 Cr | 2 | Rejected-AOC L2 |
| 3 | 3₹1.7 CrRejected-AOC | ₹1.7 Cr | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | VINODKUMAR PURUSHOTHAMAN L2 | Noby George L1 | Suresh Joseph L3 |
|---|---|---|---|---|---|---|
| 1.00Pond | ||||||
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 360 | hour | 410.7 ₹1,47,852 | 390 ₹1,40,400 | 477.71 ₹1,71,975.6 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 11,543.35 | cum | 232.12 ₹26,79,443.56 | 230 ₹26,54,971.65 | 270 ₹31,16,705.85 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 9,994.62 | cum | 118 ₹11,79,365.4 | 117.5 ₹11,74,368.09 | 137.31 ₹13,72,361.55 |
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 84.9 | cum | 466.6 ₹39,612.47 | 520 ₹44,145.92 | 542.73 ₹46,075.61 |
| 1.00 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 254.69 | cum | 211.72 ₹53,922.54 | 240 ₹61,125.12 | 246.27 ₹62,722.01 |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 2,208.62 | cum | 3,598 ₹79,46,625.55 | 3,590 ₹79,28,956.57 | 4,185.15 ₹92,43,418.55 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 229.68 | sqm | 347.9 ₹79,905.67 | 340 ₹78,091.2 | 404.7 ₹92,951.5 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 6,075.75 | kilogram | 101.29 ₹6,15,412.72 | 100 ₹6,07,575 | 117.83 ₹7,15,905.62 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 121.52 | cum | 9,450.38 ₹11,48,362.93 | 9,430 ₹11,45,886.45 | 10,992.23 ₹13,35,720.83 |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
11 Mar 2026, 2:00 pmClosed
Superintend engineer, MICC, Kakkanad
Superintending engineer, MICC, Kakkanad
Construction of Storage weir in Chathurangapara thodu near Cementpalam area in ward no.5 od Udumbanchola panchayath
2026_Irrig_838953_2
IRR/IA/TR/1648/2024_5_1_1/1
Open Tender
Civil Works - Others
365 days
Udumbanchola panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,508
Yes
₹50,000
Yes
25 Jun 2026
4 Mar 2026
12 Mar 2026
4 Mar 2026
11 Mar 2026
4 Mar 2026
4 Mar 2026 - 11 Mar 2026
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1423573.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1423573.xls
BOQ • 0.30 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.84 MB
Download all tender documents and submit your bid