| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L | L1 | Accepted-AOC WORK AWARDED |
| 2 | L2₹1.9 LRejected-AOC | ₹1.9 L | L2 | Rejected-AOC 2ND LOWEST |
| 3 | L3₹2.1 LRejected-Finance | ₹2.1 L | L3 | Rejected-Finance 3rd lowest |
| Sl No | Description | Qty | Unit | SANTHOSH KUMAR T CONTRACTOR L3 | KABEERKUTTY CONTRACTOR L2 | SURESH KUMAR R L1 |
|---|---|---|---|---|---|---|
| 1.00Maintenance | ||||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 2.94 | cum | 1,195 ₹3,513.30 | 1,101.48 ₹3,238.35 | 1,190 ₹3,498.60 |
| 1.00 | OD288132/2025-2026:
Demolishing solid block work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar ( modifiedDSR 15.7.4) | 3.78 | cum | 2,125 ₹8,032.50 | 1,692.43 ₹6,397.39 | 2,000 ₹7,560 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 8.4 | cum | 359 ₹3,015.60 | 330.92 ₹2,779.73 | 350 ₹2,940 |
| 1.00 | OD288133/2025-2026: DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc: complete as per direction of Departmental officers at site | 6.2 | cum | 3,990 ₹24,718.05 | 3,673.78 ₹22,759.07 | 2,450 ₹15,177.75 |
| 1.00 | OD288131/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 2.21 | cum | 1,710 ₹3,770.55 | 1,578.5 ₹3,480.59 | 1,700 ₹3,748.50 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 5.6 | cum | 8,343 ₹46,720.80 | 7,675.59 ₹42,983.30 | 7,850 ₹43,960 |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 6.35 | cum | 7,710 ₹48,973.92 | 7,096.07 ₹45,074.24 | 7,700 ₹48,910.40 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 97.28 | sqm | 361 ₹35,116.28 | 340.16 ₹33,089.06 | 345 ₹33,559.88 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 97.28 | sqm | 80 ₹7,782 | 74.38 ₹7,235.31 | 70 ₹6,809.25 |
Tender Value
₹2.1 L
EMD Value
₹5,278
Closing Date
3 Nov 2025, 6:00 pmClosed
Assistant engineer panayam grama panchayat
Assistant engineer panayam grama panchayat
PROJ.NO. 338/25 COMPOUND WALL CONSTRUCTION AT ANGANAWADI 50 PANAYAM GP
2025_LSGD_815158_1
36/AE/LSGD/PNY/2025-26
Open Tender
Civil Works - Others
180 days
panayam grama panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,278
Yes
2 Feb 2026
25 Oct 2025
5 Nov 2025
25 Oct 2025
3 Nov 2025
25 Oct 2025
Amount
Maintenance
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
OD288132/2025-2026: Demolishing solid block work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar ( modifiedDSR 15.7.4)
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD288133/2025-2026: DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc: complete as per direction of Departmental officers at site
OD288131/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
KABEERKUTTY CONTRACTOR (BID ID -2426125)
SANTHOSH KUMAR T CONTRACTOR (BID ID -2425597)
Bidder Name
KABEERKUTTY CONTRACTOR
SANTHOSH KUMAR T CONTRACTOR
SURESH KUMAR R
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1364049.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1364049.xls
BOQ • 0.24 MB
sbdnit.pdf
Tender Documents • 0.92 MB
affi.pdf
Tender Documents • 0.24 MB
tenfrm.pdf
Tender Documents • 0.25 MB
preagmnt.pdf
Tender Documents • 0.26 MB
epay.pdf
Tender Documents • 0.23 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 3.15 MB
ipact.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid