Tender Value
Refer Docs
EMD Value
₹6,400
Closing Date
2 Jan 2023, 11:30 amClosed
ADDL. CHIEF ENGINEER (M)-4
ADDL. CHIEF ENGINEER (M)-4
Dehydration and Transformer Oil Top-up of 1000 KVA Transformer No. 2 installed at Burari Authority BPS.
2022_DJB_233771_1
NIT No. 20 Item No. 10 (22-23) EE (T)/ACE
Open Tender
Miscellaneous Works
Works
30 days
ADDL. CHIEF ENGINEER (M)-4
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Account No SB 50448339804
₹6,400
13 Jan 2023
26 Dec 2022
2 Jan 2023
26 Dec 2022
2 Jan 2023
26 Dec 2022
Disconnecting of HT Supply from main HT panel after proper switching off 11 KV VCB & discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine and dismantling of conservator tank all protection relays cable end boxes, vent pipes & other items as required
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-installation of weak point with the help of HT insulation material and proper taping etc.
Replacement of Top Cover gasket vertical vent gasket & missing hardware to stop the oil leakage
Replacement of silica gel
Complete assembling of transformer, cleaning of complete transformer, tightening of all connection of incoming & outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine
Filling of Transformer oil to up to top up level as required make: Power
Dehydration & filtration of complete transformer oil &and checking the die electric strength up to 50 KV at Site as required.
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint
Super System Engineers
Naman Enterprises
NEW INDIA ELECTRICALS
HYDROCON ENGINEERS
GOGIA BROTHERS
Gupta Brothers
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .