Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹19,700
Closing Date
17 Sept 2026, 6:00 pmClosed
EXECUTIVE ENGINEER, TDB, MAVELIKKARA
OFFICE OF THE EXECUTIVE ENGINEER, TDB, MAVELIKKARA-690101
Kozhinjanalloor Devaswom -Constructing Store Room
2026_TDB_869701_1
EEM/ET-67/2026-27
Open Tender
Civil Works - Buildings
Item Rate
120 days
Mavelikkara
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,888
₹19,700
18 Sept 2026
14 Sept 2026
18 Sept 2026
14 Sept 2026
17 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Constructing New Store room | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 13.01 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.04 | cum | - | - |
| 1.003 | OD64332/2026-2027:Random rubble masonry in cement mortar 1:6 (1 cement : 6 coarse sand) with hardstone in foundation and basement upto plinth level | 17 | cum | - | - |
| 1.004 | 6.3.1:Brick work with common burnt clay machine moulded perforated bricks of classdesignation 12.5 conforming to IS: 2222 in superstructure above plinth level up tofloor five level in cement mortar 1:6 (1 cement : 6 coarse sand):With F.P.S. ( non modular ) bricks | 7.8 | cum | - | - |
| 1.005 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 139.98 | sqm | - | - |
| 1.006 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 21.25 | sqm | - | - |
| 1.007 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 38 | sqm | - | - |
| 1.008 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 9.12 | sqm | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 8.64 | sqm | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
preliminary_agreement_new.pdf
Tender Documents • 0.22 MB
epaymentnew.pdf
Tender Documents • 0.16 MB
BOQ_1473666.xls
BOQ • 0.32 MB
Affidavit.pdf
Tender Documents • 0.06 MB
sbd671.pdf
Tender Documents • 1.52 MB
IntegrityPact.pdf
Tender Documents • 0.05 MB
form_of_tender.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .