Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.9 CrAccepted-AOC VILL FAZALPUR BEHIND FOCAL POINT NEAR RANDHAWA MASADAN JALANDHAR | JALANDHAR | JALANDHAR | PUNJAB | ₹44.9 Cr | L1 | Accepted-AOC Accept due to rates are reasonalbe |
| 2 | L2₹46.0 CrAccepted-AOC | ₹46.0 Cr | L2 | Accepted-AOC reject due to rates are not reasonable |
| 3 | L3₹51.8 CrAccepted-AOC | ₹51.8 Cr | L3 | Accepted-AOC reject due to rates are not reasonable |
Tender Value
Refer Docs
EMD Value
₹85.5 L
Closing Date
25 Feb 2023, 11:00 amClosed
Executive Engineer cum Project Manager
Jal Shakti Division Dharampur Bharari District Mandi HP
Providing Irrigation Facility under HP SHIVA Project for Chauntara, Gopalpur and Dharampur Blocks, District Mandi (Himachal Pradesh) Package 7
2023_HPIPH_67320_1
17846-17896 dated 19.01.2023
Open Tender
Civil Works
548 days
Dhrampur Chauntra Sarkaghat
Please refer Tender documents.
11 documents required · 11 mandatory
₹10,000
Executive Engineer JSV Division Dharampur Bharari
₹85.5 L
Hamirpur
20 Jun 2023
19 Jan 2023
25 Feb 2023
19 Jan 2023
25 Feb 2023
15 Feb 2023
6 Feb 2023
Amount
Civil Work
RCC Check Dam : Designing, Constructing, Testing & Commissioning ( to be approved by the competent authority) and Construction of RCC Check Dam as per drawings complete in all respects to the entire satisfaction of the Engineer-in-charge. The contractor shall provide 6 sets of approved drawing and design with one soft copy to the department.for the following size-
25 meter length and 4 meter depth at LIS Mataur Tanda
26 meter length and 4.2 meter depth at LIS Thouna Kuhal
32 meter length and 4.5 meter depth at LIS Rasher
35 meter length and 4.5 meter depth at LIS Golwan
35 meter length and 4.5 meter depth at LIS Bhadharwaar, LIS Bhambhla
60 meter length and 3.0 meter depth with dyke wall at LIS Brang
Tube Well :- Designing, Constructing, Testing & Commissioning (to be approved by the competent authority) of Tube Well as per drawings including allied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling, MCB DBs & switchboards, receptacle system & accessories etc., mono rail with chain pulley arrangement of suitable capacity for lowering/ lifting the pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge.
60 m Depth at LIS Kothi 1&2, LIS Dol & Kadiyal, LIS TW3(Batail 1 & Batail 2 Clusters), LIS TW4 (Cluster Bag-Chuhku) and LIS Churu Balh
80 m Depth at LIS Dhelu(Dhog)
Percolation well:- Designing, Constructing, Testing & Commissioning ( to be approved by the competent authority) and Construction of Percolation well with 3.00 mtr internal diameter and 9.00 mtr depth ,having RCC Circular structure, Roofing with RCC slab, allied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling, MCB DBs, receptacles system & accessories etc., Walk way/passage CI Rungs inside the percolation from top to bottom and steel stair case from ground level to top of percolation well with connecting path having suitable capacity crane/ hoist arrangement for handling of pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge. Refer Data Sheet No-1
PUMP HOUSE:- Designing, Constructing, Testing & Commissioning of Pump House & Chowkidar Room at following locations including all allied Civil Works, Electrical Works including lighting fixtures, fans, street / area lighting using poles, associated cabling/ wiring, MCB DBs, receptacle system & accessories etc., Sanitary Work, Site Development, Cutting/ Excavation in all kinds of soils, c/o PCC/ RCC Retaining walls, Breast walls, Toilets, Septic Tanks, External Solar powered Street lighting, External landscaping, Fire Fighting arrangement, Building Lightning Protection System (where applicable), Gantry Crane, dewatering etc complete as directed by engineer in charge The rates quoted by the contractor shall be for the complete work. All ancillary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account. Refer Data Sheet No-2
Pump house of 35.00 Sqm. Area At LIS Golwan, LIS Kothi 1&2, LIS Dol & Kadiyal and LIS Dhelu(Dhog)
Pump house of 35.00 Sqm. AreaAt LIS Percolation Seer Khad(Cluster Bahi), LIS Bhambla, LIS TW3(Batail 1 & Batail 2 Clusters), LIS TW4 (Cluster Bag-Chuhku), LIS Mataur Tanda
Pump house of 35.00 Sqm. Area At LIS Brang(2 Nos), LIS Churu Balh, LIS Sandhole, LIS Seoh, LIS Baroti Mandap Jodhan(2 Nos) and LIS Kothua Dhallara
Designing, Constructing, Testing & Commissioning of Desilting tank including civil work, Necessary valves & fittings, tube settler media etc. complete in all respect as per the drawings & technical specification.for the followings size-Refer Data Sheet No-3
7 KL Capacity at LIS Brang
16 KL Capacity at LIS Sulpur Bahi, LIS Bhadaraawar, LIS Percolation Seer Khad (cluster Bahi) and LIS Thouna Dhalait
21 KL Capacity at LIS Rasher
22 KL Capacity at LIS Mataur Tanda
28 KL Capacity at LIS Golwan
28 KL Capacity at LIS Bhambhala I
53 KL Capacity at LIS Bairi
68 KL Capacity at LIS Kothua Dhallara
Designing, Constructing, Testing & Commissioning of Sump well including civil work, Necessary valves & fittings, tube settler media etc. complete in all respect as per the drawings & technical specification.for the followings size-
6 KL Capacity at LIS Sulpur Bahi and LIS Thouna Dhalait
7 KL Capacity at LIS Percolation Seer Khad (cluster Bahi)
8 KL Capacity at LIS Rasher
11 KL Capacity at LIS Dhelu
11 KL Capacity at LIS Golawan
11 KL Capacity at LIS Bhambhala I, LIS Bhag Chuku and LIS Matur Tanda
11 KL Capacity At LIS Kothi 1&2
25 KL Capacity At LIS TW3(Batail 1 & Batail 2 Clusters)
44 KL Capacity At LIS Dol & Kadiyal
Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts Excluding restoration metalled surfaces to its original condition( Will be paid Separately) & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge.
Gopalpur Block
Chauntara Block
Dharampur Block
Providing ,Laying,jointing & testing of Galvanised Mild steel tube with flange / Butt welding of approved make or by JSV Deptt (list attached) conforming to BIS 1239-2004 ( with upto date ammendements ) of following diameter and class including all specials and fittings as required complete as per actual site condition with in all leads and lifts as per the direction and to the entire satisfaction of Engineer-in Charge. The pipe shall be factory galvanized as per IS: 4736-1986 (with up to date ammendements) .
80 mm dia Chauntara Block (Medium Class)
80 mm dia Gopalpur Block (Medium Class)
80 mm dia Dharampur Block (Medium Class)
100 mm dia Chauntara Block (Medium Class)
100 mm dia Gopalpur Block (Medium Class)
100 mm dia Dharampur Block (Medium Class)
Providing ,Laying,jointing & testing of Galvanised Mild steel tube with flange / Butt welding of approved make or by JSV Deptt (list attached) conforming to BIS 1239-2004 ( with upto date ammendements ) of following diameter and class including all specials and fittings as required complete as per actual site condition with in all leads and lifts as per the direction and to the entire satisfaction of Engineer-in Charge. The pipe shall be factory galvanized as per IS: 4736-1986 (with up to date ammendements) .
125 mm dia Chauntara Block (Medium Class)
125 mm dia Gopalpur Block (Medium Class)
125 mm dia Dharampur Block (Medium Class)
150 mm dia Chauntara Block (Medium Class)
150 mm dia Gopalpur Block (Medium Class)
150 mm dia Dharampur Block (Medium Class)
Providing, laying, jointing and testing of MS pipe, thickness 4.8 mm, MSERW flanged / Butt welded joints by considering three layers pipes including cost of bends complete as per GMSERW Pipe conforming to IS / ISO: 3183-2007 of following grade & wall thicknesses as per dimensions, weights and test pressure mentioned below in a random length of 4 to 7 meters. The M.S.flanges are to be provided on each joint as per required table conforming to IS: 6392-1971 and welding of flanges with electrodes as per relevants codes including required number & size of nuts and bolts & gasket sheet not less than 3mm thickness as per relevants codes. The welding of flanges to be done on both faces in two layers to make the joints leak proof and to entire satisfaction of the Engineer-in-charge. The laying of pipe should be conformed to IS: 5822-1994. (Earth work in trenches to be measured and paid for separately). The pipe shall be galvanising with zinc coating conforming to IS: 4736-1986. of following diameters:- (L-210 Grade)
150 mm dia 4.8 mm thick with Flange Table-5
200 mm dia 4.8 mm thick with Flange Table-5
Providing and fixing double flanged cast iron sluice valve of following dia of approved make of JSV to gravity main confirming to BIS: 780-1984 Class PN 1.00 having seat pressureof 10.20 Kg/cm² with M.SFlanges of table -5 with up to date ammendements.
80 mm dia Chauntara Block
100 mm dia Chauntara Block
125 mm dia Chauntara Block
80 mm dia Gopalpur Block
100 mm dia Gopalpur Block
125 mm dia Gopalpur Block
80 mm dia Dharampur Block
100 mm dia Dharampur Block
125 mm dia Dharampur Block
150 mm dia Dharampur Block
200 mm dia Dharampur Block
Providing and fixing screwed/flanged CI air valve (Single/double ball type) of approved make of JSV conforming to BIS-1452-1990 with upto date ammendments as per class PN-1.0 withstanding a seat pressure 15 Kg/cm2 in rising main within all leads and lifts.
50 mm dia Chauntara Block
80 mm dia Chauntara Block
100 mm dia Chauntara Block
150 mm dia Chauntara Block
50 mm dia Gopalpur Block
80 mm dia Gopalpur Block
100 mm dia Gopalpur Block
150 mm dia Gopalpur Block
50 mm dia Dharampur Block
80 mm dia Dharampur Block
100 mm dia Dharampur Block
150 mm dia Dharampur Block
Providing and fixing double flanged cast iron Scour valve of following dia of approved make of JSV to gravity main confirming to BIS: 780-1984 Class PN 1.00 having seat pressureof 10.20 Kg/cm² with M.SFlanges of table -5 with up to date ammendements.
80 mm dia Chauntara Block
100 mm dia Chauntara Block
125 mm dia Chauntara Block
150 mm dia Chauntara Block
80 mm dia Gopalpur Block
100 mm dia Gopalpur Block
125 mm dia Gopalpur Block
150 mm dia Gopalpur Block
80 mm dia Dharampur Block
100 mm dia Dharampur Block
125 mm dia Dharampur Block
150 mm dia Dharampur Block
200 mm dia Dharampur Block
Construction of Anchor Block at every in CC 1:1.5:3 (1 cement :1.5 sand :3 graded stone add 20 mm NS) i/c cost of Excavation , form work , C.C work, and reinforcement & curing complete of tentative size 1.50m x 1.50m x 2.00m to provide support to rising main pipe after every 50 m length complete as per direction and to the entire satisfaction of Engineer -in-Charge with in all leads and lifts. (The RD wise structural design shall got approved from the competent autrhority prior to construction of Thrust/Anchor blocks)
Chauntara Block
Gopalpur Block
Dharampur Block
Designing, Constructing, Testing & Commissioning (to be approved by the competent authority) RCC Circular under ground/partial under ground storage reservoirs as per capacity given below at various stages/sites including excavation in foundation in all kinds of soil. including PCC (1:3:6) in foundation and M:30 design mix in bottom slab/raft ,walls and beams. And RCC (1:1.5:3) in roof slab/dome with provision of inspection path around the dome with all alied Civil Works such as c/o chamber for valves, refilling and disposing of surplus excavated earth with in all leads and lifts. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe with bye pass arrangement consisting of GI / MS pipes special and valves of required classes and dia and all other accessories required such as MS ladders inside and outside, CI cowl type ventilator, SFRC manhole covers with frames of heavy duty with proper locking arrangement, water level indicator. The tanks shall be hydraulically tested for water tightness, All works shall be conforming to relevant IS code. The cost of valves, be included in the rates of tanks .complete in all respects to the entire satisfaction of the Engineer-in-charge. Refer Data Sheet No-4
100 KL Capacity Chauntara Block (LIS Golawan, LIS Kothi 1 and 2 (TW 1 and TW 2))
100 KL Capacity Chauntara Block for LIS Dhelu
250 KL Capacity Chauntara Block
100 KL Capacity Gopalpur Block
150 KL Capacity Gopalpur Block
200 KL Capacity Gopalpur Block
250 KL Capacity Gopalpur Block
300 KL Capacity Gopalpur Block
100 KL Capacity Dharampur Block
150 KL Capacity Dharampur Block
200 KL Capacity Dharampur Block
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Chauntara Block
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Gopalpur Block
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Dharampur Block
Pumping Machinery
SUBMERSIBLE PUMP SETS- Supply Installation Testing & Commissioning of submersible pumping set of KSB/ Crompton/ Kirloskar/ BS/ Calama make conforming to latest relevant BIS Code 8034:1976. The impeller of pump shall be directly mounted on extended submersible squirrel cage motor shaft conforming to BIS 9283-1979 with up to date amendments, totally dust and weather proof with detach able pump casing for easy inspection with double mechanical seal, grease/ oil lubricated bearings and provided with stainless steel thrust bearing plate to withstand vertical loads with minimum wear and tear, It should be fitted with device to take up expansion of water on heating of motor & suitable for operation on 415V ± 10%, 3 Phase 50 Hz AC supply. The pump motor shall be VFD duty and its power should be at least 10% in excess of maximum power required by the pump in complete operating range with mounting stand/ duck foot bend, steel guide wire with mounting hook, lowering chain and standard accessories as supplied by the manufacturers complete, suitable for fulfilling the following requirements:- including Pump sets (working ), necessary piping, electro-mechanical flowmeter and control valves along with electrical works including indoor & outdoor HT/LT switchboards/ PCC, Soft Starter Cubicle(VFD) with suitable bypass arrangement, HT/LT Cabling system complete with end terminations, cable trays & accessories, Earthing system with maintenance free earth electrodes, 415/ 230V small power distribution boards, local push button stations, Junction Boxes, Power/ Welding receptacles and its associated wiring/ cabling etc.,as per requirement of pumping machinery; complete work inclusive of all taxes, insurance, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores/ site, stacking, etc. including specials and wastage etc.; complete as per Tender Specifications, technical data Sheets and instruction of Engineer in charge.
For Tube well at Dhelu LIS i) Rated Voltage :- 415V ± 10% ii) Characteristics of water:- a) Under Ground Water) Temperature- 20 °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, iii) Discharge at Duty Point= 3.7 LPS iv) Static Head in meters- 80 mts. vii) Duty/Total head in Mts= 90 mts viii) Length of R/Main 40.00mts ix) Dia of R/Main=80 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of total head at duty point xii) HP of motor / Drive unit - Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2, 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. 2 sets (1 as stand by) of 3.7 LPS each with 90 m head
For Tube well at Dol & Khadiyal LIS i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Under Ground Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 20.7 LPS vi) Static Head in meters _62 mts. vii) Duty/Total head in Mts= 70 mts viii) Length of R/Main 50.00mts ix) Dia of R/Main=150 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 20.7 LPS each with 70 m head
For Tube well at Kothi-1 & 2 LIS i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Under Ground Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 6.5 LPS vi) Static Head in meters _62 mts. vii) Duty/Total head in Mts= 70 mts viii) Length of R/Main 50.00mts ix) Dia of R/Main=100 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 6.5 LPS each with 70 m head
For Tube well at Churu Ra Balh LIS i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Under Ground Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 7.7 LPS vi) Static Head in meters _115 mts. vii) Duty/Total head in Mts= 125 mts viii) Length of R/Main 500.00mts ix) Dia of R/Main=100 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 7.7 LPS each with 125 m head
For Tube well at Bag-Chuhku LIS i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Under Ground Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 4.7 LPS vi) Static Head in meters _62 mts. vii) Duty/Total head in Mts= 75 mts viii) Length of R/Main 31.00mts ix) Dia of R/Main=100 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 4.7 LPS each with 75 m head
For Tube well at Batail-2 LIS i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Under Ground Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point=10.6 LPS vi) Static Head in meters _62 mts. vii) Duty/Total head in Mts= 75 mts viii) Length of R/Main 100.00mts ix) Dia of R/Main=150 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 10.6 LPS each with 75 m head
SUBMERSIBLE PUMP SETS- Supply Installation Testing & Commissioning of submersible pumping set of KSB/ Crompton/ Kirloskar/ BS/ Calama make conforming to latest relevant BIS Code 8034:1976. The impeller of pump shall be directly mounted on extended submersible squirrel cage motor shaft conforming to BIS 9283-1979 with up to date amendments, totally dust and weather proof with detach able pump casing for easy inspection with double mechanical seal, grease/ oil lubricated bearings and provided with stainless steel thrust bearing plate to withstand vertical loads with minimum wear and tear, It should be fitted with device to take up expansion of water on heating of motor & suitable for operation on 415V ± 10%, 3 Phase 50 Hz AC supply. The pump motor shall be VFD duty and its power should be at least 10% in excess of maximum power required by the pump in complete operating range with mounting stand/ duck foot bend, steel guide wire with mounting hook, lowering chain and standard accessories as supplied by the manufacturers complete, suitable for fulfilling the following requirements:- including Pump sets (working ), necessary piping, eletro-mechanical flow meter and control valves along with electrical works including indoor & outdoor HT/LT switchboards/ PCC, Soft Starter Cubicle(VFD) with suitable bypass arrangement, HT/LT Cabling system complete with end terminations, cable trays & accessories, Earthing system with maintenance free earth electrodes, 415/ 230V small power distribution boards, local push button stations, Junction Boxes, Power/ Welding receptacles and its associated wiring/ cabling etc.,as per requirement of pumping machinery; complete work inclusive of all taxes, insurance, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores/ site, stacking, etc. including specials and wastage etc.; complete as per Tender Specifications, technical data Sheets and instruction of Engineer in charge.
From Check Dam to Desilting tank at Golwan LIS i)Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Raw Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 6.3 LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts= 28 mts viii) Length of R/Main 300.00mts ix) Dia of R/Main=100 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 6.3 LPS each with 28 m head
From Check Dam to Desilting tank at Brang LIS i)Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Raw Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 1.6 LPS vi) Static Head in meters _35 mts. vii) Duty/Total head in Mts= 42 mts viii) Length of R/Main 101.00mts ix) Dia of R/Main=80 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 1.6 LPS each with 42 m head
From Percolation Well to Desilting tank at Bhambhal-1 LIS i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Raw Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 5.2 LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts= 25 mts viii) Length of R/Main 24.00mts ix) Dia of R/Main=100 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 5.2 LPS each with 25 m head
From Percolation Well to Desilting tank at Mataur Tanda LIS i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Raw Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 4.8 LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts= 30 mts viii) Length of R/Main 100.00mts ix) Dia of R/Main=100 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 4.8 LPS each with 30 m head
From Check Dam to Desilting tank at Rasher LIS i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Raw Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 4 LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts= 30 mts viii) Length of R/Main 50.00mts ix) Dia of R/Main=80 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 4 LPS each with 30 m head
From Percolation Well to Desilting tank at Seer Khad LIS(Cluster Bahi) i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Raw Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 3.2 LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts= 25 mts viii) Length of R/Main 24.00mts ix) Dia of R/Main=100 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 3.2 LPS each with 25 m head
From Check Dam to Desilting tank at Thouna Dhlait LIS i) Rated Voltage :- 415V ± 10% iii) Characteristics of water:-Raw Water) Temperature _20_ °C, b) Turbidity up to 100 NTU, c) pH 6.5 to 8 d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 3 LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts= 25 mts viii) Length of R/Main 100.00mts ix) Dia of R/Main=80 mm x) Pumping hours per day- 16 hours xi) Limits of pump operation (-) 15% to (+) 10% of Total head at duty point xii) HP of motor /Drive unit ---, Power absorbed or Required BHP at (-) 15% of Duty head or BHP with margins/multiplying factor at duty point & (+) 10% head , whichever is higher i.e. Up to 2 HP = 1.5 , 2 to 5 HP = 1.4, 5 to 10 HP = 1.3 , 10 to 20 HP = 1.2 , 20 to100 HP = 1.15, Above 100 HP=1.10 xiii) Efficiency at duty point Minimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continuously for 7 days. .2 sets (1 as stand by) of 3 LPS each with 25 m head
CENTRIFUGAL PUMP SETS- Supply Installation Testing & Commissioning ) of horizontal spindle, horizontal/redial split casing/end suction(Back-pull out arrangements) single/double/multi stage star rated centrifugal pump or combination of pumps, of recommended make such as Mather and Platt/KSB/Kirloskar as per BIS 1520-1980 with up to date amendments, read with IS:9137-1978 or latest edition suitable for lifting water for under mentioned characteristics with bronze, impellers/ priming funnels, casing ring and shaft sleeves of bronze, shaft of steel grade 45C8/ EN8 with cast iron casing coupled directly through a flexible coupling on a common MS Base Plate to squirrel cage TEFC Energy efficient motors (Conforming to energy efficiency code IE3 or higher ) of standard make such as Kirloskar / BHEL / CG POWER / Siemens / ABB / Marathon and suitable for operation on 415V ± 10%, 50 Hz., 3 phase AC electric supply. The pump motor shall be VFD duty and its power should be at least +10% in excess of the maximum power required by the pump/pumps in the operation range of (+) 10% and (-)15% of the duty point head. The motor/motors as per IS 12615 : 2011 with up to date amendments. The scope shall also include necessary piping for suction, delivery & common header and eletro-magnetic flowmeter, along with electrical works including indoor & outdoor HT/LT switchboards/ PCC, Soft Starter Cubicle(VFD) with suitable bypass arrangement, HT/LT Cabling system complete with end terminations, cable trays & accessories, Earthing system with maintenance free earth electrodes, 415/ 230V small power distribution boards, local push button stations, Junction Boxes, Power/ Welding receptacles and its associated wiring/ cabling etc. as per requirement of following pumping machinery; Complete work inclusive of all taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores / site, stacking, etc. including specials and wastage etc. It shall include providing and fixing of C.I/C.S Sluice valves of approved make and appropriate class to resist the design pressure and complete as per Tender Specifications and instruction of Engineer in charge.
At Dhelu LIS 2 sets (1 as stand by) of 3.7 LPS each with 45 m, 1450 RPM with 16 Hours Pumping
At Dol & Khadiyal LIS 2 sets (1 as stand by) of 8.5 LPS each with 270 m,1450 RPM with 16 Hours Pumping
At Dol & Khadiyal LIS 2 sets (1 as stand by) of 12.2 LPS each with 40 m ,1450 RPM with 16 Hours Pumping
At Golwan LIS 2 sets (1 as stand by) of 6.3 LPS each with 274 m ,1450 RPM with 16 Hours Pumping
At Kothi-1 & 2 LIS 2 sets (1 as stand by) of 3.1 LPS each with 50 m , 1450 RPM with 16 Hours Pumping
At Kothi-1 & 2 LIS 2 sets (1 as stand by) of 3.4 LPS each with 35 m , 1450 RPM with 16 Hours Pumping
At Baroti Mandap Jodhan LIS 2 sets (1 as stand by) of 3.9 LPS each with 150 m ,1450 RPM with 16 Hours Pumping
At Baroti Mandap Jodhan LIS 3 sets (1 as stand by) of 11.4 LPS each with 205 m ,1450 RPM with 16 Hours Pumping
At Baroti Mandap Jodhan LIS 3 sets (1 as stand by) of 7.7 LPS each with 225 m ,1450 RPM with 16 Hours Pumping
At Bairi LIS 2 sets (1 as stand by) of 12.1 LPS each with 208 m ,1450 RPM with 16 Hours Pumping
At Brang LIS 2 sets (1 as stand by) of 1.6 LPS each with 159 m ,1450 RPM with 16 Hours Pumping
At Brang LIS 2 sets (1 as stand by) of 1.6 LPS each with 156 m ,1450 RPM with 16 Hours Pumping
At Churu Ra Balh LIS 2 sets (1 as stand by) of 7.7 LPS each with 80 m ,1450 RPM with 16 Hours Pumping
At Kothua Dhallara LIS 2 sets (1 as stand by) of 8.9 LPS each with 223 m ,1450 RPM with 16 Hours Pumping
At Sandhole LIS 2 sets (1 as stand by) of 1.4 LPS each with 60 m ,1450 RPM with 16 Hours Pumping
At Sandhole LIS 2 sets (1 as stand by) of 1 LPS each with 250 m ,1450 RPM with 16 Hours Pumping
At Seoh LIS 2 sets (1 as stand by) of 6.9 LPS each with 90 m ,1450 RPM with 16 Hours Pumping
At Bag-Chuhku LIS 2 sets (1 as stand by) of 4.7 LPS each with 15 m ,1450 RPM with 16 Hours Pumping
At Batail-2 LIS 2 sets (1 as stand by) of 10.6 LPS each with 60 m ,1450 RPM with 16 Hours Pumping
At Bhadharwar LIS 2 sets (1 as stand by) of 3.3 LPS each with 145 m ,1450 RPM with 16 Hours Pumping
At Bhambhal-1 LIS 2 sets (1 as stand by) of 5.2 LPS each with 55 m ,1450 RPM with 16 Hours Pumping
At Mataur Tanda LIS 2 sets (1 as stand by) of 4.8 LPS each with 30 m ,1450 RPM with 16 Hours Pumping
At Seer Khad LIS 2 sets (1 as stand by) of 3.2 LPS each with 45 m ,1450 RPM with 16 Hours Pumping
At Sulpur LIS 2 sets (1 as stand by) of 2.8 LPS each with 30 m ,1450 RPM with 16 Hours Pumping
INSTRUMENTATION, CONTROL & AUTOMATION WORK- Supply, installation, testing, integration, programming & commissioning of Instrumentation, Control & Automation system for Lift Irrigation including Level Transmitter with display, Level Indicator, Level Switch, Pressure Transmitter, Gauges, Actuated Valves, Flow Meter, micro PLC based Remote Terminal Unit (RTU) along with panel mounted 10” HMI, UPS, SPD, Instrumentation Cables, Cable Trays, Earthing system etc., necessary gateways with SIM card for remote data communication and all other ancillary works and accessories required to make the system fully functional as per user requirement .. Scope includes for 11 new schemes (LIS Golwan, LIS Kothi 1&2, LIS Dhelu(Dhog), LIS Dol & Kadiyal, LIS Bhambla, LIS THouna Dalait, LIS Rasher, LIS Batail 1&2, LIS Bag Chuku, LIS Mataur Tanda and LIS Tihra) Refer Data Sheet No-5
Lahoty Buildcon Limited
HS Engineers and Associates
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid