| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹3.0 L (1.69%)Rejected-AOC | ₹1.8 Cr+₹3.0 L (1.69%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | SABU K.S. L3 | Simon TJ L1 | SASIDHARAN NAIR V L2 | A AJI L4 |
|---|---|---|---|---|---|---|---|
| 1.00Supplying,Laying,Testing and Commissioning of Clear Water Pumping Main /Gravity Main- Woking Charges | |||||||
| 1.00 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 2,050 | metre | 27.7 ₹56,785 | 26.66 ₹54,653 Lowest | 27.72 ₹56,826 | 27.72 ₹56,826 |
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 143.5 | cum | 445 ₹63,857.5 | 429.04 ₹61,567.24 Lowest | 445.99 ₹63,999.57 | 445.99 ₹63,999.57 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1,506.25 | cum | 695 ₹10,46,844.45 | 666.91 ₹10,04,533.85 Lowest | 690 ₹10,39,313.19 | 693.26 ₹10,44,223.57 |
| 1.00 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 8.54 | cum | 827 ₹7,062.58 | 795.75 ₹6,795.71 Lowest | 827.19 ₹7,064.2 | 827.19 ₹7,064.2 |
| 1.00 | 2.20.2:Open timbering in trenches including strutting and shoring complete ( measurements to be taken of the face area timbered ):Depth exceeding 1.5 m but not exceeding 3 m | 500 | sqm | 97.9 ₹48,950 | 94.23 ₹47,115 Lowest | 97.96 ₹48,980 | 97.96 ₹48,980 |
| 1.01 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 52.52 | cum | 1,022 ₹53,676.46 | 983.73 ₹51,666.48 Lowest | 1,022.59 ₹53,707.45 | 1,022.59 ₹53,707.45 |
| 1.01 | 100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited. | 70.03 | cum | 1,971 ₹1,38,025.19 | 1,896.49 ₹1,32,807.4 Lowest | 1,971.41 ₹1,38,053.9 | 1,971.41 ₹1,38,053.9 |
| 1.01 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 2,050 | metre | 32.75 ₹67,137.5 | 31.49 ₹64,554.5 Lowest | 32.74 ₹67,117 | 32.74 ₹67,117 |
| 1.01 | 100.14.3:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 200mm diameter Ductile Iron Class K-9 Pipes. | 2,050 | metre | 155 ₹3,17,750 | 149.08 ₹3,05,614 Lowest | 154.97 ₹3,17,688.5 | 154.97 ₹3,17,688.5 |
Tender Value
₹1.8 Cr
EMD Value
₹50,000
Closing Date
10 Jun 2026, 3:00 pmClosed
Superintending Engineer
The Superintending Engineer, Public Health Circle, Kerala Water Authority, Thiruvananthapuram
Jal Jeevan Mission (JJM)-clear water pumping main to trippakadu 8LL, valiyavila 6.1LL,paramugal 6LL-clear water pumping main to paramugal OHSR(200mm DI)-Pineline Work
2026_KWA_854389_1
01/2026-27/KWA/PHC/D3/TVM
Open Tender
Civil Works - Water Works
Item Rate
365 days
Poovachal
Please refer NIT
7 documents required · 7 mandatory
₹5,515
₹50,000
Yes
6 Aug 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
5 Jun 2026 - 10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supplying,Laying,Testing and Commissioning of Clear Water Pumping Main /Gravity Main- Woking Charges | |||||
| 1.001 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | - | metre | - | - |
| 1.002 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | - | cum | - | - |
| 1.003 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 0.4 | cum | - | - |
| 1.004 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1 | cum | - | - |
| 1.005 | 2.20.2:Open timbering in trenches including strutting and shoring complete ( measurements to be taken of the face area timbered ):Depth exceeding 1.5 m but not exceeding 3 m | - | sqm | - | - |
| 1.006 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | - | cum | - | - |
| 1.007 | 100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited. | 0.2 | cum | - | - |
| 1.008 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | - | - |
| 1.009 | 100.14.3:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 200mm diameter Ductile Iron Class K-9 Pipes. | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1444061.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.65 MB
01NIT.pdf
Tender Documents • 13.41 MB
BOQ_1444061.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .