Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 LAccepted-AOC | 1 | Accepted-AOC Allotted to first rank M/s kuchhal enterprises | |
| 2 | 2₹4.6 L+₹1.3 L (41.4%)Rejected-AOC | 2 | Rejected-AOC 2 |
Tender Value
₹3.8 L
EMD Value
₹7,680
Closing Date
6 Jul 2020, 11:00 amClosed
Executive Engieer
Executive Engineer D and P Public Health Engineering Division Model Town Sonipat
Mtc of Pumping Machinery of various Rural and Urban water supply scheme with in the jurisdiction of PHE SDivn No3 Sonipat Twell Boosting Stations and Water works Ch to Annual Mtc of various villages of Kharkhoda town and Sonipat town Water
2020_HRY_133587_1
SE Memo NO. 3356 DATED 15/06/2020
Open Tender
Civil Works - Others
Works
270 days
Kharkhoda Town and Sonipat Town
Refer to tender documents and term and conditions as per approved DNIT
6 documents required · 6 mandatory
₹500
Yes
Executive Engineer D and P PHE Division
₹7,680
Yes
11 Sept 2020
29 Jun 2020
6 Jul 2020
29 Jun 2020
6 Jul 2020
29 Jun 2020
Amount
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works Horizontal pumps up to 20 HP 2 x 5 BHP = 10.00 BHP 13 x 7.50 BHP = 97.50 BHP 4 x 20 BHP = 80.00 BHP Total = 187.50 BHP G. Total = 187.50 x 9 Months = 1687.50 BHP
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works for 9 months after date of commencement. Horizontal pumps more than 20 HP 7 x 25 BHP = 175.00 BHP 2 x 40 BHP = 80.00 BHP Total = 255.00 BHP G. Total = 255.00 x 9 Months = 2295.00 BHP
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works Submersiblel pumps up to 20 HP Machinery installed in 2018 2 x 1 BHP = 2.00 BHP 3 x 2 BHP = 6.00 BHP 1 x 3 BHP = 3.00 BHP 5 x 5 BHP = 25.00 BHP 7 x 7.50 BHP = 52.50 BHP 8 x 10 BHP = 80.00 BHP 1 x 12.50 BHP = 12.50 BHP 1 x 15 BHP = 15.00 BHP Total = 196.00 BHP G. Total = 196.00 x 9 Months = 1764.00 BHP
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works Submersiblel pumps up to 20 HP Machinery installed in 11/2019 1 x 7.50 BHP = 7.50 BHP 1 x 10 BHP = 10.00 BHP Total = 17.50 BHP G. Total = 17.50 x 9 Months = 157.50 BHP
Guru Kripa Electrical and Engineering Works
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .