Ex Engineer PWD RM Division Kannur
Office of the Executive Engineer PWD Road Maintenance Division Kannur
Running Maintenance Contract for one year
2021_PWD_457427_1
D2/TN/11/2021-22(11)
Open Tender
Civil Works - Roads
Item Rate
365 days
Kuthuparamba
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
10 Mar 2022
30 Nov 2021
13 Dec 2021
30 Nov 2021
9 Dec 2021
30 Nov 2021
Amount
Routine Maintenance - Part A
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD67350/2021-2022:Mix seal surfacing providing ,laying and rolling of close graded premixed surfacing material of 20mm thickness composed of 11.2mm to 0.9 mm(type A) or 13.2mm to 0.9 mm (Type B) aggregate using bitumen VG-30 to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a static roller 8-10KN and finishing to required level and grades as per technical specification . By manual means Type A (Bitumen VG-30).
8.4.12:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 50cmx 60 cm rectangular (Single chevron etc.)
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork)
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
OD67355/2021-2022:Engaging mazdoor for cutting branches of trees learned toward the road threatening to pedestrians and traffic and removal of fallen trees or branches on the road and clearing traffic blockage , stacking the wood at a suitable place as directed by the Engineer in charge.
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
OD67354/2021-2022:Maintenance of earthen shoulder (stripping excess soil ) from the shoulder surface to achieve the approved level and compacting with plate compactor
OD67348/2021-2022:Engaging Mini lorry to carry the plastic debris and waste materials collected from the Right of Way of the road and depositing at the suitable place decided by the contractor and at the risk of contractor as directed by the Engineering charge.
OD67351/2021-2022:Engaging mazdoor wherever required for the removal of earth and other debris causing chocking of culvert and drains as per direction of Engineering in charge.
OD67347/2021-2022:Engaging mazdoor for sweeping and clearing right of way , collecting plastic and other solid debris and disposing the collected waste materials at a suitable place and in a suitable manner decided by the contractor and at the risk of the contractor.
OD67346/2021-2022:Engaging mazdoor wherever required for light jungle grown on the right of way of the road obstructing to the sight distance of vehicle users through out the contract.
OD67353/2021-2022:Pothole filling during monsoon using cold ready mix bituminous compound (Adequacy 25kg (1bag)/1sqm of pot hole) including all charges for spreading, ramming and conveyance expenses, etc. Complete including all incidental charges.
OD67955/2021-2022:Conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contract as directed by the departmental officer at site. Additional RI may be required in response to reports or complaints from the police, other authorities and the public as a result of major incidence, typhoon or flooding damages etc., and are not measurable/payable. A propotion of the RI should be carried out either during or immediately following a period of wet weather. (Rate for one day, inspection to be conducted for 52 numbers/1year)
K C DIJEESH KUMAR
Bidder Name
HARINDRAN CP
K C DIJEESH KUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_654442.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .