Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.3 LAccepted-AOC | L1 | Accepted-AOC lowest tender | |
| 2 | L2₹36.1 L+₹1.8 L (5.20%)Rejected-AOC | L2 | Rejected-AOC Second lowest tender | |
| 3 | L3₹37.3 L+₹3.0 L (8.77%)Rejected-Finance | L3 | Rejected-Finance Third Lowest tender |
| Sl No | Description | Qty | Unit | A S SHAJAHAN L2 | ABDUL RAHIM M.K. L3 | HARIF K RAHMAN L1 |
|---|---|---|---|---|---|---|
| 1.00new Building | ||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 290 | sqm | 8.78 ₹2,546.2 | 9.08 ₹2,633.2 | 8.34 ₹2,418.6 Lowest |
| 1.00 | 20.6.2.2:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.
Single pile above 50 tonne and upto 100 tonne capacityRoutine test (Test Load 1.5 times the Safe capacity) | 1 | per test | 36,221.13 ₹36,221.13 | 37,450.22 ₹37,450.22 | 34,432.01 ₹34,432.01 Lowest |
| 1.00 | 20.8.2:Lateral load testing of single pile in accordance with IS Code of practice IS : 2911 ( Part IV) for determining safe allowable lateral load on pile:Above 50 tonne and upto 100 tonne capacity pile. | 1 | per test | 36,697.72 ₹36,697.72 | 37,942.98 ₹37,942.98 | 34,885.06 ₹34,885.06 Lowest |
| 1.00 | 20.9:Integrity testing of pile using Low Strain / Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. Note:- The inclusion of the above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. | 2 | per test | 1,166.66 ₹2,333.32 | 1,206.25 ₹2,412.5 | 1,109.03 ₹2,218.06 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 85.93 | cum | 340.61 ₹29,268.28 | 352.17 ₹30,261.62 | 323.78 ₹27,822.09 Lowest |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 9.6 | cum | 243.94 ₹2,341.34 | 252.22 ₹2,420.81 | 231.89 ₹2,225.68 Lowest |
| 1.01 | 20.2.3:Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap).600 mm dia piles | 120 | metre | 3,863.81 ₹4,63,657.2 | 3,994.92 ₹4,79,390.4 | 3,672.96 ₹4,40,755.2 Lowest |
| 1.01 | 26.28.2:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge50mm average thickness | 9.04 | sqm | 251.23 ₹2,271.87 | 259.76 ₹2,349.01 | 238.82 ₹2,159.65 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 15.98 | cum | 301.55 ₹4,819.67 | 311.78 ₹4,983.18 | 286.65 ₹4,581.53 Lowest |
Tender Value
₹38.1 L
EMD Value
₹50,000
Closing Date
16 Sept 2025, 5:00 pmClosed
Jesna K Muhammed
Office of the Assistant Engineer, LSGD Section, Keezhmad Grama Panchayat
KEEZHMAD GP- PROJECT NO. 345-25-26-2025-26 Construction of Anganwadi building in Panchayath land Ward 1
2025_LSGD_794987_1
27/AE/LSGD/KZMD/25-26
Open Tender
Civil Works - Roads
Item Rate
180 days
Keezhmad GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
12 Nov 2025
8 Sept 2025
18 Sept 2025
8 Sept 2025
16 Sept 2025
8 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .