| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.7 L−₹43,254.81 (4.29%)Rejected-AOC KERALA KL KERALA | ₹9.7 L−₹43,254.81 (4.29%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.7 L−₹38,870.07 (3.85%)Rejected-AOC KANNADIKKUZHI HOUSE RAMANATTUKARA VAZHAYUR EAST PO | ₹9.7 L−₹38,870.07 (3.85%) | L3 | Rejected-AOC L3 |
| 4 | L4₹9.9 L−₹23,515.68 (2.33%)Rejected-AOC | ₹9.9 L−₹23,515.68 (2.33%) | L4 | Rejected-AOC L4 |
| 5 | L5₹9.9 L−₹22,188.17 (2.20%)Rejected-AOC 1003 SUB TREASURY DEVIKULAM | ₹9.9 L−₹22,188.17 (2.20%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | HAREESH KUMAR V K L2 | CHANDRAN. P. L6 | VK BALAN L1 | ADARSH C L7 | MADATHUMBHAGAM LABOUR CONTRACT CO-OPERATIVE SOCIETY L5 | RAJAN L4 | KAIRALI LABOUR CONTRACT CO-OPERATIVE SOCIETY L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Culvert | ||||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 240 | sqm | 12 ₹2,880 Lowest | 15.22 ₹3,652.8 | 14.17 ₹3,400.8 | 16 ₹3,840 | 14.82 ₹3,556.8 | 14.48 ₹3,475.2 | 14.35 ₹3,444 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.92 | cum | 1,500 ₹2,880 Lowest | 3,089.32 ₹5,931.49 | 2,863.42 ₹5,497.77 | 3,060 ₹5,875.2 | 2,991.58 ₹5,743.83 | 2,925.81 ₹5,617.56 | 2,900 ₹5,568 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 64.25 | cum | 160 ₹10,280.64 Lowest | 216.75 ₹13,927.05 | 200.89 ₹12,907.99 | 210 ₹13,493.34 | 209.89 ₹13,486.27 | 205.27 ₹13,189.42 | 370 ₹23,773.98 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 18.43 | cum | 6,500 ₹1,19,801.5 | 6,674.44 ₹1,23,016.6 | 6,186.24 ₹1,14,018.59 Lowest | 6,900 ₹1,27,173.9 | 6,463.13 ₹1,19,121.95 | 6,321.04 ₹1,16,503.09 | 6,266.39 ₹1,15,495.83 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 30.71 | cum | 7,000 ₹2,14,998 | 7,209.75 ₹2,21,440.26 | 6,682.4 ₹2,05,243.23 Lowest | 7,300 ₹2,24,212.2 | 6,981.49 ₹2,14,429.48 | 6,828.01 ₹2,09,715.5 | 6,768.36 ₹2,07,883.41 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 94.29 | sqm | 500 ₹47,147 Lowest | 706.41 ₹66,610.22 | 654.74 ₹61,738.05 | 720 ₹67,891.68 | 684.04 ₹64,500.87 | 669 ₹63,082.69 | 663.22 ₹62,537.67 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 18.71 | sqm | 500 ₹9,356 Lowest | 641.85 ₹12,010.3 | 594.91 ₹11,131.96 | 660 ₹12,349.92 | 621.53 ₹11,630.07 | 607.87 ₹11,374.46 | 760 ₹14,221.12 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 25 | sqm | 550 ₹13,750 Lowest | 808.75 ₹20,218.75 | 749.59 ₹18,739.75 | 825 ₹20,625 | 783.15 ₹19,578.75 | 765.93 ₹19,148.25 | 760 ₹19,000 |
| 1.01 | 5.9.16.2:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsAbove 20 cm wide | 9.46 | sqm | 560 ₹5,297.6 Lowest | 814.6 ₹7,706.12 | 755.02 ₹7,142.49 | 830 ₹7,851.8 | 788.81 ₹7,462.14 | 771.47 ₹7,298.11 | 770 ₹7,284.2 |
Tender Value
₹11.4 L
EMD Value
₹28,446
Closing Date
12 Jun 2026, 6:55 pmClosed
Assistant Executive Engineer
o/oAssistant Executive EngineerKyIP Canal Subdivision Vadakara
DEPOSIT-KyIP-Kozhikode Jilla Panchayath 2025-26- Arikkulam Panchayath Mukku Nambooriyoth Road Canal Culvert Construction across LBMC Near Ch.35/300kmGeneral Civil Work
2026_Irrig_854519_1
IRR/PI/TR/5686/2025_5_3_2/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
Arikkulam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹28,446
Yes
23 Jul 2026
5 Jun 2026
16 Jun 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Culvert | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.6 | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.006 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 0.6 | sqm | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.008 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.009 | 5.9.16.2:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsAbove 20 cm wide | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1444232.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1444232.xls
BOQ • 0.31 MB
sd.pdf
Tender Documents • 2.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .