| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36,984.06Admitted-Fee/PreQual/Technical/Finance NO 10 544 THANEERPANTHAL KANNADI KINASSERY 678701 | KINASSERY | PALAKKAD | KERALA | 678701 | +9.90% | ₹36,984.06 | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
14 Aug 2026, 4:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer MVIP Mechanical Subdivision (Irrigation),Thodupuzha, Muttom
The Piravom Branch Canal has two flush escape shutters of size 1.20 m (W) x 1.50 m (H), operated by a screw hoisting mechanism. The estimate includes overhauling of the hoisting mechanism and painting of the shutters and the hoisting mechanism
2026_Irrig_860453_1
IRR/MH/TR/6375/2024_16_1_4
Open Tender
Repair and Maintenance Works
Percentage
Piravom
Please refer Tender documents.
7 documents required · 7 mandatory
₹335
18 Aug 2026
15 Jul 2026
18 Aug 2026
15 Jul 2026
14 Aug 2026
15 Jul 2026
15 Jul 2026 - 14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair and panting of flush escape shutter | |||||
| 1.001 | OD41801/2025-2026:Clearing grass from banks of canal and removal of silt, zoological waste and other debris from canal shutter and grooves including removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | Day | 2,287.03 | - |
| 1.002 | OD18388/2024-2025:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embeded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery labour etc. complete as directed by the departmental officer at the site.(weight of the un-serviceable shutters and embedded parts mo-y be calculated as 60% and un-serviceable hoisting units as 80 % ) | 0.4 | kg | 4.45 | ₹1.78 |
| 1.003 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 1 | sqm | 494.79 | ₹494.3 |
| 1.004 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | - | sqm | 252.1 | - |
| 1.005 | OD18387/2024-2025:Erection of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Bridge / Platform
including hand rails , lader etc. for the same including . alignment correcting and setting
complete including cost of all labour, machinery, incidental and conveyance , lead and lift
charges etc complete but excluding cost of materials already supplied | 0.4 | kg | 4.45 | ₹1.78 |
| 1.006 | OD18391/2024-2025:Overhauling the base and nut mechanism, cleaning the screw rod, applying grease, replacing fasteners, and reassembling the unit as directed by the departmental officer at the site | - | set | 2,601.64 | - |
| 1.007 | OD18612/2024-2025:Welding the cracked joints between the base plate and the hoisting beam, and reinforcing all other joints including cost for welding,labour ,conveyance,all tools and plants etc.. complete as per direction of department officer at site | - | set | 3,434.69 | - |
| 1.008 | OD41752/2025-2026:Trial run of the shutter after completing all the works as per the direction of departmental officer at site. | - | Sets | 869.94 | - |
stage.html
html • 0.02 MB
finance_1455053.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
preliminaryagreement.pdf
Tender Documents • 0.06 MB
viewnit.pdf
Tender Documents • 0.03 MB
affidavit.pdf
Other Document • 0.04 MB
form.pdf
Other Document • 0.05 MB
integrity.pdf
Other Document • 0.03 MB
requisition.pdf
Other Document • 0.03 MB
BOQ_1455053.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.64 MB
firstextn.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].