Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC | ₹10.4 L | L1 | Accepted-AOC l1 |
| 2 | L2₹11.0 L+₹55,243.68 (5.29%)Rejected-Finance | ₹11.0 L+₹55,243.68 (5.29%) | L2 | Rejected-Finance L2 |
| 3 | L3₹34.2 L+₹23.8 L (227.8%)Rejected-Finance | ₹34.2 L+₹23.8 L (227.8%) | L3 | Rejected-Finance L3 |
| 4 | L4₹34.4 L+₹24.0 L (229.5%)Rejected-Finance | ₹34.4 L+₹24.0 L (229.5%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | TC VIJAYAN L1 | vino L2 | JJ ASSOCIATES L4 | Don Bridge L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | 40mm Metal | 13.28 | cum | 2,500 ₹33,190.5 Lowest | 2,700 ₹35,845.74 | 2,543.1 ₹33,762.7 | 2,543.1 ₹33,762.7 |
| 2.00 | 20mm metal | 7.92 | cum | 2,500 ₹19,792.5 Lowest | 2,700 ₹21,375.9 | 2,543.1 ₹20,133.72 | 2,543.1 ₹20,133.72 |
| 3.00 | 10 mm metal | 0.99 | cum | 2,500 ₹2,475 Lowest | 2,700 ₹2,673 | 2,543.1 ₹2,517.67 | 2,543.1 ₹2,517.67 |
| 4.00 | Coarse Sand (Zone III ) | 83.39 | cum | 3,000 ₹2,50,162.2 Lowest | 3,500 ₹2,91,855.9 | 3,026.1 ₹2,52,338.61 | 3,026.1 ₹2,52,338.61 |
| 5.00 | Portland Cement | 22.04 | tone | 11,000 ₹2,42,448.8 | 11,400 ₹2,51,265.12 | 11,201 ₹2,46,879 | 10,400 ₹2,29,224.32 Lowest |
| 6.00 | HIRE CHARGES OF Concrete Mixer Machine | 1.74 | day | 3,929 ₹6,855.32 Lowest | 3,929 ₹6,855.32 Lowest | 3,929 ₹6,855.32 Lowest | 3,929 ₹6,855.32 Lowest |
| 7.00 | HIRE CHARGES OF Vibrator | 1.74 | day | 2,012 ₹3,510.54 Lowest | 2,012 ₹3,510.54 Lowest | 2,012 ₹3,510.54 Lowest | 2,012 ₹3,510.54 Lowest |
| 8.00 | Stone For Masonry Work | 203.3 | cum | 2,142 ₹4,35,468.6 Lowest | 2,142 ₹4,35,468.6 Lowest | 2,142 ₹4,35,468.6 Lowest | 2,142 ₹4,35,468.6 Lowest |
| 9.00 | Through and Bond Stone Size 24x24x39cm | 1,423.1 | 50 nos | 34 ₹48,385.4 Lowest | 34.2 ₹48,670.02 | 1,713.6 ₹24,38,623.99 | 1,713.6 ₹24,38,623.99 |
| 10.00 | Wall formpanel 1250 x 500 mm | 0.99 | each | 1,607 ₹1,593.66 Lowest | 1,607 ₹1,593.66 Lowest | 1,607.16 ₹1,593.82 | 1,607.16 ₹1,593.82 |
Tender Value
₹15.0 L
EMD Value
₹27,000
Closing Date
14 Nov 2023, 5:00 pmClosed
secretary
PANAMARAM GP
SeasonKadav Road Concrete and Protection.
2023_DP_619516_1
NREGA/10544/2/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
KAIPATUKUNNU
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
Yes
₹27,000
Yes
10 Sept 2026
6 Nov 2023
16 Nov 2023
6 Nov 2023
14 Nov 2023
6 Nov 2023
6 Nov 2023 - 14 Nov 2023
Amount
40mm Metal
20mm metal
10 mm metal
Coarse Sand (Zone III )
Portland Cement
HIRE CHARGES OF Concrete Mixer Machine
HIRE CHARGES OF Vibrator
Stone For Masonry Work
Through and Bond Stone Size 24x24x39cm
Wall formpanel 1250 x 500 mm
100 mm channel shoulder 2.5 metre long
Don Bridge
JJ ASSOCIATES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .