Tender Value
₹13.3 L
EMD Value
₹13,273
Closing Date
4 Aug 2026, 2:30 pmClosed
Municipal Corporation of Rajahmundry
Municipal Corporation, Rajahmundry
Restoration of BT Road from Fortune Land Mark to 72-3-5/1 and from 72-3-5/1 to 72-33-4/3 and from 72-33-4/3 to 72-32-19/23 near Narayana Puram Park, Cyclone Colony in 1st division of RMC.
965603
137/MCR/General/2026-27
OPEN - NCB
Civil Works
EAST GODAVARI, ANDHRA PRADESH
9 documents required · 5 mandatory · 4 optional
₹470
₹13,273
20 Jul 2026
20 Jul 2026
20 Jul 2026
Scarifying the existing BT surface to a depth of 50mm by mechanical means and disposal of scarified material with all leads and lifts upto 1000Mtrs. As per MORT&H (4th revision) specn No. 305.4.3 (Picking)
Earth work excavation in all kinds of Soils for Structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH VP No. 484. For Manual Means
Carting away of excavated earth / debries to a lead of 2KM (the rate including conveyance charges, labour charges for loading, unloading charges) including ideal hire charges of truck etc. complete as directed by the Departmental Authorities of the work.
Providing and applying tack coat with bitumen 80/100 grade (s-90) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH
Providing and Laying Bitumenous Mecadam with 100-120 TPH / 40-60 TPH hot mix plant providing and average output of 75 t / hr. using crushed aggregates of specified grading premixed with bitumenous binder, trasnported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction as per Tech. specification clause 504 MORTH.
Providing and laying bituminous concrete with 40-60 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading -II, premixed with bituminous binder VG30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
Collection and Supply of Gravel from approved quarry including cost and conveyance of all materials and spreading the same to irrespective thickness including sectioning, levelling,ramming and watering etc. complete as per S.S. and as directed by the Site Engineer.
Details of Maximum amount reimbursable to the Contractor.
1) Provision for GST @18%
2) Provision for NAC @ 0.10%
3) Provision for Seigniorage charges
4) DMF @30% on Seigniorage charges
5) MERIT @2% on Seigniorage charges
6) Consideration 100% on Seigniorage charges
Scarifying the existing BT surface to a depth of 50mm by mechanical means and disposal of scarified material with all leads and lifts upto 1000Mtrs. As per MORT&H (4th revision) specn No. 305.4.3 (Picking)
Earth work excavation in all kinds of Soils for Structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 0.50Mtrs. Dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/ 304 MORTH VP No. 484. For Manual Means
Carting away of excavated earth / debries to a lead of 2KM (the rate including conveyance charges, labour charges for loading, unloading charges) including ideal hire charges of truck etc. complete as directed by the Departmental Authorities of the work.
Providing and applying tack coat with bitumen 80/100 grade (s-90) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH
Providing and Laying Bitumenous Mecadam with 100-120 TPH / 40-60 TPH hot mix plant providing and average output of 75 t / hr. using crushed aggregates of specified grading premixed with bitumenous binder, trasnported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction as per Tech. specification clause 504 MORTH.
Providing and laying bituminous concrete with 40-60 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading -II, premixed with bituminous binder VG30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
Collection and Supply of Gravel from approved quarry including cost and conveyance of all materials and spreading the same to irrespective thickness including sectioning, levelling,ramming and watering etc. complete as per S.S. and as directed by the Site Engineer.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Doc.doc
TENDER_DOCUMENT • 0.65 MB
Notice 2026.doc
TENDER_DOCUMENT • 0.10 MB
Print TS 62 Nit 137.xls
TENDER_DOCUMENT • 0.05 MB
BOQ TS 62 Nit 137.xlsx
TENDER_DOCUMENT • 0.07 MB
Contractor Information.pdf
TENDER_DOCUMENT • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .