Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.5 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹1.1 Cr+₹52.5 L (96.3%)Rejected-Finance C 35 C LAJPAT NAGAR LAJPAT NAGAR PART 1 VILLAGE TOWN DELHI CITY NEW DELHI SOUTH DELHI 110024 INDIA | SOUTH EAST DELHI | DELHI | 110024 | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹1.1 Cr+₹57.1 L (104.7%)Rejected-Finance B 607 608 EVEREST CHAMBERS MAROL NAKA ANDHERI KURLA ROAD ANDHERI EAST 400059 MUMBAI INDIA ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | L3 | Rejected-Finance L3 BIDDER | |
| 4 | L4₹1.2 Cr+₹69.1 L (126.7%)Rejected-Finance 37 INTEC HOUSE SECTOR 44 INSTITUTIONAL AREA GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | L4 | Rejected-Finance L4 BIDDER | |
| 5 | L5₹6.4 Cr+₹5.8 Cr (1066.3%)Rejected-Finance 2ND FLOOR A56 1 NOIDA SECTOR 50 GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L5 | Rejected-Finance L5 BIDDER |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
23 Jan 2023, 4:00 pmClosed
NANDESH YADAV
NANDESH YADAV GAIL VIJAIPUR
HIRING OF CONSULTANT FOR DESIGN ENGINEERING AND CONSTRUCTION MANAGEMENT SERVICES FOR CONSTRUCTION OF CULVERT/ROAD CROSSING FOR LIVE GAS PIPELINES IN GAIL VIJAIPUR
2022_GAIL_138669_1
GAIL/VH/C22322/NY/CIVIL/2022
Open Tender
Consultancy
Percentage
900 days
VIJAIPUR
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
₹2.1 L
Yes
MICROSOFT TEAM MEETING
20 Jul 2023
19 Dec 2022
24 Jan 2023
19 Dec 2022
23 Jan 2023
19 Dec 2022
28 Dec 2022
Amount
Design & Engineering
Percentage fee of awarded value/approved estimate of work for consultancy services i.e. Design & Engineering for the works of Construction of culverts/Road crossing for Live Gas Pipeline as per the scope of work & SCC & Payment break-up as per the scope of work & SCC.
Percentage fee of awarded value/approved estimate of work for consultancy services i.e.Construction Supervision for the works of Construction of Culverts/Road crossing for Live Gas pipeline as per the scope of work & Payment break-up as per the scope of work & SCC.
FIXED: Reimbursement/Contingencies etc. against Clause no. 3(3), 3(14), 5.4, 7 of Scope of Work.(Please quote Rate as One Only, no other rates is acceptable)
GST (CGST/SGST/IGST) on net total amount
Lyons Engineering Private Limited
RINA Consulting Private Limited
Tractebel Engineering Private Ltd
PIPELINE ENGINEERING CONSULTANTS PRIVATE LIMITED
Lyons Engineering Private Limited
RINA Consulting Private Limited
Tractebel Engineering Private Ltd
PIPELINE ENGINEERING CONSULTANTS PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .