Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC GIRIDHARIPOLLI UDAIPUR UDAIPUR GOMATI DISTRICT TRIPURA | UDAIPUR | GOMATI | TRIPURA | ₹13.7 L | L1 | Accepted-AOC Being a 1st lowest |
| 2 | L2₹14.0 LRejected-AOC GIRIDHARIPALLI UDAIPUR UDAIPUR GOMATI DISTRICT TRIPURA | ₹14.0 L | L2 | Rejected-AOC Being a 2nd lowest |
Tender Value
₹13.1 L
EMD Value
₹26,122
Closing Date
27 Mar 2026, 3:00 pmClosed
Chief Executive Officer
Chief Executive Officer, Udaipur Municipal Council, Udaipur, Gomati Tripura
Construction of betel leaf paan whole sale shop 06 nos at the back side of TSCB Udaipur branch UMC_UDP_2025_26 SH_ 02 block each of 03 shop.
2026_Urban_71749_1
DNIeT No. 144/DNIeT/UMC/UDP/2025-26
Open Tender
Civil Works
90 days
Udaipur
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Yes
₹26,122
Yes
14 May 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 1 | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil | ||||||
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level: 1:3:6 (1 Cement: 3 fine sand: 6 graded stone aggregate 20 mm nominal size) | 1 | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 (1 cement: 4 fine sand). | ||||||
| 6Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:- In cement mortar 1:4 (1 cement: 4 fine sand). | ||||||
| 7 | 15 mm cement plaster on the rough side of single or half brick wall of mix: Cement mortar 1:4 (1 cement: 4 fine sand) | 0.4 | sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 812 mm cement plaster of mix Cement mortar 1:4 (1 cement: 4 fine sand) | ||||||
| 9Neat cement punning | ||||||
| 10Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position: Local Teak Wood | ||||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_73018.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_73018.xls
BOQ • 0.28 MB
Betel_Leaf_Shop_DNIeT.pdf
Tender Documents • 2.89 MB
Download all tender documents and submit your bid