Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC RAYAGADA | ODISHA | 764062 | ₹3.1 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹3.1 LRejected-Finance | ₹3.1 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | K. THANGARASU L2 | R. KARUPPAIAH L1 |
|---|---|---|---|---|---|
| 1.00Repairs to RCC Roof School Building @ Poovampatti PUES in Thekkattur Panchayat | |||||
| 2.00 | Chipping of Flooring and rougheniong the Surface including cost and conveyance of all materials to site and all labour charges etc | 94.5 | SQm | 41 ₹3,874.50 | 40.3 ₹3,808.35 |
| 3.00 | Dismantling Existing pressed Tiles and Removeing Debrices away from Site including all cost and conveyance and all Labour charges etc Complete | 52.39 | SQm | 46 ₹2,409.94 | 45.9 ₹2,404.70 |
| 4.00 | Finishing the top of the roof with one course of Machine PressedTiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification (30% New tiles ) | 59.79 | SQm | 1,030 ₹61,583.70 | 1,025.8 ₹61,332.58 |
| 5.00 | Paving the floor with kotta stone of size 610x610x 20mm cm 1:3 20mm thick including cost and conveyance of all materials to site and all labour charges etc | 84 | SQm | 1,575 ₹1.3 L | 1,558 ₹1.3 L |
| 6.00 | Providing granolethic floor finish with ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum | 10.5 | SQm | 162 ₹1,701 | 158 ₹1,659 |
| 7.00 | Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc | 18.97 | SQm | 298 ₹5,653.06 | 294.5 ₹5,586.67 |
| 8.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 28.5 | SQm | 255 ₹7,267.50 | 253 ₹7,210.50 |
| 9.00 | Block Board Painting two coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall) | 5.64 | SQm | 150 ₹846 | 149.5 ₹843.18 |
| 10.00 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete | 79.96 | SQm | 143 ₹11,434.28 | 141 ₹11,274.36 |
Tender Value
₹3.3 L
EMD Value
₹3,252
Closing Date
20 Feb 2026, 3:00 pmClosed
Bdo.Arimalam
Pt.Union Office,Arimalam
Repairs to RCC Roof School Building at Poovampatti PUES in Thekkattur Panchayat
2026_RDTN_654264_1
Arm/BMS/Work--1
Open Tender
Civil works
Arimalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,252
24 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Repairs to RCC Roof School Building @ Poovampatti PUES in Thekkattur Panchayat
Chipping of Flooring and rougheniong the Surface including cost and conveyance of all materials to site and all labour charges etc
Dismantling Existing pressed Tiles and Removeing Debrices away from Site including all cost and conveyance and all Labour charges etc Complete
Finishing the top of the roof with one course of Machine PressedTiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification (30% New tiles )
Paving the floor with kotta stone of size 610x610x 20mm cm 1:3 20mm thick including cost and conveyance of all materials to site and all labour charges etc
Providing granolethic floor finish with ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Block Board Painting two coats over one coat of Primary Coat including cleaning preparing the surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall)
Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 12 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
Arm_doc--1.pdf
Tender Documents • 0.26 MB
BOQ_784526.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid