| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.0 LAccepted-Finance | ₹71.0 L | L1 | Accepted-Finance RESPONSIVE |
| 2 | L2₹85.8 LAccepted-Finance | ₹85.8 L | L2 | Accepted-Finance RESPONSIVE |
| Sl No | Description | Qty | Unit | Bhawani Constructions L1 | M/s Raja Ji Construction Company L2 |
|---|---|---|---|---|---|
| 1.00 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means | 21.09 | cum | 2,100 ₹44,289 | 2,550 ₹53,779.50 |
| 2.00 | Prime Coat Low porosity
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 843.75 | sqm | 40 ₹33,750 | 44 ₹37,125 |
| 3.00 | Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 20,249.78 | sqm | 12 ₹2.4 L | 15 ₹3.0 L |
| 4.00 | Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) with Bitumen VG-10 | 42.19 | cum | 10,000 ₹4.2 L | 10,500 ₹4.4 L |
| 5.00 | Semi Dense Bituminous Concrete with Warm Mix Technology - Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Grading I - 13mm using Bitumen VG - 10 (bituminous binder @ 4.5 % of mix) | 478.01 | cum | 11,500 ₹55.0 L | 14,000 ₹66.9 L |
| 6.00 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | 1,556.1 | sqm | 500 ₹7.8 L | 650 ₹10.1 L |
| 7.00 | Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. Manual Means | 875 | Rmt | 80 ₹70,000 | 30 ₹26,250 |
| 8.00 | Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 | 175 | sqm | 60 ₹10,500 | 60 ₹10,500 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
6 Apr 2026, 3:00 pmClosed
Executive Engineer PD PWD Bhatwari
Office of The Executive Engineer PD PWD Bhatwari
Renewal work by SDBC from Km-01 to 05 of Uttarkashi-Ghansali-Tilwara motor road under annual maintenance year 2026-27.
2026_pwd_92748_1
327/Tender Dt 28-02-2026
Open Tender
Civil Works - Roads
90 days
Bhatwari Uttarkashi
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
The Executive Engineer PD PWD Bhatwari
₹1.8 L
8 Apr 2026
7 Mar 2026
7 Apr 2026
7 Mar 2026
6 Apr 2026
7 Mar 2026
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means
Prime Coat Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) with Bitumen VG-10
Semi Dense Bituminous Concrete with Warm Mix Technology - Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Grading I - 13mm using Bitumen VG - 10 (bituminous binder @ 4.5 % of mix)
Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. Manual Means
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_109793.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
Tendernotice_2.pdf
PDF • 3.58 MB
BOQ_109793.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid