Loading…
Loading…
Tender Value
₹45.7 L
EMD Value
₹45,700
Closing Date
10 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Drainage Division No.2, Surat.
Drain Cleaning Works of Bhamaiya Kadodara Main Drain From Ch.00 to 11400 Mtr at Ta.Bardoli Dist.Surat of Kakarapar Command.
291086
41 of 2025-26
Open
Civil - All
Surat
14 documents required · 12 mandatory · 2 optional
₹1,500
Yes
Executive Engineer, Drainage Division No.2, Surat.
₹45,700
Yes
28 Mar 2026
28 Mar 2026
28 Mar 2026
10 Apr 2026
28 Mar 2026
Name of work : Drain Cleaning Works of Bhamaiya Kadodara Main Drain From Ch.00 to
Mtr at Ta.Bardoli Dist.Surat of Kakarapar Command.
Name of Sub Division:- Deputy Executive Engineer Drainage Sub Division, Bardoli.
Item Quantitieses Item of work Estimated Rates Unit Total Amount
Item Quantitieses Item of work Estimated Rates Unit Total Amount
No. timated but according to
may be Rate in In words estimated
more or less figure quantities
1 63404.00 Item No : 1 72.00 Rupees CM
Excavation of canal/drain in all sorts of Seventy Two
soils (including wet and slushy condition of
soil) including depositing the excavated
stuff in uniform layers in canal banks or in
spoil banks or as and where directed
including dressing the canal section up to
lead of 1 K.M. and all lift including clearing
the site etc. complete (By Machinery for
canal / drain maintenance ) above
cumecs capacity of canal / drain
I/We am/are Willing to carry out the work at………………………% above/below Percent(should be written in
figures and words) of the estimated rates mentioned above.Amount of my/our tender works out as under.
* Estimated amount Put to tender Rs.45,65,088.00 * Estimated amount Put to tender Rs.45,65,088.00
Deduct…….% below Rs. Add…….% above Rs.
Net Rs. Total Rs.
In words…………………….. In words……………………..
*(Please strike out whichever is not applicable)
Note 1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as
Note-2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by
the contractor under his signature.
Note-૪ Rates quotes include clearance of site (prior commencement of work and at its close) in all respects and hold good
for work under all conditions, site, moisture, weather etc.
Note-4 To be continued on additional sheets, if found necessary.
Executive Engineer
Signature of Contractor Drainage divisin No.-2
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01-01-SBD.pdf
01-02-Schedule B.pdf
Download all tender documents and submit your bid