| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹58.8 L+₹2.7 L (4.76%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Anoop AJ L1 | M ASHOK KUMAR L2 |
|---|---|---|---|---|---|
| 1.00Construction of man holes | |||||
| 1.00 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 60 | sqm | 476.03 ₹28,561.8 Lowest | 498.7 ₹29,922 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 4 | cum | 1,668.42 ₹6,673.68 Lowest | 1,747.87 ₹6,991.48 |
| 1.00 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 40 | sqm | 146.22 ₹5,848.8 Lowest | 153.19 ₹6,127.6 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 99 | cum | 2,286.03 ₹2,26,316.97 Lowest | 2,394.89 ₹2,37,094.11 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 129.22 | cum | 386.11 ₹49,894.29 Lowest | 404.49 ₹52,269.41 |
| 1.01 | OD263557/2024-2025::Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m for 2nd depth of 1.50m to 3.0m in all kinds of soil. | 66.46 | cum | 526.74 ₹35,006.09 Lowest | 551.83 ₹36,673.52 |
| 1.01 | OD263560/2024-2025:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, including getting out the excavated soil and disposal of surplus surplus excavated soil as directed, within a lead of 50 m for 3rd depth of 3.00m to 4.50m in all kinds of soil. | 36.92 | cum | 667.38 ₹24,640.34 Lowest | 699.16 ₹25,813.69 |
| 1.01 | 100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals. | 350 | metre | 119.56 ₹41,846 Lowest | 125.26 ₹43,841 |
| 1.01 | 100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete. | 48 | sqm | 960.54 ₹46,105.92 Lowest | 1,006.28 ₹48,301.44 |
Tender Value
₹53.5 L
EMD Value
₹50,000
Closing Date
18 Sept 2025, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer
State Plan2025 2026 TSS Reconstruction of old brick man holes construction of new man holes Cleaning sewer lines using Bucket type cleaning machine in Nandavanam near DD Office to Jagathy junction near back side of Karthika hotel
2025_KWA_793939_1
WRD/KWA-CE(SR)/TR/7430/2025
Open Tender
Civil Works - Others
Item Rate
365 days
Thiruvananthapuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,760
Yes
₹50,000
Yes
4 Nov 2025
3 Sept 2025
20 Sept 2025
3 Sept 2025
18 Sept 2025
3 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1311582.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .