Loading…
Loading…
Tender Value
₹66.4 Cr
EMD Value
₹66.4 L
Closing Date
27 Jan 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Additional City Engineer & I/c. City Engineer
Construction of Fly over Bridge over Udhna Tin Rasta junction and Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in South (Udhna) zone A for Surat Municipal Corporation, Surat on EPC basis (Design, Engineering, Procurement and Construction)
262523
A.C.E and I/C C.E./BRIDGE/17/2025-2026 (Work No.1)
Open
Civil Works - Bridges
Surat
3 documents required · 3 mandatory
₹21,240
Commissioner, Surat Municipal Corporation
₹66.4 L
7 Jan 2026
7 Jan 2026
7 Jan 2026
27 Jan 2026
7 Jan 2026
Figures (Rs.) (Rupees)
Construction of Fly over Bridge over Udhna Rs. 66,39,96,252.90 Sixty Six Crore Thirty
Tin Rasta junction and Sarvottam hotel Nine lacs Ninety Six
junction on Udhna main road (Surat- Navsari Thousand Two Hundred
road) in South (Udhna) zone A for surat Fifty two Rupees and
Municipal Corporation, Surat on EPC basis Ninety Paise only
(Design, Engineering, Procurement and
Construction)
I/We hereby tender for carrying out the above work as specified in the memorandum & under Price-Bid showing items of
work to be carried out within time specified therein and in accordance with all specifications, designs, drawings and
instructions in writing referred to in provisions under annexed conditions of contract under contract documents and agree
that all materials of construction in the work are to be procured by us. Should this tender be accepted, I/We hereby agree
to abide by and fulfil all the terms and provisions of the conditions of contract annexed thereto as fully applicable, and in
default thereof, agree to forfeiture of and pay to the client, the sums of Earnest money mentioned in the said conditions.
Sign, seal and adress of the contractor : Executive Engineer (Bridge)
Date : Surat Municipal Corporation.
Construction of Fly over Bridge over Udhna Tin Rasta junction Surat Municipal Corporation [BRIDGE CELL]
and Sarvottam hotel junction on Udhna main road
(Surat- Navsari road) in South (Udhna)
Construction of Fly over Bridge over Udhna Tin Rasta junction and
Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in
South (Udhna) zone A for Surat Municipal Corporation, Surat on EPC basis
(Design, Engineering, Procurement and Construction)
1 The project envisages Design and Construction as detailed in the scope of work. For guidance of bidders
outline drawings showing the general arrangement contemplated by the employer are attached in Volume-
I. However tender is to be awarded only on the Contractor’s own design complying with the various
requirements indicated in the bid documents as well as in the chapter on design criteria.
The typical outline drawings enclosed are to be taken as indicative except for certain salient parameters,
obligatory requirements etc. which have been specified in bidding data in Vol - I. These outlines also
specify the minimum acceptable mix, specification and sizes of different components and the Contractor’s
design shall provide for comparable specifications and in any case not inferior to those for corresponding
components. If various items and activities as per scope of work of the tender document are not found to
be included in Contractor’s technical proposal, drawings and technical note, then the lump sum offer
quoted by the Contractor shall be presumed to be inclusive of all such items, specifications and activities
as per scope of work in the tender document. No extra payment shall be paid for the same.
2 The bidder must quote his offer at the specified space in the PRICE BID both in words and figures. The
price bid should be submitted online.
3 The offer quoted shall except in so far as it is otherwise provided under the contract, include all
constructional plant, labour, supervision, all construction materials, all leads and lifts, erection,
maintenance, insurance, profits, taxes (excluding GST) , octroi, royalties and duties together with all
general risks, liabilities and obligations set out or implied in the contract. Materials to be used in
embankments and unserviceable materials to be disposed should be with all leads and lifts.
4 In case of any discrepancies between provisions stated in the scope of work and those covered by the
technical specifications / drawings, the provisions in the scope of work shall have preference.
5 The bidders shall quote his offer in Indian Rupees only.
6 The price quoted for the job shall be deem to cover entire cost of material, labour, plants, equipments,
enabling works, overheads, Profits and all that is required to complete the intents and purpose of the
contract without any additional payment called for.
7 • The rates quoted by the Contractor must be inclusive of all taxes prevailing on due date of bid
submission except GST. However, any subsequent changes in the tax structure by Government after due
date of bid submission will be compensated (+/-) on availability or submission of actual documentation.
Contractor will have to intimate Engineer regarding changes occurred in the tax structure after bid
submission. If the contractor fails to provide such information and if any financial obligation may arise
due to change in tax structure, same will be recovered from the contractor. GST will be paid separately on
the bills. Hence, it is the responsibility of the contractor to pay theGST to the concerned Authority.
Construction of Fly over Bridge over Udhna Tin Rasta junction BILLING SCHEDULE
and Sarvottam hotel junction on Udhna main road
(Surat- Navsari road) in South (Udhna)
SURAT MUNICIPAL CORPORATION.
[BRIDGE CELL ]
Construction of Fly over Bridge over Udhna Tin Rasta junction and Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in South (Udhna) zone
A for Surat Municipal Corporation, Surat on EPC basis (Design, Engineering, Procurement and Construction)
Estimated Cost of Project (Put to Tender) : Rs.
BILLING SCHEDULE
Item No. Item Description Unit Payment Terms
1 Establishment of Camp at Site - Site office, Store, Batching Plant, Labour Camp 0.220 On Completion of 60% on establishment of Camp 20% Of Completion of All 20% After Completion of
including clearing of site and dismantling of structures, pavements, Streetlights, Laying of Item site , Cleaning, dismantaling at Required site work.
water supply/drainage/storm water line, which may foul with the work. etc. including
stacking and transportation of the same. Clearing the site including all debris after
completion of work.
2 Carryout soil investigation work including drilling 150 mm dia bore holes in all sorts of 0.148 Pro rata on per 70% on completion of work 30% on Approval of work
soil, ordinary rock and hard rock, up to maximum depth as mentioned, collection Rmt. Basis
undisturbed samples and conduction standard penetration tests alternate at an interval of
1.5 to 2.0 m depth, conducting necessary laboratory tests for all type of classification and
determination of Engineering properties of soil and to ascertain rock levels /qualities of
strata at each location and submitting the soil investigation report with necessary
interpretation of the test results as directed by Engineer and as per specification. if
required, including submission of report in three copies covering investigation data and
recommendation for SBC and the pile capacity considering the design criteria, all per
specification.
3 Carry out complete alignment survey work using total station for the length and width of 0.022 On Completion of 70% On Establishment of 30% on Submission and Approval
Bridge and additional length, width to be surveyed up to TP Boundary as required, Item Benchmark and Completion of of soil Investigation Report,
including marking of TBM, its coordinates, station points, their coordinates, center line of Topographic Survey and soil detailed survey drawing with its
alignment, taking ground level details of existing structures, details of all utilities below inv at site. AUTOCAD copy and required
GL, manholes, catch pits, existing utility services, light poles, trees, over head electrical no. of paper prints.
lines, BSNL section pillar/ box, GEB electrical boxes, including any number marked on
them, road dividers, foot paths, culvert, Bridge, etc. within complete working area and
additional areas/ lengths of service road, diversion etc as and where required. Rate
includes fixing necessary reference pillars, establishing bench mark, establishing
foundation layout, and pier coordinates, including submission of longitudinal sections,
cross sections, Detailed drawing in AUTOCAD, report of survey work in three hard
colour copies with soft copy of AUTOCAD drawing, in CD to Engineer-in-charge as
directed for flyover and approaches. Submission of drawing in hard copy and soft copy as
per specification.
4 Providing and maintaining Barricading with Blinker as per enclosed drawing including 0.172 Lumpsump 70% on completion of 30% on completion of work to be
shifting as per site condition or as instructed by Engineer in charge (Barricades with Installation on prorata basis paid with final bill
blinker to remain property of contractor)
Construction of Fly over Bridge over Udhna Tin Rasta junction BILLING SCHEDULE
and Sarvottam hotel junction on Udhna main road
(Surat- Navsari road) in South (Udhna)
SURAT MUNICIPAL CORPORATION.
[BRIDGE CELL ]
Construction of Fly over Bridge over Udhna Tin Rasta junction and Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in South (Udhna) zone
A for Surat Municipal Corporation, Surat on EPC basis (Design, Engineering, Procurement and Construction)
Estimated Cost of Project (Put to Tender) : Rs.
BILLING SCHEDULE
Item No. Item Description Unit Payment Terms
5 FOUNDATION
A Carrying out Initial Pile Load Test as per approved drawing and specifications 0.085 50% on completion Of Casting 50% on Completion of Pile load
For each catagory of pile Minimum 01 (one) test of test pile test and Approval of Report
(i.e.verification of various test
results etc.)
B Providing Pile foundation including Diversion of Water way by Creation of Bund, empty 20.544 Pro rata on per 70% on completion of Piling 28% on Approval of work 2 % to be paid along with
Boring, Driving of Liner with protective coating to required length, Providing Nos. Basis work at site, after getting 7 (i.e.verification of various test progress.
Reinforcement, Concreting of Pile, Chipping of Pile including all activities required as per days results satisfactory. on results etc.i.e 28 days cube result,
approved design and specifications. [Depth of Liner shall be minimum 3.0m and as prorata basis steel testing etc all.
required for successful execution of piling, whichever is more. If the liner is not
by contractor in accordance with the tender. Pile in concrete grade M35
C Routine Dynamic Pile Load Tests (2% of the Piles in Nos) 0.305 Pro rata on per 100% On Completion & Approval and on submission of reports
Nos. Basis for that.
D Pile integrity Test ( On every Pile ) 0.114 Pro rata on per 100% On Completion & Approval and on submission of reports
Nos. Basis for that.
E Providing Pile cap including excavation, PCC, RCC & Reinforcement as per approved 10.254 Pro rata on per 70% on completion of work 28% on Approval of work 2 % to be paid along with
designs and specifications. Pilecap in concrete grade M35 Nos. Basis and getting 7 days cube results (i.e.verification of various test progress.
satisfactory results etc.i.e 28 days cube result,
steel testing etc all.
Construction of Fly over Bridge over Udhna Tin Rasta junction BILLING SCHEDULE
and Sarvottam hotel junction on Udhna main road
(Surat- Navsari road) in South (Udhna)
SURAT MUNICIPAL CORPORATION.
[BRIDGE CELL ]
Construction of Fly over Bridge over Udhna Tin Rasta junction and Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in South (Udhna) zone
A for Surat Municipal Corporation, Surat on EPC basis (Design, Engineering, Procurement and Construction)
Estimated Cost of Project (Put to Tender) : Rs.
BILLING SCHEDULE
Item No. Item Description Unit Payment Terms
6 SUBSTRUCTURE
A Providing RCC Pier, RCC Abutment & Pier Protection work including concrete, 3.016 Pro rata on per 70% on completion of work 28% on Approval of work 2 % to be paid along with
reinforcement and any other items required as per approved designs and specifications . Nos. Basis and getting 7 days cube results (i.e.verification of various test progress.
Substructure in concrete grade M35 (for solid slab and down lane Bridge) & M50 satisfactory results etc.i.e 28 days cube result,
for main Through Bridge steel testing etc all.
B Providing pier cap, Abut cap, pedestal, seismic restrainers and reinforcement including 7.872 Pro rata on per 70% on completion of work 28% on Approval of work 2 % to be paid along with
steel dowels bars, Required Anchor bolts for anti uplift arrangement as per approved Nos. Basis and getting 7 days cube results (i.e.verification of various test progress.
designs and specifications. Piercap/abut cap in concrete grade M35 (For solid slab satisfactory results etc.i.e 28 days cube result,
and Down lane Bridge) & M50 for main Through Bridge, Pedestals and seismic steel testing etc all.
restrainters in M40
C Providing RCC Retaining wall including concrete, reinforcement, filter media, weep 0.036 Pro rata on per 70% on completion of work 28% on Approval of work 2 % to be paid along with
holes, expansion joints ,Granular material etc. complete as per drawing and specifications Rmt. Basis and getting 7 days cube results (i.e.verification of various test progress.
satisfactory results etc.i.e 28 days cube result,
steel testing etc all.
D Providing Elastomeric Bearings & Tar paper Bearings including Manufacture, Supply and 1.350 Pro rata on per 75% on Supplying items duly 25% on Fixing at Site as per
Installation. Nos. Basis tested by authority detailed drawings and on
submission of back to back
guarantee as per tender.
Construction of Fly over Bridge over Udhna Tin Rasta junction BILLING SCHEDULE
and Sarvottam hotel junction on Udhna main road
(Surat- Navsari road) in South (Udhna)
SURAT MUNICIPAL CORPORATION.
[BRIDGE CELL ]
Construction of Fly over Bridge over Udhna Tin Rasta junction and Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in South (Udhna) zone
A for Surat Municipal Corporation, Surat on EPC basis (Design, Engineering, Procurement and Construction)
Estimated Cost of Project (Put to Tender) : Rs.
BILLING SCHEDULE
Item No. Item Description Unit Payment Terms
7 SUPER STRUCTURE (Approach & Railway Portion)
A Providing, Casting in Yard , Transporting , Launching RCC(If permitted)/PSC 34.544 Pro rata on per 70 % on casting of Girder, and 28% on completion of required 2 % to be paid along with
Superstructure in minimum M-45 Grade or as approved by R&B Design Circle Nos. Basis getting 7 days cube results stressing and launching of progress.
including PSC girders , Box , Slabs, also including casting yard, casting bed, concrete, satisfactory girders and verification of
Reinforcement, Prestressing Strands and complete anchorage system, HDPE sheathing, various test results etc.)
grouting, seismic arresters, prestressing, shifting, transporting, launching, staging,
Formwork shuttering, deshuttering, carefully, making good the damages, with all lead and
lift with contractor’s labour, tools & plants, machineries, as required, with Exposed
concrete, finishing etc. including all items and activities required to complete the item as
per approved design and specifications.
B Providing concreting & reinforcement of cast-in-situ Solid Deck slab, Diaphragm 9.527 Pro rata on per 70 % on completion of work 28% on Approval of work (i.e, 2 % to be paid along with
minimum M-40 Grade or as approved by R&B Design circle including Nos. Basis (casting of diaphragm and verification of various test results progress.
transporting,staging,Formwork shuttering,deshuttering, carefully, making good the deck slab) etc.)
damages with all lead and lift with contractor's labour, tools & plants, machineries as
required with exposed concrete finishing etc. all times and activities required as per
approved design and specifications.
C Providing and Installation Strip Seal type Expansion Joints, Deck continuity arrangement 0.982 Pro rata on per 75% on Supply of materials 23% on Fixing at Site as per 2 % to be paid along with
& asphalt filler joints as per approved Design, Drawings and Specifications. Nos. Basis duly tested by Authoirty detailed drawings progress after producing
Performance Guarantee
D Carry out Superstructure Load test as per approved Design, Drawing and Specifications. 0.019 On Completion of 100% on Approval of test and on submission of report duly
Item approved.
E Providing RCC Anticrash barrier and Cetral verge/New Jersey type Crash barrier in M40 3.143 Pro rata on per 70% on completion of work 30% on Approval of work
including providing and fixing M.S anchor plates for fixing street light poles, Parapet Rmt. Basis (i.e.verification of various test
wall, Kerb e including reinforcement as per approved Design, Drawing and results etc.)
Specifications.
F Providing RCC Approach Slab in M35 including reinforcement including all items 0.136 On Completion of 70% on completion of work 30% on Approval of work
required as per approved design, drawing and specifications. Item (i.e.verification of various test
G Providing DWC Pipes of Required size (Diameter as decided by engineer in charge ) in 0.057 Pro rata on per 70% on completion of work 30% onresults etc.)of work
RCC anti crash barrier, Central verge for the entire length of bridge and approaches as per Rmt. Basis (i.e.verification of various test
approved drawing and specifications and as per SMC requirement. results etc.)
Construction of Fly over Bridge over Udhna Tin Rasta junction BILLING SCHEDULE
and Sarvottam hotel junction on Udhna main road
(Surat- Navsari road) in South (Udhna)
SURAT MUNICIPAL CORPORATION.
[BRIDGE CELL ]
Construction of Fly over Bridge over Udhna Tin Rasta junction and Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in South (Udhna) zone
A for Surat Municipal Corporation, Surat on EPC basis (Design, Engineering, Procurement and Construction)
Estimated Cost of Project (Put to Tender) : Rs.
BILLING SCHEDULE
Item No. Item Description Unit Payment Terms
H Providing and laying DBM , BC wearing coat with bitumin painting as per approved 1.622 Pro rata on per MT. 70% on completion of work 28% on Approval of work 2 % to be paid along with
thickness on bridge deck and on both side approches as per approved crust including Box Basis (i.e.verification of various test progress
cutting, rolling and compaction of subgrade, earthwork for embankment,sand filling, results etc.)
GSB, WMM, Prime coat, Tack coat, including any other item required as per approved
Design, Drawings and specifications. A suitable primer may be necessary. Complete
procedure shall be done as per the Engineer in-charge.
I Providing and laying Mineral Water proofing Membrane 4mm - SUPER SHIELD 1.047 Pro rata on per MT. 70% on completion of work 28% on Approval of work 2 % to be paid along with
BRIDGE PROTEK (App Membrane for bridge decks polyester and FG reinfoeced ), Basis (i.e.verification of various test progress
Include water-based primer (SUPER PRIMER) Including Gas Torching, overlapping of results etc.)
membrane for complete scope of work including all requisite material,consumables and
Construction of Fly over Bridge over Udhna Tin Rasta junction BILLING SCHEDULE
and Sarvottam hotel junction on Udhna main road
(Surat- Navsari road) in South (Udhna)
SURAT MUNICIPAL CORPORATION.
[BRIDGE CELL ]
Construction of Fly over Bridge over Udhna Tin Rasta junction and Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in South (Udhna) zone
A for Surat Municipal Corporation, Surat on EPC basis (Design, Engineering, Procurement and Construction)
Estimated Cost of Project (Put to Tender) : Rs.
BILLING SCHEDULE
Item No. Item Description Unit Payment Terms
8 Miscellaneous Items
A Providing and fixing 100 mm Dia Drainage Spouts as per MOST drawing no. SD/303 0.202 Lumpsump 70% on Installation 25% on Completion of Work
including gratings with clean out fixtures with 160 mm U-PVC Pipe as a longitudinal (i.e.verification of various test
runner Pipe conduits including cost of all material, labour, fixing in true line and level, results etc.)
including bends, fixtures, special, etc. complete with all lifts and leads etc. as per
specifications and as directed by engineer in-charge.
B Providing and fixing RCC Pylons on either side bridge including one coat of approved 0.014 Lumpsump 75% on Installation 25% on Completion of Work to
primer and two coats of textured mat paint for exposed surface of pylons as per approved be paid with final Bill
drawing and specifications [Minimum 2 Nos.].
C Providing and applying one coat of zinc-rich epoxy primer and two coats of coal tar epoxy 0.105 Lumpsump 90% on application of paint 10% on Completion of Work to
paint of reqd. thickness as per specifications to all concrete surfaces in contact with earth satisfactorily at site as per be paid with final Bill and on
in foundation of substructure including all cost of material, labour, transportation and Tender specifications. completion of all finishing,
preparing the surfaces by cleaning, washing, brushing, sand / grit blasting etc. complete as
directed by Engineer and as per specification. (Paint shall be got tested from approved
laboratory).
D Providing and applying two coats of Anti-Carbonation Paint (ACP) with the dry film 1.603 Lumpsump 90% on application of paint 10% on Completion of Work to
thickness (DFT) of each coat shall not be less than 100 micron, Anti-Carbonation Paint satisfactorily at site as per be paid with final Bill and on
(ACP) of makes as per tender and shade/colour as approved by Engineer-in-charge, Tender specifications. completion of all finishing,
surface preparation, applying primer coat as per the makes listed in the tender, including
all type of scaffolding, safety accessories, labour, all materials, lead, lift, tools, plants,
taxes, testing etc to execute the work as directed, etc. complete for sub structure (Pier
(Pile cap to Pier cap), Pier Cap, abutment, abutment cap, dirt wall, pedestals, seismic
arrester , Return/Retaining wall) and Super Structure components.
E Providing and applying one coat of approved Primer and two coats of approved Synthetic 0.177 Lumpsump 90% on application of paint 10% on Completion of Work to
enamel paint to kerb and inner side of RCC anticrashbarrier satisfactorily at site as per be paid with final Bill and on
Tender specifications. completion of all finishing,
F Providing and applying Road Markings with hot applied thermoplastic compound as per 0.062 90% on application of 10% on Completion of Work to
approved thickness. marking as per Tender be paid with final Bill
G Providing, supplying and fixing necessary sign boards of Retro Reflective type as
(a) Information sign boards (B) High Intensity Grade 0.006 90% on Installation 10% on Completion of Work to
be paid with final Bill
Construction of Fly over Bridge over Udhna Tin Rasta junction BILLING SCHEDULE
and Sarvottam hotel junction on Udhna main road
(Surat- Navsari road) in South (Udhna)
SURAT MUNICIPAL CORPORATION.
[BRIDGE CELL ]
Construction of Fly over Bridge over Udhna Tin Rasta junction and Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in South (Udhna) zone
A for Surat Municipal Corporation, Surat on EPC basis (Design, Engineering, Procurement and Construction)
Estimated Cost of Project (Put to Tender) : Rs.
BILLING SCHEDULE
Item No. Item Description Unit Payment Terms
(b) Cautionary Sign boards (B) High Intensity Grade 0.006 90% on Installation 10% on Completion of Work to
be paid with final Bill
(c) Mandatory and Directional Sign boards (B) High Intensity Grade 0.005 90% on Installation 10% on Completion of Work to
be paid with final Bill
H Cat Eye / Road Stud / RPM: Supplying Raised Pavement Markers made of polycarbonate 0.025 90% on Installation 10% on Completion of Work to
and ABS moulded body and reflective panels with Micro prismatic lens (No Glass bead be paid with final Bill
lens) capable of providing total internal reflection of the light entering the lens face and
shall support a load of 13635 kgs.tested in accordance to ASTM D 4280 Type H and
complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97
Ð DO III Dt 11.06.1997. The height, width and length shall not exceed 20 mm, 130 mm
and 130 mm and with minimum reflective area of 13 Sqcm on each side and the slope to
the base shall be 35 +/- 5 degree. The body of the marker should having finger grip for
easy and accurate placement and application with epoxy / bituminous Adhesive as
recommended by the manufacturer of the marker. The color of the marker should be as
per the IRC 35-2015 and as directed by Engineer-in-charge.
I Providing and fixing guard stone as per IRC type design including white washing, etc. 0.016 90% on Installation 10% on Completion of Work to
complete including fixing in CC 1:5:10. be paid with final Bill
J Supplying and fixing road sign board of MS Plates and angle iron including painting, 0.005 90% on Installation 10% on Completion of Work to
lettering, etc. complete including excavation, etc. complete as per IRC type design - be paid with final Bill
Reflective Type.
K Providing laying (to level or slopes) and jointing RCC non-pressure pipes IS class NP- 0.048 90% on Installation 10% on Completion of Work to
3 for 1200 mm diameter for drainage of water in to nearest nalla/ drain, brick masonry be paid with final Bill
chambers, along with RCC frames and covers over chambers.with collars and butt ends
prepared for collar joints including testing of joints, complete.
L Providing and fixing of 4 mm thk ACP Takti or SS Takti with minimum Size of 4' x 3' on 0.122 Lumpsump 75% on Installation 25% on Completion of Work to
RCC/Decorative pylons or directed by client along with Water Proof Mandap of minimum be paid with final Bill
Size 100'x100', 75 Nos of VIP Chairs, 15 Nos of VIP Sofa including necessary electric
fixtures like fan,cooler,lighting arrangement, D.G Sets etc as per site requirement and
required to make it functional or as directed by Engineer In charge for Functions of Khat
Muhurt and Lokarpan Vidhi/Vidhies of above work.
Construction of Fly over Bridge over Udhna Tin Rasta junction BILLING SCHEDULE
and Sarvottam hotel junction on Udhna main road
(Surat- Navsari road) in South (Udhna)
SURAT MUNICIPAL CORPORATION.
[BRIDGE CELL ]
Construction of Fly over Bridge over Udhna Tin Rasta junction and Sarvottam hotel junction on Udhna main road (Surat- Navsari road) in South (Udhna) zone
A for Surat Municipal Corporation, Surat on EPC basis (Design, Engineering, Procurement and Construction)
Estimated Cost of Project (Put to Tender) : Rs.
BILLING SCHEDULE
Item No. Item Description Unit Payment Terms
M Brick work using common burnt clay conventional building bricks having crushing 0.168 Lumpsump 70% on completion of work. 30% of Approval of work
strength not less than 50 kg/sq.cm in cement mortar 1:5 (1Cement : 5 fine sand) in
foundation.
N 20mm thick sand faced cement plaster on wall upto height 10 meters above ground level 0.002 Lumpsump 70% on completion of work. 30% of Approval of work
consisting of 12mm thick backing coat of C.M 1:3 (1cement : 3sand) and 8mm thick
finishing coat of C.M 1:1(1cement : 1sand) etc.complete as directed by engineer in-
O Providing and Casting in situ Controlled cement concrete of M 20 for RCC Raft, cut off
walls/ Kerb/Kerb blocks including formwork curing and finishing complete.
P Providing, Fabricating, transporting, installing M.S.steel structure Gantry (7.0 mt vertical 0.321 Lumpsump 70% on completion of work. 30% of Approval of work
clearance from road level) at entry and exit location of the ROB and ramps as shown in
the drawings with retroreflective Alluminium Composite panel direction boards on the
gantry as per specification (4 nos of boards (244 x 122 cm size ) per gantry) and(
Q Construction of the Ground water recharge borewell system including the drilling of 0.379 70% on completion of work. 30% of Approval of work
300.mm dia bore, cleaning, foundation, pcc, plaster for the chamber, supplying of the
PVC pipe, Perforated pipe, provision of the wire mesh around the perforated pipe, with all
necessary to complete the recharge borewell system. All material shall be as per SMC
approved make list.
9 BRTS Bus stand demolition & reconstruction as directed by Engineer In charge. 1.506 Pro rata on per 70% on completion of work. 30% of Approval of work
Contractor has to dimolist 2 Nos of BRTS Bus stand and construct same as per existing Nos. Basis
bus stand or as per new design of bus stand at the location final by client.
Note : 1. The above percentages shall be applicable for making payment to the contractor. No change shall be entertained in the above payment terms.
2. The above items descriptions are to facilitate interim payments to the contractor. This does not absolve the contractor of his responsibility of executing any items which may be required for the successful completion of the work
as per the General Arrangement Drawing, Scope of work, Specifications, Conditions of Contract and Codal Requirements.
3. Any further break up in the items for payment purpose shall be done as per Estimate prepared and approved by Surat Municipal Corporation.
4. In case of disputes regarding further breakup of payment of any items, decision of the client shall be final and acceptable by the contractor.
Sign, seal and address of the contractor: Executive Engineer (Bridge Cell)
Date: Surat Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01_VOL-I-TECH BID.pdf
02_VOL-II-TECH SPECIFICATIONS.pdf
03_VOL-III-PRICE BID.pdf
04_GAD.pdf
ADDENDA-1.pdf
Download all tender documents and submit your bid