Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-AOC | ₹8.5 L | 1 | Accepted-AOC lowest |
| 2 | 2₹8.9 LRejected-Finance | ₹8.9 L | 2 | Rejected-Finance 2nd lowest |
Tender Value
₹8.5 L
EMD Value
₹21,200
Closing Date
6 Mar 2026, 6:30 pmClosed
EXECUTIVE ENGINEER, TDB, MAVELIKKARA
OFFICE OF THE EXECUTIVE ENGINEER, TDB, MAVELIKKARA-690101
Cherthala devaswom in Ambalapuzha group-Annual maintenance works to temple structures,putting up pandal,cleaning the temple yard and temple ponds in connection with festival
2026_TDB_843111_1
EEM/ET-154/2025-26
Open Tender
Repair and Maintenance Works
20 days
Mavelikkara
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,006
₹21,200
17 Mar 2026
3 Mar 2026
7 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
Appendix I - Annual maintenance to temple structure
Water washing and cleaning the old painted surface with pressure pump including hire charges of pump etc complete
Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm).
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work
Varnishing with varnish of approved brand and manufacture:One or more coats with copal varnish
Appendix II - Putting up pandal
Hire and labour upto a period of 10 days for putting up muttupanthal upto 8m wide with bamboo post at 1.5m centre, double bamboo for brussumers, single longitudinal runners at about 1.50m centre rafters at about 0.6m centre and cross ties supported on trusses at about 3.7m with aracanut horizontal ties at top and bottom aracanut post supporting ridge pieces at end tying members firmly with coir yarn and thatching with silpaulin plastic film 200 GSM dismantling after use in temple compound.
Hire and labour charges for a period of 10 days for putting up Thattupandal with casuarina poles for post and rafters at 60 cm apart and thatching with silpaulin plastic film 200 GSM firmly with coir or plastic wire including dismantling and removing materials after use.
Hire and labour charges for a period of 10 days for putting up Viripandal with casuarina poles intermediate and horizontal support casuarina with 1.50 c/c apart and thatching with silpaulin plastic film 200 GSM firmly with coir or plastic wire including dismantling and removing materials after use.
Hire and labour up to a period of ten days for mull cloth ceiling to pandal including redfrills
Appendix III - Cleaning temple yard,pooram yard and pallikulam yard
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Appendix IV- Cleaning temple yard,pooram yard and pallikulam yard
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Clearing and removing water hydrant from the temple pond by means of labour
Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
labour charges for cleaning the steps,well and collecting the plastic waste and other debris from the pond
Appendix V- Cleaning the Cherakulam and Kalikulam
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Clearing and removing water hydrant from the temple pond by means of labour
Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
labour charges for cleaning the steps,well and collecting the plastic waste and other debris from the pond
Appendix VI- Cleaning the Thanthrikulam,Kelankulam
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Clearing and removing water hydrant from the temple pond by means of labour
Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
labour charges for cleaning the steps,well and collecting the plastic waste and other debris from the pond
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
priliminaryagreement.pdf
Tender Documents • 0.32 MB
BOQ_1422999.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid