Loading…
Loading…
Tender ID
Tender Value
₹1.8 L
EMD Value
₹1,850
Closing Date
17 Mar 2026, 12:00 pmClosed
DEPUTY EXECUTIVE ENGINEER, NADIAD ELECTRICAL SUB DIVISION, NADIAD
All in Comprehensive Maintenance of water cooler installed at Non residential Buildig under Nadiad Section of Nadiad Electrical Sub Division,Nadiad.(for 1 year)
283987
32/02 OF 2025/2026
Open
Electrical and Maintenance Works
Works
Nadiad
8 documents required · 8 mandatory
₹600
Yes
Executive Engineer, Ahmedabad Electrical Dn No 2 Ahmedabad
₹1,850
Yes
7 Mar 2026
7 Mar 2026
7 Mar 2026
17 Mar 2026
7 Mar 2026
Name of work :- All in Comprehensive Maintenance of water cooler installed at Non residential Buildig
under Nadiad Section of Nadiad Electrical Sub Division,Nadiad.(for 1 year)
Fund Head:- 2059 M & R SR
T.S.No.:- Circle office No. 44 of 2025-26. Dt: 27/01/2026.
Item Quantity Particulars Issue Rate Amount
Signature of Contractor Deputy Executive Engineer
Nadiad R & B Electrical Sub Division
Name of Work :- All in Comprehensive Maintenance of water cooler installed at Non residential Buildig under Nadiad Section of Nadiad
Electrical Sub Division,Nadiad.(for 1 year)
Item Qty. Unit Item of work Net Rate in Net Rate in words. Per Amount
1 53.00 Pts. All inclusive comprehensive maintenance cost for the period 3339.06 Rupees Three Pt.
of one year for the water Cooler of following Capacity.(B) Thousand Three
120 / 150 Ltr capacity.Note: (1) The All inclusive Hundred Thirty Nine
comprehensive maintenance cost covers the yearly And Paise Six Only
maintenance cost of the electrical machineries with material
& Labour cost including preventive maintenance. The cost
covers entire installation from outlet of main switch to
electrical machine.(2) All inclusive comprehensive
maintenance cost of Split type Air conditioners & Water
coolers covers the yearly maintenance & preventive
maintenance with all required painting materials & labours.
including sheet metal work, refrigerant gas , compressor & all
the contains parts. The cost covers entire installation from
outlet of main switch to the Unit.
2 3.00 Pts. All inclusive comprehensive maintenance cost for the period 2654.28 Rupees Two Thousand Pt.
of one year for the water Cooler of following Capacity.(A) 80 Six Hundred Fifty Four
Ltr capacity.Note: (1) The All inclusive comprehensive And Paise Twenty
maintenance cost covers the yearly maintenance cost of the Eight Only
electrical machineries with material & Labour cost including
preventive maintenance. The cost covers entire installation
from outlet of main switch to electrical machine.(2) All
inclusive comprehensive maintenance cost of Split type Air
conditioners & Water coolers covers the yearly maintenance
& preventive maintenance with all required painting materials
& labours. including sheet metal work, refrigerant gas
compressor & all the contains parts. The cost covers entire
installation from outlet of main switch to the Unit.
Amount Put to tender Rs.
Item Qty. Unit Item of work Net Rate in Net Rate in words. Per Amount
Rupees One Lakh(s) Eighty Four Thousand Nine Hundred Thirty Three And Paise Two Only
I/ We am/are willing to carry out the work at_________% above / below percent (should be written in figure & words) of the estimated mentioned above. Amount of my / our tender works out as
Estimated amount put to Estimated amount put to
(a) I/we hereby declare that we have visited the site and fully exquisite myself/ourselves with the Local situation regarding materials labour and other factors pertaining to work before
submitting Tender.
(b) I/we hereby declare that we have carefully studies the conditions of contracts. Detailed Specification and other tender document of this work and agree to execute the same accordingly.
1 The Rates are inclusive of all taxes, transport charges, storage charges and other taxes excluding GST as applicable from time to time.
2 All works shall be carried out as per public works Department hand book and other Specification.
3 Rates are inclusive of 1% Labour cess in tender amount so 1% of total amount of bill will be deducted from the bill.
3 Rates are inclusive of 1% Labour cess in tender amount so 1% of total amount of bill will be deducted from the bill.
4 The material to be used in this work must be as per instruction by under liason of Engg. In charge.The agency will have to agree to carried out the work as per brand/make demand of
5 Contractor must have registration in "E2" & above class registered under elect. (R & B) division .
6 If required and found necessary material to be used for this work & brought at site will hae to sent to Govt. approved laboratory. Necessary testing cost to be beared by
agency/manufacturer of the particular product.
Deputy Executive Engineer
Nadiad R & B Electrical Sub Division
Signature of contractor Nadiad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Condition for work no-2.pdf
G S T LTR.pdf
GR.pdf
online jaher nivida-32 of 2025-26.pdf
PQ.pdf
schedule a and b.pdf
STANDARD BIDDING DOCUMENTS.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .