Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1 st₹7.6 LAccepted-AOC | 1 st | Accepted-AOC 1 st lowest | |
| 2 | 2 nd₹7.7 L+₹9,813.35 (1.29%)Rejected-AOC | 2 nd | Rejected-AOC 2 nd lowest | |
| 3 | 3rd₹7.8 L+₹13,101.92 (1.72%)Rejected-AOC KERALA KL KERALA | 3rd | Rejected-AOC 3 rd lowest | |
| 4 | 4 th₹8.5 L+₹83,274.67 (10.9%)Rejected-AOC KANNADIKKUZHI HOUSE RAMANATTUKARA VAZHAYUR EAST PO | 4 th | Rejected-AOC 4 th lowest |
Tender Value
₹10.2 L
EMD Value
₹25,414
Closing Date
29 Apr 2023, 6:55 pmClosed
Assistant Executive Engineer
O/o,Assistant Executive Engineer, KYIP Canal Sub Division Vadakara
Rectification and Maintenance of peruvayal fb canal
2023_Irrig_572820_1
IRR/PI/TR/8097/2022_5_6_5/1
Open Tender
Civil Works - Canal
Item Rate
180 days
peruvayal
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹25,414
Yes
24 Jun 2023
20 Apr 2023
2 May 2023
20 Apr 2023
29 Apr 2023
20 Apr 2023
20 Apr 2023 - 29 Apr 2023
Amount
Canal work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
LIJIN T
VK BALAN
HAREESH KUMAR V K
Bidder Name
VK BALAN
HAREESH KUMAR V K
Sakthi Labour Contract Co-operative Society Limited
LIJIN T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_845714.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .