| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 CrAdmitted-Finance | ₹19.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹22.5 CrAdmitted-Finance T 10 3RD FLOOR CITY CENTRE PRESS COMPLEX PLOT NO 1 M P NAGAR ZONE I BHOPAL M P 462011 | BHOPAL | BHOPAL | MADHYA PRADESH | 462011 | ₹22.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹23.1 CrAdmitted-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | ₹23.1 Cr | L3 | Admitted-Finance |
| 4 | L4₹27.2 CrAdmitted-Finance ARTEFACT TOWER PLOT NO 54 3 CHHATRAPATI SQUARE WARDHA ROAD NAGPUR | NAGPUR | ₹27.2 Cr | L4 | Admitted-Finance |
| 5 | L5₹33.1 CrAdmitted-Finance 8 C 1 SECTOR NO 21 MIHAN AREA NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | ₹33.1 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Technocrats Advisory Services Pvt. Ltd. L1 | K and J Projects Pvt Ltd L5 | Artefact Projects Ltd. L4 | Geo Designs and Reserch Pvt. Ltd. L3 | L N MALVIYA INFRA PROJECTS PVT LTD L2 |
|---|---|---|---|---|---|---|---|---|
| 10.00A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES) | ||||||||
| 20.00 | Local Consultants
Remuneration for Local Professional Staff
(inclusive of per diem allowance) | 1 | Nos | 80,00,000 ₹80 L | 1,31,05,000 ₹1.3 Cr | 78,35,000 ₹78.3 L | 45,71,500 ₹45.7 L | 49,80,000 ₹49.8 L |
| 30.00 | Support Staff (inclusive of per diem allowance) | 1 | Nos | 10,35,000 ₹10.3 L | 7,38,000 ₹7.4 L | 7,20,000 ₹7.2 L | 5,28,000 ₹5.3 L | 4,95,000 ₹5.0 L |
| 40.00 | Transportation | 1 | Nos | 4,95,000 ₹5.0 L | 4,95,000 ₹5.0 L | 3,15,000 ₹3.1 L | 9,00,000 ₹9 L | 5,40,000 ₹5.4 L |
| 50.00 | Duty Travel to Site | 1 | Nos | 1,25,000 ₹1.3 L | 3,00,000 ₹3 L | 20,000 ₹20,000 | 4,32,000 ₹4.3 L | 50,000 ₹50,000 |
| 60.00 | Office Rent | 1 | Nos | 3,60,000 ₹3.6 L | 3,15,000 ₹3.1 L | 3,15,000 ₹3.1 L | 2,70,000 ₹2.7 L | 3,60,000 ₹3.6 L |
| 70.00 | Office Supplies, Utilities and Communication | 1 | Nos | 1,44,000 ₹1.4 L | 1,80,000 ₹1.8 L | 36,000 ₹36,000 | 1,29,600 ₹1.3 L | 1,80,000 ₹1.8 L |
| 80.00 | Office Furniture and Equipment (Rental) | 1 | Nos | 2,25,000 ₹2.3 L | 2,25,000 ₹2.3 L | 3,00,000 ₹3 L | 3,51,000 ₹3.5 L | 2,25,000 ₹2.3 L |
| 90.00 | Reports and Document Printing | 1 | Nos | 45,200 ₹45,200 | 33,17,500 ₹33.2 L | 4,57,000 ₹4.6 L | 14,58,750 ₹14.6 L | 1,13,000 ₹1.1 L |
| 100.00Surveys & Investigations | ||||||||
Tender Value
₹33 Cr
Closing Date
11 Feb 2022, 3:00 pmClosed
Chief Engineer - Regional Officer, MoRTH Lucknow
Chief Engineer - Regional Office, MoRTH N.H. Bhawan, Biotech Chowk, Lucknow Ring Road, Vikas Nagar, Lucknow 226 022
PMC for preparation of DPR, Pre construction activity and Project supervision for the work of Widening to 4 lane of Jaunpur Akbarpur section of NH135A and 4 lane Mirzapur Bypass along with 2 Nos ROBs on NH135A(Excluding Major Bridge over Ganga River)
2022_MoRTH_670366_1
CE-RO/LKO/PMC/Lot-II/2021-22 Dated. 27.01.2022
Open Tender
Consultancy
2790 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
AS PER BID DOCUMENT
Exempted
Chief Engineer - Regional Office, MoRTH Lucknow
5 May 2022
27 Jan 2022
14 Feb 2022
27 Jan 2022
11 Feb 2022
27 Jan 2022
3 Feb 2022
Amount
A. For Phase 1 & 2 (DPR and PRECONSTRUCTION ACTIVITIES)
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixing boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total cost net of Goods &service tax**
B. For Phase 3 (Construction Supervision and Maintenance)
Remuneration for Local Professional Staff
Supporting Staff
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment
Reports and Document Printing
Road Survey Equipment
Contingencies
Total Cost net of Goods &Service Tax**
Total for Phase 1,2 &3
Grand Total net of Goods and Service tax (for all 3 phases)
Goods & Service Tax
Grand Total including goods and service tax (for all 3 phases)
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring) Rate (INR) Quantity Amount (INR) Amount (INR) in Words
a) Boring in all type of soils other than hard rock
b) Boring in hard rock)
Sub Total
Note:* Quantities of borings shall be taken from Financial Proposal Form No.V. For financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, Payment shall be made on the actual quantity of boring at rates quoted above by the Consultant, which may be substantially more or less than the estimated quantities. Actual boring requirement would be strictly as per the codal provision.
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a repository for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC: 25, 1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/orconstruction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Description of Work / Item(s)
Amount
Remuneration of Expatriate staff including per diem allowances
Description of Work / Item(s)
Amount
International Airfares (Fixed costs)
Inland Travel in Home Country (Fixed Costs)
Description Lump Sum RATE Trips Amount
Inland Travel in Home Country (Fixed Costs)
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Trips Amount
Other Miscellaneous expenses (like DA, internal travel expenses other incidentals)
Sub Total for Mobilization and Demobilization
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader Cum Senior Highway Engineer
Resident cum Highway Engineer (2 nos)
Senior Bridge Engineer
Highway cum Pavement Engineer
Senior Quality cum Material Expert
Road/Traffic Safety expert
Sub Total
B: Sub Professional Staff Construction Period 24 months+DLP 60 months (To be decided by the Authority as per requirement of the Project at the time of preparation of RFP)
Survey Engineer (2 nos)
Assistant Highway Engineer (3 nos)
CAD Expert
Environmental Engineer
Assistant Bridge Engineer (2 nos)
Assistant Quality cum Material Engineer (3 nos)
Electrical Engineer
HTMS/Toll Expert
Quantity Surveyor
Horticulture cum Landscaping Expert
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Accountant cum cashier
Steno cum Computer Operator
Office Boy (1 no)
Description of Work / Item(s)
Amount
Description of Vehicles
Description of Vehicles
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum SeniorHighway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Road/Traffic Safety Expert
Environmental Specialist
Quantity Surveyor/ Documentation Expert
Land Acquisition Expert
Utility Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Staff 7
Sub Total
Description of Work / Item(s)
Amount
professional and sub professional staff trips * Rate quoted includes Hotel charges, travel cost etc.complete
Description of Work / Item(s)
Amount
Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete.
Description of Work / Item(s)
Amount
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment ( Rental ) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2external &10 internal lines), photocopier (15ppm, 12000copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Description of Work / Item(s)
Amount
Monthly reports (Design and Construction)
Half yearly Reports
Various others reports as provided in the EPC Agreement such as Completion Report
Description of Work / Item(s)
Amount
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Bridge inspection using Mobile Bridge Inspection Unit or Drone technology
Road signs inspection using Retro Reflectometer
Description of Work / Item(s)
Amount
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Authority
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The rent cost includes maintenance, Cleaning, repairs, etc.
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report 9 months (per month 3)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
Artefact Projects Ltd.
K and J Projects Pvt Ltd
Geo Designs and Reserch Pvt. Ltd.
Technocrats Advisory Services Pvt. Ltd.
K and J Projects Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
Technocrats Advisory Services Pvt. Ltd.
Artefact Projects Ltd.
K and J Projects Pvt Ltd
Technocrats Advisory Services Pvt. Ltd.
Artefact Projects Ltd.
K and J Projects Pvt Ltd
Geo Designs and Reserch Pvt. Ltd.
Artefact Projects Ltd.
Technocrats Advisory Services Pvt. Ltd.
K and J Projects Pvt Ltd
Geo Designs and Reserch Pvt. Ltd.
Geo Designs and Reserch Pvt. Ltd.
Artefact Projects Ltd.
K and J Projects Pvt Ltd
Technocrats Advisory Services Pvt. Ltd.
K and J Projects Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
Artefact Projects Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
K and J Projects Pvt Ltd
Artefact Projects Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
Artefact Projects Ltd.
K and J Projects Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
Artefact Projects Ltd.
Technocrats Advisory Services Pvt. Ltd.
K and J Projects Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
Technocrats Advisory Services Pvt. Ltd.
K and J Projects Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
Artefact Projects Ltd.
Technocrats Advisory Services Pvt. Ltd.
K and J Projects Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
Technocrats Advisory Services Pvt. Ltd.
K and J Projects Pvt Ltd
Geo Designs and Reserch Pvt. Ltd.
K and J Projects Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
Artefact Projects Ltd.
Geo Designs and Reserch Pvt. Ltd.
Artefact Projects Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
K and J Projects Pvt Ltd
Geo Designs and Reserch Pvt. Ltd.
Artefact Projects Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
K and J Projects Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
K and J Projects Pvt Ltd
Artefact Projects Ltd.
Geo Designs and Reserch Pvt. Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
K and J Projects Pvt Ltd
Artefact Projects Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
Technocrats Advisory Services Pvt. Ltd.
Artefact Projects Ltd.
Geo Designs and Reserch Pvt. Ltd.
Geo Designs and Reserch Pvt. Ltd.
Artefact Projects Ltd.
K and J Projects Pvt Ltd
Technocrats Advisory Services Pvt. Ltd.
Technocrats Advisory Services Pvt. Ltd.
K and J Projects Pvt Ltd
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
Technocrats Advisory Services Pvt. Ltd.
K and J Projects Pvt Ltd
Geo Designs and Reserch Pvt. Ltd.
Artefact Projects Ltd.
K and J Projects Pvt Ltd
Technocrats Advisory Services Pvt. Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
Geo Designs and Reserch Pvt. Ltd.
Technocrats Advisory Services Pvt. Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
K and J Projects Pvt Ltd
Technocrats Advisory Services Pvt. Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
Artefact Projects Ltd.
Geo Designs and Reserch Pvt. Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
Artefact Projects Ltd.
Geo Designs and Reserch Pvt. Ltd.
K and J Projects Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
RFP.pdf
Tender Documents • 7.69 MB
BOQ_705541.xls
BOQ • 0.98 MB
Download all tender documents and submit your bid